Sri Padmavati Mahila Visvavidyalayam Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Sri Padmavati Mahila Visvavidyalayam - SPMVV Tender

Opening Date27 Oct 2021
Closing Date10 Nov 2021
Tender Amount₹ 5,57,216 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 6-32A SP MCB 10KA C/D Curve ISI Mark. Makes: Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens-5SX4/ Havells STADx /L&T-AU/Indo Asian-Opti pro/ HPL (Techno)

20

-

3800

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 40A FP Isolator. Makes: Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens-5SX4/ Havells STADx/L&T-AU/Indo Asian-Opti pro/HPL(Techno)

5

-

4000

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 63A FP Isolator. Makes: Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens-5SX4/ Havells STADx/L&T-AU/Indo Asian-Opti pro/HPL(Techno)

5

-

4500

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 100A FP Isolator. Makes: Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens-5SX4/ Havells STADx/L&T-AU/Indo Asian-Opti pro/HPL(Techno)

5

-

4750

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 63A TPN Switch Disconnector Fuse Unit aCubical type without fuses as per IS: 13947/IEC 60947-3Makes: L&T / Schneider / C&S / ABB / SIEMENS

2

-

4440

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 125A TPN Switch Disconnector Fuse Unit aCubical type without fuses as per IS: 13947/IEC 60947-3Makes: L&T / Schneider / C&S / ABB / SIEMENS

2

-

10600

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 250A TPN Switch Disconnector Fuse Unit aCubical type without fuses as per IS: 13947/IEC 60947-3Makes: L&T / Schneider / C&S / ABB / SIEMENS

1

-

8300

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 400A TPN Switch Disconnector Fuse Unit aCubical type without fuses as per IS: 13947/IEC 60947-3Makes: L&T / Schneider / C&S / ABB / SIEMENS

1

-

12800

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 6A to 35 A HRC Fuse Links as per IS 13703-Part 2/IEC 60269-Part 2Makes: L & T / G E / C & S / Standard / HPL / Havells / Siemens / Indo Asian

9

-

450

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 45A to 63A HRC Fuse Links as per IS 13703-Part 2/IEC 60269-Part 2Makes: L & T / G E / C & S / Standard / HPL / Havells / Siemens / Indo Asian

9

-

675

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 100 A to 160 A HRC Fuse Links as per IS 13703-Part 2/IEC 60269-Part 2Makes: L & T / G E / C & S / Standard / HPL / Havells / Siemens / Indo Asian

9

-

2115

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 250A to 350A HRC Fuse Links as per IS 13703-Part 2/IEC 60269-Part 2Makes: L & T / G E / C & S / Standard / HPL / Havells / Siemens / Indo Asian

9

-

3150

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 400A HRC Fuse Links as per IS 13703-Part 2/IEC 60269-Part 2Makes: L & T / G E / C & S / Standard / HPL / Havells / Siemens / Indo Asian

9

-

5985

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply & Making 3.5 corex 70/95/120 sq.mm heat shrinkable outdoor straight through joint for following size of PVC/ XLPE insulated aluminium conductor cable of 1.1 KV grade including cost of compound, sleeves etc. as required.Makes: Raychem /M seal/ Denson/ Multy/ Transeal-Hongshang

3

-

7560

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 1.0/1.5 TR brandnew Rotary type sealed compressor for Air conditioner Makes: DAIKIN/LG/Carrier/Kirloskar/Techam-shah

3

-

28500

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply of 2.0 TR brandnew Rotary type sealed compressor for Air conditioner Makes: DAIKIN/LG/Carrier/Kirloskar/Techam-shah

3

-

31350

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and fixing of ISI mark (IS:15683) Mono ammonium phosphate powder 90 (MAP) 2 Kg Fire extinguisher, stored pressure type, pressure gauge, gross wt. 3.6 kg, empty wt.1.6 kg, Discharge time minimum 8 sec, controllable discharge mechanism, range min. 2 mts applicable on classes A,B, C & electrically started fire, A rating -2 A, B rating -21 B, can construction: Deep drawn and Co2 mig welding, Valve construction: Forging & Machining, internal coating of can: Epoxy powder coating, External coating of Can:Epoxy polyster powder coating, sheet metal thickness:1.60mm, Helium leak detection tested with 5 years warranty Including transportation, all taxes and all labour charges etc complete. Makes : Cease Fire / Minimax

