To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Sri Padmavati Mahila Visvavidyalayam - SPMVV Tender

Building Construction
Opening Date9 Jan 2020
Closing Date23 Jan 2020
Tender Amount₹ 7,62,617 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). for footings

4.5

-

7728

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Columns -G.F

2

-

9855.5

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). for plinth beam

1

-

7728

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). for Columns G.F for staircase

1.83

-

9855.5

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). for Columns F.F

3.5

-

10394.1

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). For Columns for second floor Stair case

1

-

10671.5

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). for Staircase beam G.F

1

-

8943.8

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). for Stair case beam First floor

1

-

9307.4

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Lintels First Floor

0.8

-

10230.2

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Roof beam First floor

5.5

-

9307.1

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Roof Slab 130mm thick for First floor

7

-

8811.8

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Stair case slab 150mm thick for Ground floor

3

-

8046.2

... More
Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC)etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department including cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Stair case slab 150mm thick for First floor

3

-

8362.1

... More
RCC M- 20 Design mix using 20mm HBG crushed metal 0.480 cu.m , 10mm HBG crushed metal 0.320 cu.m , sand 0.400 cu.m and cement 350 kgs with water cement ratio of 0.53 (185.5 Lit per cu.m of CC ) etc. horizontal plain sunshades or lofts projecting from the face of the wall 65mm average thickness,80mm thick at the face of the wall and 50mm thick at the free end and cast monolithically with the lintels or tailed to the full thickness of the wall where there are no lintels using 20mm size graded machine crushed hard granite metal (coarse aggregate) from any source conforming to the relevant ISI standards including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing , etc.,complete, including cost of centering charges and excluding cost of steel and its fabrication charges for finished item of work. for First floor

6

-

969.5

... More
Providing High Yield Strength Deformed steel bars (Fe 415grade as per IS:1786-1979) of different diameters, including labour charges for cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying firmly with MS binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of deformed steel bars, including all wastages such as overlaps, couplings, welded joints, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying , etc. including sales and other taxes on all materials etc., complete for finished item of work in all floors.(APSS No.126) (Payment will be made on the basis of weight of fabricated deformed bars only).

3

-

63752.1

... More
Construction of Brick Masonry CM(1:8) 230mm thick using well burnt Bricks 2nd class or ground moulded (Non- modular or traditional size) (230 x 110 x 70 mm)including curing, cost and conveyance of all materials as directed during execution and complying with standard specifications etc., complete. for First floor

31

-

5654.4

... More
Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows three track - two glass shutters sliding and one mesh shutter duly manufactured using UPVC reinforced profiles of 90 mm x 55 mm x 2.25 mm for outer frames, 45 mm x 45 mm x 2.25 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick glass of reputed make and mesh shutter frame shall be 25 mm x 55 mm x 2.25 mm fitted with nylon/ polymer mesh on rollers/ pulley duly fixed with TPV Gaskets/ EPDM weathering seal resistant accessories like locking system 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work.

11

-

6850

... More
Plastering in Cement mortar (1:4) 20 mm thick using best river sand from approved quarry including cost and conveyance of all materials, screening, curing, rounding of corners, incidental charges as directed during execution complying with standard specifications etc., complete for internal walls. for First floor

112

-

354.4

... More
Ornamental Plastering 12mm thick single coat in CM (1:3) finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational,incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No.901 & 904)

75

-

260.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.