Roads And Buildings Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Roads And Buildings Department Tender
Opening Date29 Jun 2021
Closing Date12 Jul 2021
Tender Amount₹ 4,88,493 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
420064Bid Award Id
ViewTender No
NIT No.29/TO/EE(R&B)NLR/2021-22, dated: 19.06.2021Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Clearing Juliflora (Prosafis) jungle including uprooting removing of Juliflora stumps and clearing away from site and stacking the useful material etc complete as directed by the department etc., complete.
12000
-
52800
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Towards hiring of JCB for removal of encroachments, debris, high berm cutting etc complete in the village limits as directed by the department.
14
-
11200
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Towards engaging special labour for clearing vents, debris, litter clearance, drain chutes etc complete as directed by the department.
20
-
8000
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;(2) Kappaladoruvu-Epuru Pattapupalem road from km 0/0 to 13/2:- Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with manual means in base courses on well prepared surface and compacting with Power road roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
5
-
10585
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Clearing Juliflora (Prosafis) jungle including uprooting removing of Juliflora stumps and clearing away from site and stacking the useful material etc complete as directed by the department etc., complete.
12000
-
52800
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Towards hiring of JCB for removal of encroachments, debris, high berm cutting etc complete in the village limits as directed by the department.
10
-
8000
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Towards engaging special labour for clearing vents, debris, litter clearance, drain chutes etc complete as directed by the department.
20
-
8000
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;(3) N.K. Road to Pottempadu (via) Brahmadevi from km 0/0 to 7/3:- Providing B.T patch work for broken edges & pot holes using 1.20 cum of 40-45mm (IRC) HBG metal with required quantity of 0.13 cum of 10-12mm HBG machine crushed chips as key chips and bulk bitumen 80/100 grade @ 42 Kgs per cubic meter for filling the pot holes and sealing the filled to pot holes with 10-12mm chips and bitumen including removal of loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning and applying tack coat, filling the pot holes rolling with power road roller of 8-10 tonnes capacity finishing, blinding the surface, including cost and conveyance of all materials to site and all labour charges for all operations for finished item of work.
2
-
10710
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Providing BT patch work for pot holes using 1.33 cum of 9.5-11.2mm size (IRC) HBG m/c chips and bulk bitumen 80/100 grade at 72 Kgs per one cum of chips as binder and tack coat including cost and conveyance of metal to site, T&P and all albour charges for all operations such as cleaning the surface, trimming edges of pot holes, applying tack coat, spreading stone ballast by hand packing and rolling with 80/100 Tonnes capacity power road roller, spreading bitumen at required consistency, including all operational and incidental charges complete for finished item of work as directed by the Engineer-in-charge
1
-
6703
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with manual means in base courses on well prepared surface and compacting with Power road roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
2
-
4413
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Clearing Juliflora (Prosafis) jungle including uprooting removing of Juliflora stumps and clearing away from site and stacking the useful material etc complete as directed by the department etc., complete.
9600
-
42240
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Towards hiring of JCB for removal of encroachments, debris, high berm cutting etc complete in the village limits as directed by the department.
10
-
8000
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Towards engaging special labour for clearing vents, debris, litter clearance, drain chutes etc complete as directed by the department.
20
-
8000
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;(4) Venkatachalam-Muthukur road to Thirumalammapalem road from km 0/0 to 8/7:- Providing B.T patch work for broken edges & pot holes using 1.20 cum of 40-45mm (IRC) HBG metal with required quantity of 0.13 cum of 10-12mm HBG machine crushed chips as key chips and bulk bitumen 80/100 grade @ 42 Kgs per cubic meter for filling the pot holes and sealing the filled to pot holes with 10-12mm chips and bitumen including removal of loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning and applying tack coat, filling the pot holes rolling with power road roller of 8-10 tonnes capacity finishing, blinding the surface, including cost and conveyance of all materials to site and all labour charges for all operations for finished item of work.
2
-
10391
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Providing BT patch work for pot holes using 1.33 cum of 9.5-11.2mm size (IRC) HBG m/c chips and bulk bitumen 80/100 grade at 72 Kgs per one cum of chips as binder and tack coat including cost and conveyance of metal to site, T&P and all albour charges for all operations such as cleaning the surface, trimming edges of pot holes, applying tack coat, spreading stone ballast by hand packing and rolling with 80/100 Tonnes capacity power road roller, spreading bitumen at required consistency, including all operational and incidental charges complete for finished item of work as directed by the Engineer-in-charge
1
-
6555
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with manual means in base courses on well prepared surface and compacting with Power road roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
2
-
4085
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Clearing Juliflora (Prosafis) jungle including uprooting removing of Juliflora stumps and clearing away from site and stacking the useful material etc complete as directed by the department etc., complete.
9600
-
42240
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Towards hiring of JCB for removal of encroachments, debris, high berm cutting etc complete in the village limits as directed by the department.
10
-
8000
MTC OF 4 NOS OF MDR ROADS IN PLAN WORKS SECTION NELLORE;Towards engaging special labour for clearing vents, debris, litter clearance, drain chutes etc complete as directed by the department.
20
-
8000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements