Sri Venkateswara University Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Sri Venkateswara University Tender

Works
Civil And Construction
Pipe Line Project
Opening Date27 Feb 2025
Closing Soon15 Mar 2025
Tender Amount₹ 6,82,842 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Brick masonry inspection chamber of size 0.76mX0.76m internal dimension using country bricks(non-modular) in CM (1:4) and plastering in CM(1:3) 20mm thick inside as well out side of the exposed portion including earth work excavation in all types of soils except rock requiring blasting and filling the vanka sand 100mm thick below the bed concrete and laying P.C.C (1:5:10) 150mm thick using 40mm HBG metal and P.C.C(1:1 1/2:3) benching and channeling with an average thickness of 100mm as per standard specification and also finally Providing pre-cast RCC(1:1 1/2:3) cover slabs with 50mm thick using 3mm to 10mm HBG chips using necessary reinforcement including 2 No’s, 8mm dia handles at the top and plastering in CM(1:3) 12mm thick on one side including cost and conveyance of all materials like cement, sand, bricks, steel and its fabrication charges, centering charges etc., complete as directed during execution.

-

-

-

... More
(A) 1.20m depth foundation finished level to top level.

15

15977

239662.5

... More
(B) 0.90 m depth foundation finished level to top level.

6

13451

80708.4

... More
110mm dia PVC/SWR pipe line (6Kgs/Sqcm)

35

353

12383

... More
75mm dia PVC/SWR pipe line(6Kgs/Sqcm)

35

232

8123.5

... More
Supply and Fixing of UPVC/SWR specials of approved quality and make including cost and conveyance of all materials etc., Complete as directed during execution.

-

-

-

... More
(I) 75mm dia UPVC/SWR Specials

-

-

-

... More
(A) 75mm Plain Bend

12

46

552

... More
(B) 75mm Door Bend

12

62

744

... More
(C) 75mm Single “T”

12

55

660

... More
(D) 75mm Single “T” with Door

6

67

402

... More
(E) 75mm Single 'Y'

6

69

414

... More
(F) 75mm Single “Y” with Door

4

87

348

... More
(G)75mm Coupler

24

33

792

... More
(H) 75mm Reducer 110mm x 75mm

4

53

212

... More
(II) 110mm dia UPVC/SWR specials Plain bend

-

-

-

... More
(A) 110mm Plain Bend

12

77

924

... More
(B) 110mm Door Bend

12

100

1200

... More
(C) 110mm Single “T”

12

100

1200

... More
(D) 110mm Single “T” with Door

6

120

720

... More
(E) 110mm Single 'Y'

6

126

756

... More
(F) 110mm Single “Y” with Door

4

159

636

... More
(G) 110mm Coupler

24

53

1272

... More
Making drainage connection in the existing inspection chamber including all repairs labour charges etc., complete as directed during execution.

20

139

2780

... More
Cutting holes in stone masonry at basement and repairs labour charges etc., complete as directed during execution.

6

101

607.8

... More
Cutting holes in CC at basement &repairs, labour charges etc., complete as directed during execution.

6

151

907.8

... More
Cutting open B T Road Surface including water bound macadam road and solling, including cost and conveyance of all materials, labour & incidental charges involved, complete for finished item of work and as directed during execution.

3

403

1211.4

... More
Filling with carted river sand(excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

1

1061

1061

... More
Plain Cement Concrete in (1:4:8) proportion nominal mix for foundations and under flooring bed using 40mm size (SS5) hard Granite or Trap metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water, etc., to site, including cost of seigniorage charges and all other taxes on all materials and including all labour charges for machine mixing, laying concrete, ramming, finishing top surface to the required level, curing , etc., complete for finished item of work as per APSS. No. 402

1

4238

4238

... More
Plain Cement Concrete in (1:2:4) proportion nominal mix for Bed Flooring using 20mm size MCG metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water, etc., to site, including cost of seigniorage charges and all other taxes on all materials and including all labour charges for machine mixing, laying concrete, ramming, finishing top surface to the required level, curing , etc., complete for finished item of work as per APSS. No. 402

1

5464

5464.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.