Roads And Buildings Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Roads And Buildings Department Tender
Civil And Construction
Building Construction
Opening Date26 Mar 2024
Closing Date8 Apr 2024
Tender Amount₹ 18,46,971
Costs
EMD
₹ 18,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
734899Tender No
SHORT NIT NO 39(12)/TO/2023-24, dt.15.03.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Filling with Carted Gravel in trenches, sides of foundations & basement from approved quarry consolidating deposited layer by watering and ramming, including all operational, incidental, labour charges, complete including cost and conveyance of sand / gravel for finished item of work. (APSS No 309 & 310).
310
153760
496
Pile Cape
1.48
17532
11846
Plinth beams
2.6
37703
14501
Columns /4.27 M
3.1
47365
15279
Roof beam
3.4
44584
13113
Roof slab 125mm thick
107
168953
1579
Lintels/3.66mt
0.3
4162
13875
Door
8.2
7872
960
Temple Cross walls
9.1
81636
8971
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140)
31
296360
9560
Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes, on cost of all materials complete for finished item of work
3.1
279521
90168
Ornamental plastering to ceiling 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Ceiling Plastering 2/c in CM (1:3) & (1:5): 12 mm
73
42340
580
Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)
177
99474
562
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)
230
133860
582
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., and overheads & contractors profit complete for finished item of work in all floors.
513
24624
48
Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc., and overheads & contractors profit complete in all floors (APSS No.1200, 1207 & 1211).
43
11395
265
Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including providing 4" coving with cement concrete in (1:2:4) prop. rounding off the wall and slab junction etc., complete for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm
107
65377
611
MD
3.6
35298
9805
Supply and fixing windows with cement frame and mullion of section 100mm x 65 mm with 5mm thick plain float glass including cost and conveyance to site of teak wood frame, 5mm plain glass , supply and fixing 6 nos MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 2 Nos butt hinges 100mm long per each shutter, 2 Nos tower bolt of 100 mm per each shutter , 1 No 125 mm long handle per each shutter, including MS Grill using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 30cm centre to centre, including fixing the fixtures to window with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, fixing the grill etc. complete for finished item of work as per approved drawing.
3.85
26900
6987
Flooring with Vitrified tiles of Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick and filling the joints with laticrete epoxy grout of pigment of approved shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed)cost of excluding seigniorage on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701)
97
114654
1182
22.20 mm dia PVC pipe
120
14040
117
28.60 mm dia PVC pipe
70
12740
182
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make heavy duty (short body) as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit and etc., complete for finished item of work in all floors.
4
1796
449
Supplying and fixing Gunmetal Gate ( GM peet ) valve as perSS Ball and SS Spindle as per IS Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit and etc., complete -15 mm NB Size. Temple Building
4
2468
617
Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , overheads & contractors profit and etc., complete for finished item of work.
1000
9940
9.94
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements