South Central Railway Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

South Central Railway - SCR Tender

Works
Civil And Construction
Road Construction
Ireps
+1Nellore, Andhra Pradesh
Opening Date22 May 2024
Closing Date14 Jun 2024
Tender Amount₹ 42,36,670.53 
Notes
Download

Costs

Summary

Guntakal Division - (i) Modification Works To Ohe In Connection With Proposed Construction of New Four Lane Rob

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3(a)-Erection of traction masts and main masts of Switching stations and LT supply transformer station.

-

-

11808.88

... More
3(b)-Erection of fabricated steel work Such as TTC,Portals and SPs etc.

-

-

11206.49

... More
3(e)-Supply and erection of Guy rod assembly.

-

-

35158.55

... More
4(a)(i)-Supply without Insulator and erection of Single bracket assembly for Conventional OHE (Regulated)

-

-

181900.68

... More
4(a)(ii)-Extra on 4(a)(i) for supporting two OHEs.

-

-

19015.01

... More
8(a)(v)-Supply and erection of regulating equipment (3-pulley type) with counter weight assembly for convention OHE.

-

-

102830.28

... More
8(a)(xii)-Marking of "Y"- Measurement at BWA locations.

-

-

239.02

... More
8(b)(ii)-Supply without Insulator and erection of material for termination of Double Overhead equipment conductor.

-

-

18459.45

... More
9(a)-Supply without Insulators and erection of anti creep with galvanised steel wire for conventional OHE.

-

-

19102.22

... More
11(a)(i)-Supply without Insulator and erection of 25 kV solid core cut-in insulator.

-

-

4922.52

... More
11(a)(ii)-Supply without Insulator and erection of 25 kV solid core suspension insulator.

-

-

1514.87

... More
15(a)-supply and erection of all types of copper jumpers

-

-

33294.84

... More
16(a)-Supply and erection of structure bonds

-

-

23256

... More
16(aa)-Drilling of holes on rails

-

-

14858

... More
17 (a)-Supply and erection of earth electrode

-

-

133883.5

... More
17(b)-Extra for special embedment of earth electrode

-

-

26770.24

... More
17(c )-Supply and erection of earth bus

-

-

93024

... More
31(a) -Transfer of equipment from one mast or support to other

-

-

29147.52

... More
31(h)-Slewing of OHE equipment

-

-

52209.72

... More
31(k)(i)-Dismantlement of OHE mast/structure by cutting

-

-

22610

... More
31(k)(ii)-Dismantlement of upright of TTC's/portals by cutting

-

-

3230

... More
31(l)(i)-Retrieval of traction masts, main masts, TTC uprights etc

-

-

56525

... More
31(n)-Dismantling of Guy Rod

-

-

1824.95

... More
31(p)-Dismantling of droparms/Booms /Temporary masts

-

-

1868.56

... More
31(s)-Dismantling of fabricated steel & SPS

-

-

364.99

... More
31(t)(i)-Dismantling of a regulating equipment (Three pulley type) with counter weight assenbly for conventional/composite OHE

-

-

2745.5

... More
31(t)(iii)-Dismantling of anti creep with galv. Steel wire

-

-

1017.45

... More
31(t)(iv)-Dismantling of copper jumper

-

-

1124.04

... More
31(t)(v)-Dismantling of material of termination of double over head equipment conductor

-

-

1085.28

... More
31(t)(xii)-Readjustment of OHE spans including erection of droppers

-

-

80750

... More
32/3(b)-Erection of fabricated steel work Such as TTC,Portals and SPs etc.

-

-

11206.49

... More
32/3(e)-Supply and erection of Guy rod assembly.

-

-

3649.9

... More
32/4(a) (i)-Erection of Single bracket assembly for Conventional OHE (Regulated) under power block

-

-

12151.26

... More
32/4(a)(ii)-Extra on 4 (a) (i) for supporting two OHEs.

-

-

1333.99

... More
32/8(a)(v)-Erection of regulating equipment (3pulley type) with counter weight assembly for convention OHE.

-

-

5491

... More
32/8(a)(xii)-Marking of "Y"- Measurement at BWA locations.

-

-

239.02

... More
32/8(b)(ii)-Erection of material for termination of Double Overhead equipment conductor.

-

-

2170.56

... More
32/9(a)-Erection of anti creep with galvanised steel wire for conventional OHE.

