Southern Power Distribution Company Of Andhra Pradesh Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Southern Power Distribution Company Of Andhra Pradesh Limited - APSPDCL Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Opening Date4 Sep 2024
Closing Date19 Sep 2024
Tender Amount₹ 10,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
for Partial Job: 1 limb replacement

-

-

-

... More
for Partial Job: 2 limb replacement

-

-

-

... More
Supply of all gaskets with new ones (good quality neopren rubberized gaskets of 6mm thickness for top covers and 4mm thick else where)

-

-

-

... More
Cost of Insulation material and sundries for replacing HV coils with new Aluminium winding wire for 3-ph DTRs including 2mil paper, 10mil paper, 1mm sleeves, 3mm sleeves, 6mm sleeves, webbed tape, Gum and 1mm press board supplied by the contractor (The brand names of the insulating material specification should only be used for insulatIation for the winding coil) (3.5% of total weight of finished coil will be billed)

-

-

-

... More
for Full Job

-

-

-

... More
for Partial Job: 1 limb replacement

-

-

-

... More
for Partial Job: 2 limb replacement

-

-

-

... More
Cost of Insulation material and sundries for replacing HV coils with new Copper winding wire for 3-ph DTRs including 2mil paper, 10mil paper, 1mm sleeves, 3mm sleeves, 6mm sleeves, webbed tape, Gum and imm press board supplied by the contractor Cost of Insulation material and sundries (2.5% of total weight of finished coil will be billed). (The brand names of the insulating material specification should only be used for the winding coil)

-

-

-

... More
for Full Job

-

-

-

... More
for Partial Job: 1 limb replacement

-

-

-

... More
for Partial Job: 2 limb replacement

-

-

-

... More
Cost of Insulation material and sundries for replacing LV coils with new Aluminium winding wire for 3-ph DTRs including2mil paper, 10mil paper, 1mm sleeves, 3mm sleeves, 6mm sleeves, webbed tape, Gum and imm press board supplied by the contractor (5% of the total weight of the total weight finished coil will be billed) (The brand names of the insulating material specification should only be used for the winding coil)

-

-

-

... More
for Full Job

-

-

-

... More
for Partial Job: 1 limb replacement

-

-

-

... More
for Partial Job: 2 limb replacement

-

-

-

... More
Cost of Insulation material and sundries for replacing LV coils with new Copper winding wire for 3-ph DTRs including2mil paper, 10mil paper, 1mm sleeves, 3mm sleeves, 6mm sleeves, webbed tape, Gum and imm press board supplied by the contractor Cost of Insulation material and sundries (4% of the total weight of finished coil will be billed) The brand names of the insulating material specified in the specification should only be used for winding.

-

-

-

... More
for Full Job

-

-

-

... More
for Partial Job: 1 limb replacement

-

-

-

... More
for Partial Job: 2 limb replacement

-

-

-

... More
Cost of Insulation material and sundries for assembling of HV.&L.V winding for 3-ph DTRs including2mil paper, 10mil paper, 1mm sleeves, 3mm sleeves, 6mm sleeves, webbed tape, Gum and 1mm press board ,3mm press board,wooden pieces,packing pieces etc.,complete supplied by the contractor

-

-

-

... More
for Full Job

-

-

-

... More
for Partial Job: 1 limb replacement

-

-

-

... More
for Partial Job: 2 limb replacement

-

-

-

... More
Cost of DPC Aluminium winding wire for replacing HV coils with new DPC Aluminium winding wire for 3-ph DTRs of all capacities

-

-

-

... More
Cost of DPC Aluminium winding strip for replacing LV strip with new Aluminium strip wire for 3-ph DTRs of all capacities

-

-

-

... More
Cost of SEC Aluminium winding wire for replacing HV coils with new Aluminium winding wire of SEC for 3-ph DTRs of all capacities

-

-

-

... More
Cost of SEC copper winding wire for replacing HV coils with new copper winding wire of SEC for 3-ph DTRs of all capacities

-

-

-

... More
Cost of SEC copper winding strip for replacing LV strip with new copper winding strip of SEC for 3-ph DTRs of all capacities

-

-

-

... More
Labour charges for Cleaning and Painting the tank out side with one primary coat and 2 coats of enamel gray paint including cost of paint as per specification if required.

-

-

-

... More
Total Labour charges for replacing damaged HV coils with new one. ( Al. & Copper)

-

-

-

... More
Labour charges for re - insulation and rewinding of LV coils

-

-

-

... More
Alluminium

-

-

-

... More
Copper

-

-

-

... More
Labour charges for replacing damaged LV coils with new one. ( LV Strip adding ) ( Al. & Copper)

-

-

-

... More
Cutting of tank burst tank 4 sides and 2 sides (comer side and top side) of distribution transformer for welding cooling pipes and bushings pockets and normal of bulges or the tank sides in the hydraulic press welding minor repaires to cooling pipes and bushing pockets and rewelding of the side of the tank both 4 sides and side cooling pipes and bushing pockets

-

-

-

... More
Conversion of sealed CSP transformer into CONENTONAL type transformer duly drilling the required size of holes to the flange and top cover for providing 1/2" bolts and 3" nots at an interval of center to center gas cutting, drilling of holes and grinding

-

-

-

... More
Labour charges for cutting of 'U' clamps/anti theft bolts for top cover on four corners of sick DTR and top cover welding with 'U' clamps /ani theft bolts after completing the repairs

-

-

-

... More
Replacement of miscellaneous items with new ones.

-

-

-

... More
H.V. Bushing

-

-

-

... More
L.V. Bushing

-

-

-

... More
Bushing Rod (H.V. Brass only)

-

-

-

... More
Bushing Rod (L.V. Brass only)

-

-

-

... More
H.V.Epoxy Bushing

-

-

-

... More
L.V. Epoxy Bushing

-

-

-

... More
H.V.Protection link

-

-

-

... More
Oil level guage glass

-

-

-

... More
Overhauling/minor repairs to 3-ph DTRs both conventional & CSP( Alluminium & Copper winding) of various capacities and makes.

-

-

-

... More
Labour charges for dragging of sick distribution transformers from out side the dumping yard to inside the SPM and from inside the SPM to outside the dumping yard to the purpose of1st inspection, opening of top cover, minor rectifications, drying, tanking and replacement of all gaskets with new ones which will be supplied by SPDCL and press boards etc., with new one fixing HV & LV bushings with metal parts, HV protection link, reconditioning including filtering of oil and conducting of all tests as per ISS and as notified in terms and conditions including load test and idle charging for 6 Hrs. and handed over of unserviceable materials to AE/SPM and complete.

-

-

-

... More
Schedule of labour rates for rectification of minor defects in Distribution Transformers at field in APSPDCL w.e.f. ………………..

-

-

-

... More
Description of Work

-

-

-

... More
Labour charges for attending the minor repairs of Distribution Transformers such as arresting oil leakage replacement of damaged bushing rods etc. at site ( In field ) covered under all operation sections in operation circle.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.