South Central Railway Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

South Central Railway - SCR Tender

Works
Civil And Construction
Ireps
+1Kurnool, Andhra Pradesh
Opening Date6 May 2024
Closing Date29 May 2024
Tender Amount₹ 6,55,11,427.27 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2(a)(i)-Concrete for foundations and plinth in hard soil.

-

-

476166.6

... More
2(a)(ii)-Concrete for foundations and plinth in rocky soil.

-

-

517446

... More
2(b)(i)-Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)

-

-

10907322.4

... More
2(c)(i)-Reinforced Concrete for foundation, plinth and cable trenches

-

-

31072.6

... More
2(c)(ii)-Cable trench covers

-

-

17829.6

... More
3(a)-Erection of Traction masts and main masts of Switching station and LT supply Transformer station.

-

-

50187.74

... More
3(b)-Erection of fabrication steel work such as TTC, portals, sps etc.

-

-

2316006.9

... More
3(e)-Supply and Erection of Guy rod assembly.

-

-

478156.28

... More
4(a)(ii)-Extra on 4(a)(i) for supporting two OHEs.

-

-

258060.85

... More
4(b)(i)-Supply without Insulator and erection of a pull off arrangement for OHE.

-

-

76809.4

... More
6(a)-Supply and Erection of regulated conventional OHE.

-

-

410771.37

... More
7(d)-Manual erection of all Aluminum 25 kV Feeder / Return conductor (spider)

-

-

8372.16

... More
7(e)-Erection of copper cross feeder wires (37/2.25 mm HDBC)

-

-

534.89

... More
8(a)(v)-Supply and erection of regulating equipment (3-pulley type) with counter weight assembly for conventional OHE.

-

-

1439623.92

... More
8(a)(xii)-Marking of "Y"- Measurement at BWA locations.

-

-

5975.5

... More
8(b)(i)-Supply without Insulator and erection of material for termination of Single conductor of Overhead equipment or terminating wire.

-

-

57209.76

... More
8(b)(ii)-Supply without Insulator and erection of material for termination of Double Overhead equipment conductor.

-

-

356882.7

... More
8(b)(iii)-Supply without Insulator and erection of material for termination of all aluminum 25 kV Feeder/ Return conductor (single SPIDER)

-

-

14522.08

... More
8(b)(ix)-Supply (other than Insulators) and erection of materials for terminaton of copper cross feeder with gantries.

-

-

6117.62

... More
9(a)-Supply without Insulators and erection of anti creep with galvanised steel wire for conventional OHE.

-

-

171919.98

... More
10(a)-Extra on Item 6(a) for supply and erection of additional fittings at a turnout diamond crossing or overlap.

-

-

31111.36

... More
11(a)(i)-Supply without Insulator and erection of 25 kV solid core cut-in insulator.

-

-

26253.44

... More
11(a)(ii)-Supply without Insulator and erection of 25 kV solid core suspension insulator.

-

-

78773.24

... More
11(b)-Supply without Insulator and erection of 25 kV post Insulators.

-

-

64283.46

... More
12(a)-Supply without insulator and erection of 25 kV section Insulator assembly.

-

-

690638.6

... More
13(a)-Supply without insulator and erection of 25 kV Single Pole Isolator with-out earth contact assembly.

-

-

720464.42

... More
13(c)-Supply without insulator and erection of 25 kV Double Pole Isolator

-

-

129962.28

... More
13(d)-Extra for supply and erection of an earth contact assembly in an Insulator.

-

-

7764.92

... More
13(e)-Extra on item 13(a), (b) or (c) for an inter-locking device.

-

-

53146.42

... More
15(a)-Supply of material excluding copper wire and erection of all types of copper jumpers

-

-

310751.84

... More
15(d)-Supply of materials and erection of Large copper jumper wire 160 Sq.mm between Aluminium bus and cross feeders

-

-

6111.16

... More
15(e)-Supply of materials and erection of Large copper jumper wire 160 Sq.mm between cross feeders and OHE

-

-

10077.6

... More
16(a)-Supply and Erection of structure bonds

-

-

187340

... More
16(aa)-Drilling of Holes on Rails

-

-

44574

... More
16(b)-Supply and erection of longitudinal bond

-

-

45866

... More
16(c)-Supply and erection of transverse and special bonds

-

-

75582

... More
17(a)-Supply and erection of earth electrode

-

-

13388.35

... More
17(b)-Extra for special embedment of earth electrode

-

-

4182.85

... More
17(c)-Supply and erection of earth bus

-

-

11628

... More
17(d)-Supply and erection of Copper strips for equipment earthing

-

-

15584.75

... More
17(e)-Supply and erection of 8 SWG G.I wire for earthing

-

-

888.25

... More
17(f)-Supply and erection of earth electrode at TSS/SP/SSP

-

-

41925.4

... More
17(g)-Supply and erection of Earth leads 75mmx8mm in the ground at TSS

-

-

28747

... More
17(h)-Supply and erection of Earth leads 50mmx6mm mild steel in ground at TSS

-

-

27132

... More
17(i)-Supply and erection of Earth leads 75mmx8mm mild steel exposed at TSS

-

-

13566

... More
17(j)-Supply and erection of Earth leads 50mmx6mm mild steel exposed at TSS

-

-

7429

... More
17(m)-Supply and erection of earth screen wire of size 7/9 SWG

-

-

30685

... More
17(n)-Erection of maintenance free earth kit

-

-

8398

... More
18 (b)-Erection of 25 KV Interrupters (Vaccum)

-

-

9079.53

... More
19(a)(i) -Erection of 25 KV PT (Type-I)

-

-

1996.14

... More
19(a)(ii)-Erection of 25 KV PT (Type - II)

-

-

665.38

... More
20(a)-Erection of 42 KV lighting Arrestors

-

-

1731.28

... More
21-Erection of Terminal boards in control cubicle

-

-

316.54

... More
22(a)-Supply and erection of an Iron clad 110V DC Fuse box

-

-

474.81

... More
22(b) -Supply and erection of 220 V AC Fuse box

-

-

675.07

... More
22(c)-Erection of 240 V L.T Distribution board in the control room for 10 KVA L.T. Supply transformer.

-

-

1883.09

... More
22(d) -Supply and erection of 110 V DC Distribution board.

-

-

1372.75

... More
23(a)-Erection of lead acid battery (110V, 40-Ah)

-

-

4773.94

... More
24(a)-Erection of battery charger for 110 V, 40 Ah battery

-

-

655.69

... More
25(a)-Supply and installation of cable for control and indication

-

-

40698

... More
25(b)-Supply and installation of cable for heater supply

-

-

14212

... More
25(c)-Supply and installation of cable for catenary indication

-

-

17442

... More
25(d)-Supply and installation of cable for LT power supply

-

-

9851.5

... More
25(e)-Supply and installation of cable for 110V DC power supply

-

-

9044

... More
25(f)(i)(ii)-Laying of 70/25 sq.mm cable

-

-

11284.01

... More
26(a)(i)-Supply and erection of Aluminum bus bar 36mm x 28mm

-

-

116909.85

... More
26(b)(i)-Supply and erction of aluminum bus terminal (6480)

-

-

43152.8

... More
26(b)(ii)-Supply and erection of aluminum bus splice (6490)

-

-

21996.3

... More
26(b)(iii)-Supply and erection of aluminum bus tee connector (6500)

-

-

17907.12

... More
26(b)(iv)-Supply and erection of aluminum bus bar terminal connector 36/20 mm(6530)

-

-

16537.6

... More
26(b)(v)-Supply and erection of aluminum bus bar tap connector (6520)

-

-

4140.86

... More
26(b)(vi)-Supply and erection of flexiable bus splice (6550)

-

-

20090.6

... More
26(b)(vii)-Supply and erection of Aluminum bus terminal connector bolted type (6830-1)

-

-

6783

... More
26(c)(vii)-Supply and erection of expansion type bimetallic terminal connector (ID no 11090)

-

-

12532.4

... More
26(c)(viii)-Supply and erection of expansion type bimetallic terminal connector (ID no 11060)

-

-

9683.54

... More
26(c)(ix)-Supply and erection of 25 kV system rigid bus splice connector (ID no 11180)

-

-

5814

... More
27(a)-Oil filtration, erection, testing and commissioning of 25 KV/240 volts, 5/10/25/50 kVA LT supply transformer

-

-

3917.99

... More
28-Supply and erection of 25 KV Drop out fuse switch for all oil/dry type AT's of all capacities

-

-

7852.13

... More
30(a)(i)-Supply and erection of fencing panel at switching stations

-

-

93928.4

... More
30(a)(ii)-Supply and erection of fencing upright

-

-

29084.21

... More
30(b)(i)-Supply and erection of anti climbing device at switching stations

-

-

31783.2

... More
31(a)-Transfer of equipment from one mast or support to other

-

-

214962.96

... More
31(b)-Provision of an additional bracket assembly/assemblies on a mast or support

-

-

25840

... More
31(d)-Dismantling of Over Head Equipment

-

-

3892.8

... More
31(e) -Dismantling of feeder wire/Return conductor

-

-

2099.5

... More
31(g)(vi)-Dismantling of control room equipment

-

-

8075

... More
31(g)(vii)-Dismantling of fencing panel with retrieval of fencing upright.