-

-

2034.9

... More
32/11(a)(i)-Supply without Insulator and erection of 25kv solid core cut-in insulator.

-

-

1308.15

... More
32/11(a)(ii)-Supply without Insulator and erection of 25kv solid core suspension insulator.

-

-

261.63

... More
32/15(a)-supply and erection of all types of copper jumpers

-

-

2248.08

... More
32/31(a) -Transfer of equipment from one mast or support to other

-

-

29147.52

... More
32/31(h)-Slewing of OHE equipment

-

-

52209.72

... More
32/31(k)(i)-Dismantlement of OHE mast/structure by cutting

-

-

22610

... More
32/31(k)(ii)-Dismantlement of upright of TTC's/portals by cutting

-

-

3230

... More
32/31(l)(i)-Retrieval of traction masts, main masts, TTC uprights etc

-

-

56525

... More
32/31(n)-Dismantling of Guy Rod

-

-

1824.95

... More
32/31(p)-Dismantling of droparms/Booms /Temporary masts

-

-

1868.56

... More
32/31(s)-Dismantling of fabricated steel & SPS

-

-

364.99

... More
32/31(t)(i)-Dismantling of a regulating equipment (Three pulley type) with counter weight assenbly for conventional/composite OHE

-

-

2745.5

... More
32/31(t)(iii)-Dismantling of anti creep with galv. Steel wire

-

-

1017.45

... More
32/31(t)(iv)-Dismantling of copper jumper

-

-

1124.04

... More
32/31(t)(v)-Dismantling of material of termination of double over head equipment conductor

-

-

1085.28

... More
32/31(t) (xii)-Readjustment of OHE spans including erection of droppers under power block

-

-

80750

... More
34(f)(i)-Earth work in excavation and filling including compaction in Normal soil

-

-

9205.5

... More
34(f)(ii)-Earth work in excavation and filling including compaction in Hard soil

-

-

8075

... More
34(l)-Pitching and grouting on side slopes with contractors stone including plastering of 20 mm thick over stone masonry

-

-

61693

... More
40-Supply and erection of no. plates on existing masts

-

-

33801.95

... More
41-Supply and erection of various types Caution boards for 25 KV AC Traction

-

-

10465.2

... More
3 (a)-Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS Specifications.

-

-

685245.04

... More
3(c) -Supply of Fabricated steel work other than mast, TTC's, portals, such as SPS, special fabricated steel etc

-

-

178016.26

... More
6(a)(iv)-Supply of 5mm dia solid round hard drawn copper wire as per latest RDSO specification

-

-

54348.45

... More
15(a)(i)-Supply of 160 sq.mm Annealed Stranded copper jumper as per latest RDSO specification

-

-

214827.6

... More
15(a)(iv)-Supply of 50 sq.mm Annealed Stranded copper jumper as per latest RDSO specification

-

-

66890.4

... More
4(ax)(i)-Supply of insulators for item 4(a) (i)/ (iii)

-

-

111464.64

... More
8(bx)(i)-Supply of insulators for item no 8(b)(i)(ii)(iii)(v)(vi)(vii)(viii)(ix)

-

-

10038.84

... More
9(ax)(i)-Supply of insulators for item no 9(a)(b)(c )

-

-

6692.56

... More
11(ax)(i)-Supply of insulators for item no 11(a)(i)(ii)

-

-

13385.12

... More
Supply of 1041-2 PG clamps (107 sq.mm to 65/50 sq.mm)

-

-

61360

... More
Supply of Contact wire parallel clamp groove (PG 1030-3) with GI bolt 16x50x38mm with nut spring washer complete set

-

-

42008

... More
Supply of Digital Hygrometer

-

-

18735

... More
Supply of Load cell tester suitable for 40 AH and 200 AH battery

-

-

28272.8

... More
Supply of TRI Color LED 3-cell torch/rechargeable torch

-

-

16590.8

... More
"Supply of Discharge rod / Earthing rod assembly complete fully made of fibre glass light weight for 25 KV AC Traction"

-

-

140467.2

... More
Supply of Gearless hand operated pulling and lifting machine (TIRFOR), Lifting capacity-1.6Ton, Pulling capacity- 2.6 Ton with standard fitting

-

-

221250

... More
Breaking of mass concrete by using pnematic breaker (tractor mounted) including disposal of debris out of the yard limits including crossing of tracks, rehandling etc.,

-

-

197560



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.