5

-

20000

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and fixing of ISI mark (IS:15683) Mono ammonium phosphate powder 90 (MAP) 4 Kg Fire extinguisher, stored pressure type, pressure gauge, gross wt. 6.9 kg, empty wt.2.9 kg, Discharge time minimum 13 sec, controllable discharge mechanism, range min. 4 mts applicable on classes A,B, C & electrically started fire, A rating -3 A, B rating -34 B, can construction: Deep drawn and Co2 mig welding, Valve construction: Forging & Machining, internal coating of can: Epoxy powder coating, External coating of Can:Epoxy polyster powder coating, sheet metal thickness:1.60mm, Helium leak detection tested with 5 years warranty Including transportation, all taxes and all labour charges etc complete. Makes : Cease Fire / Minimax

10

-

57000

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and charging of fresh refrigerant and testing of performance of air conditioner/ fridge/ water cooler of 1.5 TR Window/ Split A.C capacity including capallary and strainer/ filter

15

-

31500

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and charging of fresh refrigerant and testing ofperformance of air conditioner/ fridge/ water cooler of 2.0 TR Window/ Split A.C capacity including capallary and strainer/ filter

10

-

25000

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Carryout routine maintenance, servicing and testing of 630A to 1000A L.T.ACB by cleaning fixed contacts, moving contacts and arcchutes including servicing and putting the ACB in perfect working condition after detting all relay and ON, OFF mechanism etc done with only manufacturing companies

2

-

10000

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Carryout routine maintenance and servicing of LT.Cubical pannel board having approximately 15 to 22 Nos of switches cleaning with power blower and servicing the contacts, tightning the connection of incoming and outgoing cables, and checking the operating machanism for smooth functioning of switches and putting them in smooth working condition.

2

-

6000

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Providing independent earthling by excavating a pit to a depth of 2.25Mt in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary No.8 G.I. double earth wire and accessories with 18" dia 2" thick hume pipe ring duly providing staggered holes including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder in layers and all labour charges etc., complete.

5

-

17552

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and Run of No. 8 SWG copper wire including cost of all accessories and labour charges etc., complete. (0.1155Kgs/1Mtr)

50

-

4035

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables up to 50 sqmm covering the cable with bricks and back filling of Trench duly providing route indicator at every 8 Mtrs distance embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

200

-

42210

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and Fixing of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 3 regid PVC pipe on surface of wall with PVC / Metallic junction boxes fixing on chromium plated metallic base saddles including all required materials and labour charges etc., complete for run of mains.(Data No.20-21-2.1.2 ) PVC PIPE Makes: VIP /Bestoplast /GoldMedal / Million plast /GM / Sudhakar/ Polyline

200

-

12512

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) with Run 1 of 22/0.3mm (1.5Sqmm) FRLS PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes: Finolex / RR kabel / Havells /KEI/Polycab/Gloster

200

-

17500

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and Run of 2 of 56/0.3mm (4.00 Sq.mm) with Run Run 1 of 22/0.3mm (1.5Sqmm) FRLS PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes: Finolex / RR kabel / Havells /KEI/Polycab/Gloster

150

-

17355

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and fixing of 4 Nos 6A ISI mark Modular type switches with 6A 3/2 pin wall plug sockets on suitable cover frame to be fixed on Modular box including cost and coveyance of all material and all labour charges etc., complete for Computers in N.R.B

25

-

42862.5

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and fixing of 6A 1 Way flush type Swich Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/ Anchor/Vihan/CPL/ Havells Reo

500

-

18600

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and fixing of 6A 3/2 pin flush type Socket with shutter Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/ Anchor/Vihan/CPL/ Havells Reo

100

-

4620

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and fixing of Flush type Stepped electronic regulator for sweep AC ceiling fans of 1200mm GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/ Anchor/Vihan/CPL/ Havells Reo

250

-

60250

... More
General Maintenance of Electrical works for the year of 2021/22 Phase I in Spmvv , Tirupati;Supply and fixing of 3 Nos 300A 415V porcelain rewirable fuse units of makes Gold Medal / HPL / Sputnik / Vimal / Standard / Star on 18" x 24" peta board with 63A N Link with connections and labour charges etc complete.

3

-

12870



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.