To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
South Central Railway - SCR Tender
Electrical and Electronics
Electrical Works
Ireps
Opening Date9 Dec 2024
Closing Date31 Dec 2024
Tender Amount₹ 32,82,681.4
Costs
EMD
₹ 65,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Sw-i:guduru - Vijayawada Section: Additions And Alterations To Ohe In Connection with "proposed Construction Of Road Over Bridge Of Span 1 X 54.00 M Bow
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
B-E29-TRD-TNDR-16-24-25-VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLYTender No
B-E29-TRD-TNDR-16-24-25Tender Authority
South Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
2(b)Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)
-
-
705936
... More
3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station. 6
-
-
13595.75
... More
3(b)Erection of fabricated steel work such as TTC, Portals, SPS etc. 7
-
-
36429.75
... More
3(e)Supply and erection of Guy rod assembly.
-
-
38097.5
... More
4(a)(i)Supply without insulator and Erection of Single bracket assembly for conventional OHE. 9
-
-
248976
... More
6 (b)Erection of Contact wire only.
-
-
2151.35
... More
8(a) (v)Supply and erection of regulating equipment (3-pulley type) with counter weight assembly for conventional OHE. 11
-
-
10
... More
8(a) (xii)Marking of "Y" - Measurement at BWA locations.
-
-
129.5
... More
8(b)(ii) Supply without Insulator & erection of materials for termination of Double Overhead equipment conductor. 13
-
-
26670
... More
11(a) (i)Supply without insulator and erection of 25 kV solid core cut-in insulator. 14
-
-
10668
... More
15(a)Supply and erection of all types of copper jumpers. 15
-
-
27058.5
... More
16(a)Supply and erection of structure bonds. 16
-
-
9800
... More
16(aa)Drilling of holes on rails 17
-
-
980
... More
16(b)Supply and erection of longitudinal bond. 18
-
-
1988
... More
16(c) Supply and erection of transverse and special bonds. 19
-
-
11466
... More
17(a)Supply and erection of Earth electrode. 20
-
-
5803
... More
17(b)Extra for special embedment of earth electrode. 21
-
-
1813
... More
31(a)Transfer of equipment from one mast or support to other. 22
-
-
27636
... More
31(d) Dismantling of Over Head Equipment. 23
-
-
1476.37
... More
31(f)Splicing and extension of Over head conductors. 24
-
-
3864
... More
31(h)Slewing of equipment. 25
-
-
3143
... More
31(k) (i) Dismantlement of OHE mast / structure by cutting. 26
-
-
9800
... More
31(l)(i) Retrieval of traction masts, main masts, TTC uprights etc. 27
-
-
35000
... More
31 (n) Dismantlement of guy rod. 28
-
-
1186.5
... More
31 ( r) Dismantling of cantilever assemblies including insulators
-
-
3465
... More
31 (t)(i)Dismantling of regulating equipment (Three pulley type) with counter weight assembly for conventional /composite OHE. 30
-
-
4462.5
... More
31 (t)(iv)Dismantling of copper jumper.
-
-
203
... More
31(t)(v)Dismantling of a material of termination of double over head equipment conductor.
-
-
784
... More
32/3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station under power block.
-
-
13595.75
... More
32/3(b)Erection of fabricated steel work such as TTC, Portals, SPS etc under power block. 34
-
-
36429.75
... More
32/3(e)Erection of Guy rod assembly under power block.
-
-
3955
... More
32/ 6(b)Erection of Contact wire only under power block.
-
-
2151.35
... More
32/8(a) (v)Erection of regulating equipment (3-pulley type) with counter weight assembly for conventional OHE under power block.
-
-
8925
... More
32/8 (b) (ii)Erection of material for terminations of Double Over Head Equipment conductor under power block. 39
-
-
3136
... More
32/ 11 (a)(i)Erection of 25 KV solid core cut-in insulator under power block. 40
-
-
2835
... More
32/15 (a)Erection of all types of copper jumpers under power block. 41
-
-
1827
... More
32/ 31(a)Transfer of equipment from one mast or support to other under power block. 42
-
-
27636
... More
32/31 (d) Dismantling of Over Head Equipment under power block. 43
-
-
1476.37
... More
32/31(f)Splicing and extension of Over Head conductors under power block. 44
-
-
3864
... More
32/31(h) Slewing of Equipment under Power Block. 45
-
-
3143
... More
32/ 31(k)(i)Dismantlement of OHE masts/structure by cutting under power block.
-
-
9800
... More
32/31(l) (i)Retrieval of traction masts, main masts, TTC uprights etc. under power block 47
-
-
17500
... More
32/ 31(n)Dismantlement of guy rod under power block. 48
-
-
1186.5
... More
32/ 31(r)Dismantling of Cantilever Assemblies including insulators under power block.
-
-
3465
... More
32/31 (t)(i)Dismantling of a regulating equipment (Three pulley type) with counter weight assembly for conventional OHE under power block. 50
-
-
1487.5
... More
32/31 (t) (iv)Dismantling of copper jumper under power block.
-
-
203
... More
32/31 (t)(v)Dismantling of a material of termination of double over head equipment conductor under power block. 52
-
-
784
... More
33/ 3(a)Extra on erection rate for steel work done manually under item No.3(a). 53
-
-
6783
... More
33/ 3(b)Extra on erection rate for steel work done manually under item No.3(b).
-
-
18207
... More
3(a) Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS Specifications.
-
-
855119.13
... More
3(b)Supply of fabricated steel work other than masts such as TTC's, portal sets (with all components) etc as per RDSO drawings and IS specifications.
-
-
307713
... More
3(c) Supply of Fabricated steel work other than mast, TTCs, portals, such as SPS, special fabricated steel etc.
-
-
156809.63
... More
8 (bx) (ii)Supply of insulators for item No.8 (b) (i)/(ii)/(iii)/(v)// (vi)(vii)(viii)/(ix) for polluted zone 61
-
-
19623.5
... More
11(ax) (ii)Supply of insulators for item Nos. 11(a) (i), (ii) for polluted zone.
-
-
15698.8
... More
Supply of 5mm dia droppers with dropper clips as per latest RDSO specifications. 63
-
-
7076.4
... More
Re-adjustment of OHE spans including erection of droppers. 64
-
-
35382
... More
Re adjustment of OHE spans including erection of droppers under power block. 65
-
-
35382
... More
Supply and erection of splice. 66
-
-
43279.26
... More
Erection of splice under power block. 67
-
-
707.64
... More
Dismantlment of existing droppers. 68
-
-
14152.8
... More
Dismantlment of existing droppers under power block.
-
-
14152.8
... More
Supply of Porcelain bracket insulator(1050 CD). 58
-
-
53520
... More
Supply of Porcelain stay insulator(1050 CD). 59
-
-
52680
... More
Supply of 25 kV Porcelain 9-Tone Insulator [Polluted Zone] 1050 mm CD.
-
-
27522
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%