Roads And Buildings Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Roads And Buildings Department Tender

Civil And Construction
Road Construction
Opening Date10 Mar 2022
Closing Date24 Mar 2022
Tender Amount₹ 8,68,66,228 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;PCC(1:3:6) Nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing complete asper Morth Spn no.2100.

49

-

254114

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,, and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings of Abutments, Piers & Wing walls.

483

-

2877231

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,, and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure for abutments, Piers and wing walls

774

-

4876974

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision) and as directed by the Engineer-in-Charge for Kerbs, Bed blocks & Backing walls Height upto 5m

37

-

256484

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700,2300 and as per M.O.T DRG No No.SD/114 for Deck slab a) Ht upto 5.0m

852

-

6782772

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,, and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course below approach slab. Levelling course below approach slab

12

-

68736

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing,excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 and as per MOST Drg.No.SD/104 for Approach slab.

31

-

208351

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 and as per M.O.T.Drg.No. SD/101 for wearing coat over Deck slab.

75

-

504750

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm hard broken graded granite crushed metal (SS-5) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P and all water leads etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 809,1500,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Crash barrier, excluding Reinforcement.

182

-

388206

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2300 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

71.6

-

6035522

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

12.3

-

1013101.8

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2100 (5th revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.

5.7

-

467884.5

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision) and as directed by the Engineer-in-Charge for quadrants

59

-

158297

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Pitching with ss revetment 300 mm size rough stone including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

16

-

29872

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and laying filter material with Gravel underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

30

-

45480

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Back filling behind Abutments with gravel including cost ,conveyance and , of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 and as per Cl 710.1.4 of IRC :78

454

-

524370

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal , charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

115

-

237475

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)

255

-

70380

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification No.2705 and as per drawing SD / 102

16

-

52256

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).

2882

-

789668

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-3 including cost, , charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

408

-

892296

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost,, of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.

272

-

656880

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying primer coat with bitumen emulsion (SS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per MoRT&H specification clause No.502 and as directed by the Engineer-in-Charge.

1040

-

61464

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying tack coat with bitumen 80/100 VG10 (Bulk) using Bitumen pressure distributor at the rate of 0.25 kgs per sqm on the prepared granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1040

-

15496

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant producing an average output of 75 tonnes per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-7 of MoRT&H specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all T&P and all other contingent charges necessary , complete and as per MoRTH specification No. 504 (5th Revision) .

52

-

390676

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying tack coat with bitumen 80/100 VG 10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1040

-

12896

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type hot mix plant producing an average output of 75 tonnes per hour using HBG crushed aggregates of Grading-2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bitumen binder VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

32

-

324224

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)

825

-

226050

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing, laying Reinforced cement concrete Hume pipes of 1000mm Dia., NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete Labour charges for laying, jointing 1000 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing as per MoRT&H specification 2900,2905 and 2906(4th Revision) and IRC Special Publication No:13 and as dircted by the Engineer-in-Charge for finished item of work.

45

-

178065

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete including , for finished item of work as per MoRT&H specification 304(5th Revision) Above LWL in ordinary soil excluding dewatering charges(upto 3m)

488

-

60512

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete including , for finished item of work as per MoRT&H specification 304(5th Revision) in SDR

167

-

26553

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete including , for finished item of work as per MoRT&H specification 304(5th Revision) in Hard rock

168

-

129192

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;PCC(1:3:6) Nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing complete asper Morth Spn no.2100.

31

-

151590

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,, and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings of Abutments, Piers & Wing walls.

290

-

1631540

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,, and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure for abutments, Piers and wing walls

414

-

2463300

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Kerbs, Bed blocks & Backing walls Height upto 5m

22

-

144210

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700,2300 and as per M.O.T DRG No No.SD/114 for Deck slab a) Ht upto 5.0m

426

-

3209058

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,, and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course below approach slab.

12

-

64908

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing,excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 and as per MOST Drg.No.SD/104 for Approach slab.

31

-

197098

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 and as per M.O.T.Drg.No. SD/101 for wearing coat over Deck slab.

41

-

261129

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm hard broken graded granite crushed metal (SS-5) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P and all water leads etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 809,1500,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Crash barrier, excluding Reinforcement.

99

-

199881

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2300 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

37.7

-

3045066.7

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

6.4

-

505107.2

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2100 (5th revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.

3.3

-

259558.2

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 (5th Revision) and as directed by the Engineer-in-Charge for quadrants

41

-

102500

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Pitching with ss revetment 300 mm size rough stone including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

14

-

24122

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and laying filter material with Gravel underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

21

-

28371

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Back filling behind Abutments with gravel including cost, conveyance of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 and as per Cl 710.1.4 of IRC :78

303

-

304212

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal , charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

99

-

189387

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)

217

-

57505

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification No.2705 and as per drawing SD / 102

8

-

25040

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).

4029

-

1103946

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-3 including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

470

-

997810

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.

313

-

735550

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying primer coat with bitumen emulsion (SS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per MoRT&H specification clause No.502 and as directed by the Engineer-in-Charge.

1197

-

70742.7

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying tack coat with bitumen 80/100 VG10 (Bulk) using Bitumen pressure distributor at the rate of 0.25 kgs per sqm on the prepared granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1197

-

17835.3

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant producing an average output of 75 tonnes per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-7 of MoRT&H specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all T&P and all other contingent charges necessary , complete and as per MoRTH specification No. 504 (5th Revision) .

60

-

446460

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying tack coat with bitumen 80/100 VG 10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1197

-

14842.8

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch Mix type hot mix plant producing an average output of 75 tonnes per hour using HBG crushed aggregates of Grading-2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bitumen binder VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

36

-

362016

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)

750

-

205500

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing, laying Reinforced cement concrete Hume pipes of 1000mm Dia., NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete Labour charges for laying, jointing 1000 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing as per MoRT&H specification 2900,2905 and 2906(4th Revision) and IRC Special Publication No:13 and as dircted by the Engineer-in-Charge for finished item of work.

30

-

116730

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).

7960

-

2181040

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Forming embankment with Side earth by mechanical means upto SDR including pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).

2652

-

466752

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines , grades and cross sections etc., complete for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge

4420

-

305422

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3

409

-

3681

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).

1613

-

3474402

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.

2412

-

5706792

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.70 kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge

8868

-

524098.8

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.25 kgs per sqm on the prepared Granular surface treated with primer cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

8868

-

132133.2

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surfaces cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

34380

-

426312

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant producing an average output of 75 tonnes per hour using hard blasted granite crushed aggregates of Grading - 2 as per table 500-7 of MoRT&H specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all T&P and all other contingent charges necessary , complete and as per MoRTH specification No. 504 (5th Revision) .

917

-

6839903

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing and laying of 30 mm thick Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading ? 2 as per Table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

550

-

5541250

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement

152

-

637336

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.

651

-

3889725

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2100 (5th revision) and as per I.S.1786 of 1985 for CC Pavement

0.3

-

21405

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for CC Pavement

1.1

-

77745.8

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Supplying and laying of seperation membrane 125 micron and as per ISI standard specification duly fixing over DLCC including cost, conveyance of all materials etc., complete and as directed by the Engineer-in-Charge during execution of work.

3255

-

49638.75

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing 25.4 mm thick Mastic pads for Expansion joints etc., complete for finished item of work.

14

-

11746

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete grade M-15 & M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)

91

-

66339

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge

451

-

51188.5

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings and Raft foundation .

47

-

242191

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure .

244

-

1330044

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing, laying Reinforced cement concrete Hume pipes of 800 mm Dia., NP-4 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 800 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

20

-

116040

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 800 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

160

-

1564480

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Filling in between body walls with gravel including cost and conveyance of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 & 2907 (5th Revision) and as per Drawing and technical specifications for finished item of work.

147

-

110103

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

165

-

14388

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge a) Above LWL (Excluding dewatering Charges

438

-

49713

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge b) Below LWL (Including Dewatering Charges)

438

-

69729.6

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation.

20

-

89620

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings of Abutments, Piers, & Wingwalls.

116

-

597748

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure of Abutments, Piers, & Wingwalls.

133

-

724983

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (4th revision ) and as directed by the Engineer-in-Charge for Bed blocks & Backing walls (Sub-structure)

11.5

-

68712.5

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2300 (5th revision ) and as directed by the Engineer-in-Charge for Deck slab

39

-

266487

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100,2700 (5th Revision) for levelling course

13

-

64415

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge for Approach slab.

33

-

191664

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69( A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.

13

-

75816

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure (Body Walls) .

3

-

16353

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2300 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

6

-

441462

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

3.6

-

259333.2

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)

101

-

24442

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Supplying and fixing of CI Drainage spouts complete as per MoRT&H specification No. 2705 (5th Revision)

12

-

20220

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).

57

-

15618

... More
Widening and Strengthening of Single Lane to Double Lane from km 0.0 to 3.450 and HLB at Km 5/2 4 of;Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

19.18

-

1672.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.