-

-

7267.5

... More
31(h)-Slewing of equipment

-

-

171131.86

... More
31(i)-Dismantling of an Isolator

-

-

4828.85

... More
31(k)(i)-Dismantlement of OHE mast/structure by cutting

-

-

237405

... More
31(k)(ii)-Dismantlement of upright of TTCs/portals by cutting

-

-

32300

... More
31(l)(i)-Retrieval of traction masts, main masts, TTC uprights etc

-

-

169575

... More
31(n)-Dismantlement of Guy rod

-

-

12409.66

... More
31(s)-Dismantling of fabricated steel & SPS

-

-

2554.93

... More
31(t)(i)-Dismantling of a regulating equipment (Three pulley type) with counter weight assembly for conventional/composite OHE

-

-

34318.75

... More
31(t)(iii)-Dismantling of anti creep with galv. Steel wire

-

-

5087.25

... More
31(t)(iv)-Dismantling of copper jumper

-

-

3746.8

... More
31(t)(v)-Dismantling of material of termination of double over head equipment conductor

-

-

9405.76

... More
31(t)(vii)-Dismantlement of material of termination of all aluminum 25 KV feeder/return conductor (single spider)

-

-

633.08

... More
31(t)(viii)-Releasing of plinth/pole mounted LT supply transformer

-

-

1905.7

... More
31(t)(x)-Dismantlement of 25 KV BM (Oil/Vac/SF6)

-

-

4379.88

... More
31(u)(i)-Dismantling of 25 KV potential Transformer (Type I, III)

-

-

998.07

... More
31(u)(iv)-Dismantling of 42 KV LA

-

-

865.64

... More
31(u)(xi)-Dismantling of 25 KV double pole isolator

-

-

10252.02

... More
31(u)(xvi)-(a)-Dismantling of Circuit breakers and interuptors.

-

-

3230

... More
31 (u)(xvi) -(e)-Dismantling of PT and 250 V AC supply Circuit.

-

-

3230

... More
31 (u)(xvi) - (f)-Dismantling of 240 V Heater Circuits.

-

-

2584

... More
31 (u)(xvi) - (g)-Dismantling of LT Power supply to Control Room

-

-

4199

... More
39(b)-Erection of released bracket assembly

-

-

621775

... More
39(c)-Erection of released regulating equipment

-

-

66441.1

... More
32/3(a)-Erection of Traction masts and main masts of Switching station and LT supply Transformer station.

-

-

50187.74

... More
32/3(b)-Erection of fabrication steel work such as TTC, portals, sps etc.

-

-

2316006.9

... More
32/3(e)-Erection of Guy rod assembly.

-

-

21169.42

... More
32/4(a)(i)-Supply without Insulator and Erection of Single bracket assembly for conventional OHE.

-

-

83140.2

... More
32/4(a)(ii)-Extra on 4(a)(i) for supporting two OHEs.

-

-

12387.05

... More
32/6(a)-Supply and Erection of regulated conventional OHE.

-

-

60932.34

... More
32/7(d)-Manual erection of all Aluminum 25 kV Feeder / Return conductor (spider)

-

-

5770.4

... More
32/7(e)-Erection of copper cross feeder wires (37/2.25 mm HDBC)

-

-

534.89

... More
32/8(a)(v)-Supply and erection of regulating equipment (3-pulley type) with counter weight assembly for conventional OHE.

-

-

76874

... More
32/8(a)(xii)-Marking of "Y"- Measurement at BWA locations.

-

-

4899.91

... More
32/8(b)(i)-Supply without Insulator and erection of material for termination of Single conductor of Overhead equipment or terminating wire.

-

-

10129.28

... More
32/8(b)(ii)-Supply without Insulator and erection of material for termination of Double Overhead equipment conductor.

-

-

36176

... More
32/8(b)(iii)-Supply without Insulator and erection of material for termination of all aluminum 25 kV Feeder/ Return conductor (single SPIDER)

-

-

2532.32

... More
32/8(b)(ix)-Supply (other than Insulators) and erection of materials for terminaton of copper cross feeder with gantries.

-

-

633.08

... More
32/9(a)-Supply without Insulators and erection of anti creep with galvanized steel wire for conventional OHE.

-

-

10174.5

... More
32/11(a)(i)-Supply without Insulator and erection of 25 kV solid core cut-in insulator.

-

-

5232.6

... More
32/11(a)(ii)-Supply without Insulator and erection of 25 kV solid core suspension insulator.

