Roads And Buildings Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Roads And Buildings Department Tender
Civil And Construction
Opening Date20 May 2020
Closing Date3 Jun 2020
Tender Amount₹ 22,81,975 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
332168Bid Award Id
ViewTender No
NIT No.28/2020-21/E.E(R&B) Ongole, Dated: 13-05-2020Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Ongole - Chandrapalem Road Km.0/0 to 13/2
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
20
81060
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
35
182175
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
9000
39600
-
Ongole - Rudravaram Road Km.0/0 to 10/6
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
14
56742
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
25
130125
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
9600
42240
-
SP Road to Elurivaripalem Road Km.0/0 to 10/2
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
10
40530
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
20
104100
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
6000
26400
-
Naidupalem to Ongole Road Km.15/0 to 23/6
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
10
40530
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
20
104100
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
6420
28248
-
Ramachandrapuram - Sivarampuram Road Km.0/0 to 27/916
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
42
170226
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
60
312300
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
17040
74976
-
Chimakurthy to Kostalu Road Km.0/0 to 14/0
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
6
24318
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
9
46845
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
3600
15840
-
ON Road to Manchikalapadu Km.0/0 to 2/8
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
3
12159
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
6
31230
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
1800
7920
-
DC Road to Pallamalli Road from Km.0/0 to 4/850
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
7
28371
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
12
62460
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
4200
18480
-
Elurivaripalem to Ramatheertham Road from Km.0/0 to 21/600
Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
15
60795
-
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
25
130125
-
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
8700
38280
-
Rupees Twenty two lakhs ninety eight thousand five hundred and twenty five only
-
2298525
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements