State Warehousing Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
State Warehousing Corporation Tender
Civil And Construction
Civil Works Others
Building Construction
Opening Date3 Jan 2025
Closing Date22 Jan 2025
Tender Amount₹ 7,51,185
Costs
EMD
₹ 7,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
777729Tender No
1/SWC/Const/6268/2024-25Tender Authority
State Warehousing Corporation ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Plastering 12mm thick single coat with cement mortar (1:4) Prop. to RCC works with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads machine mixing etc., complete for finished item of work.For Verandah nose beam.
80
371
29680
... More
Compound Wall: Hiring an Excavator (JCB) for clearing & leveling the site, filling the existing pits with available earth/soil, shifting the unserviceable material to the nearest dumping area, etc., complete as directed by the Engineer-in-charge for finished item of work.
15
1500
22500
... More
Earthwork excavation for foundations in ordinary gravel soils and disposal of soils as directed by the officer in charge of work including all leads and lifts, shoring, strutting etc., excluding bailing out of water complete for finished item work.
7
431
3017
... More
Filling foundations with cement concrete (1:5:10) Prop. Using 40 mm gauge (HBG) metal including cost and conveyance of all materials to site of work, labor charges, shoring, strutting, machine mixing and laying of concrete, compacting including curing hire and oprational charges of tools and plants required as directed by the Engineer-in-charge of work
2
4098
8196
... More
RCC (1:11/2:3)Nominal mix coresponding to Table 9 of IS 456 using 20mm size graded machine crushed metal from approved quarry including cost and conveyance of all materials to site and including seinorage charges on all materials including all operational incidental and labour charges such as machine mixing, laying concrete,curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work including centering and shuttering,contractor profit and seignorage charges.For Footings.
1.6
9200
14720
... More
RCC (1:11/2:3)Nominal mix coresponding to Table 9 of IS 456 using 20mm size graded machine crushed metal from approved quarry including cost and conveyance of all materials to site and including seinorage charges on all materials including all operational incidental and labour charges such as machine mixing, laying concrete,curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work including centering and shuttering,contractor profit and seignorage charges.For Columns.
1.5
11202
16803
... More
RCC (1:11/2:3)Nominal mix coresponding to Table 9 of IS 456 using 20mm size graded machine crushed metal from approved quarry including cost and conveyance of all materials to site and including seinorage charges on all materials including all operational incidental and labour charges such as machine mixing, laying concrete,curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work including centering and shuttering,contractor profit and seignorage charges.For Plinth Beam.
1.5
11586
17379
... More
Supply of steel including cutting, bending, cranking, tying grills and placing them in position including fabrication charges cost of materials and binding wire etc., complete for finished item of work complete as directed by the Engineer-in-charge of work. Ribbed steel.
0.22
88432
19455
... More
Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290 x 225 x 140mm for manufacturing of fly ash solid blocks using fly ash 80Kgs, cement of 15 Kgs gypsium of 5Kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50 Kgs for 225mm thick walls For Superstructure.
7
7214
50498
... More
Plain Cement Concrete (1:2:4) Prop. Using 20mm size ISI gauge hard broken granite machine crushed metal including cost and conveyance of all materials to site of work and labour charges, centering, machine mixing, laying, curing and all other incidental and operational charges, water leads etc., for the following items and as directed by the Engineer-in-charge of work. For Bed Blocks
0.7
6205
4344
... More
Filling inside with excavated earth in low lying areas and wherever required and as directed by Engineer-in-charge of work etc., complete
7
113
791
... More
Plastering 12mm thick single coat with cement mortar (1:4) Prop. to RCC works with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads machine mixing etc., complete for finished item of work for all heights
12
371
4452
... More
Plastering 12mm thick to Brick masnory in one coat with cement mortar (1:6) Prop. with sponge finishing including cost and conveyance of materials to site of work, curing including all water leads machine mixing of mortar etc., complete for finished item of work.
60
362
21720
... More
Colour wash with two coats to both sides of wall, cost & conveyance of all materials such as lime, gum, conge water and labour charges etc., complete for finished item of work.
72
70
5040
... More
Fencing: Hiring an Excavator (JCB) for clearing & leveling the site, filling the existing pits with available earth/soil, shifting the unserviceable material to the nearest dumping area, etc., complete as directed by the Engineer-in-charge for finished item of work.
15
1500
22500
... More
Earthwork excavation for foundations brown sandy, clayey, silty & OG soils and except blasting and disposal of soils as directed by the officer in charge of work including all leads and lifts, shoring, strutting etc., excluding bailing out of water complete for finished item work.
7
431
3017
... More
Filling foundations with Cement Concrete (1:3:6) prop. using 40mm graded HBG metal (machine crushed) including cost & conveyance of all materials, labour charges, shoring, strutting, centering, machine mixing & laying of concrete, compacting including curing, hire & operational charges of all tools & plants required etc., complete for finished item of work. For RCC Posts.
6
4513
27078
... More
Plain Cement Concrete (1:2:4) Prop. Using 20mm size ISI gauge hard broken granite machine crushed metal including cost and conveyance of all materials to site of work and labour charges, centering, machine mixing, laying, curing and all other incidental and operational charges, water leads etc., for the following items and as directed by the Engineer-in-charge of work. For Bed Blocks
115
654
75210
... More
Supply, transportation & fixing of 2.50mm/2.00mm GI barbed wire (make: TATA WIRON) for fencing and provided with 5 horizontal lines fixed with GI staples, turn buckles etc., complete as per Clause 1705 MORD.
2300
36
82800
... More
Colour washing two coats over one coat of white wash with approved colour Including cost & conveyance of all materials to the site of work such as lime, colour (Yellow/Black oxide), gum, congee water, labour charges etc., complete for finished item of work.
80
70
5600
... More
Maintanance of OB, CR & GR: Removing White Wash or Colour wash by steel wire brushing and /or scraping ; sand papering and preparing the wall surface smooth including necessary repairs to scraches complete including all labour charges etc., Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/Litre for exterior walls including cost and conveyance of all materials to site, sales and other taxes, incidental, operational and all labour charges etc., complete for finished item of work., as directed by the Engineer incharge of work.
530
270
143100
... More
Painting one coat with synthetic enamel paint second grade of Asian / Nerolac / Berger etc., including cost & conveyance of all materials, labour charges etc., complete.as directed by the Engineer incharge of work.
25
69
1725
... More
Repair & Servicing to Rolling shutters and Collapsible gates including cost of greease, Kirosene and labour charges.. Etc., as direceted by the Engineer incharge of work
48
1000
48000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%