-

-

11511.72

... More
32/11(b)-Supply without Insulator and erection of 25 kV post Insulators.

-

-

10465.2

... More
32/12(a)-Supply without insulator and erection of 25 kV section Insulator assembly.

-

-

43475.8

... More
32/13(a)-Supply without insulator and erection of 25 kV Single Pole Isolator with-out earth contact assembly.

-

-

46356.96

... More
32/13(c)-Supply without insulator and erection of 25 kV Double Pole Isolator

-

-

2228.7

... More
32/15(a)-Supply of material excluding copper wire and erection of all types of copper jumpers

-

-

16860.6

... More
32/15(b)-Supply and erection of Aluminium jumper

-

-

171.19

... More
32/15(d)-Supply of materials and erection of Large copper jumper wire 160 Sq.mm between Aluminium bus and cross feeders

-

-

187.34

... More
32/15(e)-Supply of materials and erection of Large copper jumper wire 160 Sq.mm between cross feeders and OHE

-

-

187.34

... More
32/26(a)(i)-Supply and erection of Aluminum bus bar 36mm x 28mm

-

-

5652.5

... More
32/31(a)-Transfer of equipment from one mast or support to other

-

-

214962.96

... More
32/31(b)-Provision of an additional bracket assembly/assemblies on a mast or support

-

-

25840

... More
32/31(d)-Dismantling of Over Head Equipment

-

-

3892.8

... More
32/31(h)-Slewing of equipment

-

-

171131.86

... More
32/31(i)-Dismantling of an Isolator

-

-

3863.08

... More
32/31(k)(i)-Dismantlement of OHE mast/structure by cutting

-

-

237405

... More
32/31(k)(ii)-Dismantlement of upright of TTCs/portals by cutting

-

-

32300

... More
32/31(l)(i)-Retrieval of traction masts, main masts, TTC uprights etc

-

-

145350

... More
32/31(n)-Dismantlement of Guy rod

-

-

12774.65

... More
32/31(s)-Dismantling of fabricated steel & SPS

-

-

2554.93

... More
32/31(t)(i)-Dismantling of a regulating equipment (Three pulley type) with counter weight assembly for conventional/composite OHE

-

-

34318.75

... More
32/31(t)(iii)-Dismantling of anti creep with galv. Steel wire

-

-

5087.25

... More
32/31(t)(iv)-Dismantling of copper jumper

-

-

3372.12

... More
32/31(t)(v)-Dismantling of material of termination of double over head equipment conductor

-

-

9405.76

... More
32 / 39(b)-Erection of released bracket assembly

-

-

23579

... More
32 / 39(c)-Erection of released regulating equipment

-

-

66441.1

... More
33/6(a)-Extra on erection rate for stringing work done manually under item 6(a), 6(d)

-

-

69347.45

... More
34(a)-Construction of switching station building (super structure portion including plinth beam)

-

-

182081.56

... More
34(b)-Cement concrete for foundation with stone ballast 40 mm size.

-

-

46059.8

... More
34(c)-RCC work for foundation and plinth in ration 1:2:4 (including steel)

-

-

71383

... More
34(d)-Brick work for foundation plinth

-

-

54522.4

... More
34(e)-Construction of retaining wall with stone masonry

-

-

39535.2

... More
34(l)-Pitching and grouting on side slopes with contractors stone including palstering of 20 mm thick over stone masonry

-

-

34076.5

... More
35-Internal and External Lighting of Switching (SP/SSP) station building

-

-

19786.98

... More
36(a)-Unloading of all types of steel structures

-

-

25781.47

... More
36(b)-Loading of all types of Steel structures

-

-

41583.02

... More
37(a)-Unloading of all types of Copper & Aluminum conductors

-

-

965.77

... More
37(b)-Loading of all types of Copper & Aluminum conductors

-

-

965.77

... More
40-Supply and Erection of Number plates on existing masts

-

-

104006

... More
41-Supply and Erection of various type of caution boards for 25 kV AC traction

-

-

29070

... More
42-Supply and Erection of shock treatment charts Trilingual English, Hindi and Telugu (laminated)

-

-

2261

... More
44(a)-Supply and erection of name plate for switching stations

-

-

11628

... More
44(b)-Supply and erection of schematic diagram board and shock treatment charts I switching/ traction sub stations

-

-

29070

... More
44(c)-Supply and erection of standard first aid box

-

-

1615

... More
44(d)-Supply and erection of fire extinguishers

-

-

69768

... More
44(e)-Supply and erection of fire buckets with stand

-

-

52326

... More
44(f)-Supply and spreading of 20 mm ballast at TSS/SSP/SP yards

-

-

22416.2

... More
3(a)-Supply of traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS Specifications.

-

-

2912291.42

... More
3(c)-Supply of Fabricated steel work other than mast, TTC's, portals, such as SPS, special fabricated steel etc

-

-

4539414.63

... More
6(a)(iii)-Supply of 7 mm dia solid round hard drawn copper wire as per latest RDSO specification

-

-

16722.6

... More
6(a)(iv)-Supply of 5 mm dia solid round hard drawn copper wire as per latest RDSO specification

-

-

217393.8

... More
7(c)-Supply of 37/2.25 mm hard drawn bare copper cross feeder wire (150 sq.mm) as per latest RDSO specification

-

-

87561

... More
15(a)(i)-Supply of 160 sq.mm Annealed Stranded copper jumper as per latest RDSO specification

-

-

359423.1

... More
15(a)(ii)-Supply of 130 sq.mm Annealed Stranded copper jumper as per latest RDSO specification

-

-

941936.4

... More
15(a)(iii)-Supply of 105 sq.mm Annealed Stranded copper jumper as per latest RDSO specification

-

-

74363.4

... More
15(a)(iv)-Supply of 50 sq.mm Annealed Stranded copper jumper as per latest RDSO specification

-

-

242477.7

... More
4(ax)(i)-Supply of insulators for item 4(a)(i)(iii)(v)

-

-

959834.4

... More
4(bx)(i)-Supply of 9 ton insulator for item 4(b)(i)(iii)

-

-

33462.8

... More
8(bx)(i)-Supply of insulators for item no 8(b)(i)(ii)(iii)(v)(vi)(vii)(viii)(ix)

-

-

267702.4

... More
9(ax)(i)-Supply of insulators for item no 9(a)(b)(c)

-

-

60233.04

... More
11(ax)(i)-Supply of insulators for item no 11(a)(i)(ii)

-

-

227547.04

... More
11(bx)-Supply of 25 kV post insulator for item 11(b)

-

-

404589.99

... More
12(ax)-Supply of section and 9 ton insulator for item No.12 (a)

-

-

167314

... More
13(ax)-Supply of 25 kV post & operating rod insulators for item 13 (a)

-

-

287152.32

... More
13(cx)-Supply of 25 kV post & operating rod insulators for item 13(c)

-

-

66265.92

... More
28(x)-Supply of 25 KV post insulators for item 28

-

-

8700.86

... More
17(n)(i)-Supply of maintenance free earth kit

-

-

9265

... More
19(a)(i)-Supply of 25 KV PT type I with connectors

-

-

90786.1

... More
20(a)-Supply of 42 kV LA gapless 10 KA rating

-

-

167995.16

... More
23(a)-Supply of Lead Acid Battery 110 V, 40 AH capacity

-

-

79788

... More
24(a)-Supply of battery charger for 40 AH, 110V lead acid battery

-

-

64218.44

... More
28-Supply of link pull rod for 25 KV d.o.fuse switch as per latest RDSO specification

-

-

3910.92

... More
31(f)(i)-Supply of contact wire splice

-

-

5362.8

... More
31(f)(ii)-Supply of catenary wire splice

-

-

2110.24

... More
31(f)(iii)-Supply of large span wire ending clamp

-

-

4905

... More
51(a)-Supply and Erection of TEAM CRIB [ACID RESISTANCE] sheets of 30 mm thickness for battery room flooring

-

-

62675

... More
51(b)-Supply and Erection of TEAM CRIB [ACID RESISTANCE] sheets of 20 mm thickness for battery room flooring

-

-

59950

... More
51(c)-Supply and Erection of TEAM CRIB [ACID RESISTANCE] sheets of 11 mm thickness for battery room flooring

-

-

35425

... More
Excavation of Earth in all kinds of Soil

-

-

24945

... More
Supply and Erection of Galvanized iron flat 75*8 mm

-

-

15390

... More
Transportation and erection of 13 m long buried rail

-

-

6000

... More
Designing, UV printing, supply and installation of traction 25 KV SWR schematic diagrams in 215 molded aluminum channel with elegant and stainless steel star bracket for hanging arrangement. Printing in UV print and designing in corel draw package with different colours codes included isolator, BM, AT numbers, Signal Numbers and UP & DN direction etc., of main station and towards either end station.

-

-

604200

... More
Dismatling of RTU at Existing SSP and , Erection,Testing & commissioning of same RTU at New SSPas per RDSO spec No.TI/SPC/RCC/SCADA/0130(Rev-2) with amendemts for SSP

-

-

132000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.