Roads And Buildings Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Roads And Buildings Department Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Opening Date5 Aug 2024
Closing Date24 Aug 2024
Tender Amount₹ 1,40,898 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Roofing with 0.5mm thickness Galvanized/pre-painted GI profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer, side laps are stitched with self tapping/drilling screws. wnd laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary groove.

43

42406

986.2

... More
Supply of MS tubes and pipes of required dia as per Is-1161, including labour charges for fabricating all heavy stell works like trusses , stachions, heavy beams and girders inluding cost of welding rods, power charges, erection in position and fixing by using pulley blocks, derek pole arrangements and cranes etc., cost and coveyance of all materials and all incidental charges etc., complete.

80

12280

153.5

... More
Painting to walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats+1 coat primer

68.59

21118

307.9

... More
Painting to walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-internal Colouring - acrylic emulsion paint - 2 Coats+1 coat primer

157

27412

174.6

... More
Painting to wood works with 2 coats of approved synthetic enamel paint of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for:-Painting to wood work - Synthetic enamel paint to old Wood Work - 2 coats

12

1749

145.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.