Roads And Buildings Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Roads And Buildings Department Tender

Works
Civil And Construction
Road Construction
Opening Date22 Nov 2024
Closing Date29 Nov 2024
Tender Amount₹ 8,75,324 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing BT Patchwork using 40mm HBG MC metal with 42 Kgs of Bulk Bitumen 80/100 grade and 0.13cum of 9.5 to 11.2mm HBG m/c chips as key chips / 1 cum of metal including cost, conveyance of all materials to site and all labour charges for cutting the potholes to rectangular shape, cleaning, heating bitumen, applying tack coat with hot bitumen, carrying and spreading stone ballast by hand, compacting with 8 to 10 Tonnes Road Roller, spreading bitumen to the required consistency, including fuel charges for heating bitumen and hire and incidental charges of bitumen boiler etc., complete for finished item of work.

18.7

5825

108928

... More
Providing BT Patchwork for Pot holes using 1.0cum of 9.50 to 11.20mm HBG machine crushed chips with 72 Kgs of bulk Bitumen 80/100 grade/1 cum of chips and 0.15cum of Stone dust for flushing on top/cum of chips Including cost. conveyance of all materials to site and all labour charges for cutting the potholes to rectangular shape, cleaning, heating bitumen. applying tack coat with hot bitumen, carrying and spreading stone ballast by hand, compacting with 8 to 10 Tonnes Road Roller. spreading bitumen to the required consistency, including fuel charges for heating bitumen and hire and incidental charges of bitumen boiler etc... complete for finished item of work.

62.5

7179

448688

... More
Providing BT Patchwork using 40mm HBG MC metal with 42 Kgs of Bulk Bitumen 80/100 grade and 0.13cum of 9.5 to 11.2mm HBG m/c chips as key chips / 1 cum of metal including cost, conveyance of all materials to site and all labour charges for cutting the potholes to rectangular shape, cleaning, heating bitumen, applying tack coat with hot bitumen, carrying and spreading stone ballast by hand, compacting with 8 to 10 Tonnes Road Roller, spreading bitumen to the required consistency, including fuel charges for heating bitumen and hire and incidental charges of bitumen boiler etc., complete for finished item of work.

10.7

5893

63055

... More
Providing BT Patchwork for Pot holes using 1.0cum of 9.50 to 11.20mm HBG machine crushed chips with 72 Kgs of bulk Bitumen 80/100 grade/1 cum of chips and 0.15cum of Stone dust for flushing on top/cum of chips Including cost. conveyance of all materials to site and all labour charges for cutting the potholes to rectangular shape, cleaning, heating bitumen. applying tack coat with hot bitumen, carrying and spreading stone ballast by hand, compacting with 8 to 10 Tonnes Road Roller. spreading bitumen to the required consistency, including fuel charges for heating bitumen and hire and incidental charges of bitumen boiler etc... complete for finished item of work.

19.2

7248

139162

... More
Providing BT Patchwork using 40mm HBG MC metal with 42 Kgs of Bulk Bitumen 80/100 grade and 0.13cum of 9.5 to 11.2mm HBG m/c chips as key chips / 1 cum of metal including cost, conveyance of all materials to site and all labour charges for cutting the potholes to rectangular shape, cleaning, heating bitumen, applying tack coat with hot bitumen, carrying and spreading stone ballast by hand, compacting with 8 to 10 Tonnes Road Roller, spreading bitumen to the required consistency, including fuel charges for heating bitumen and hire and incidental charges of bitumen boiler etc., complete for finished item of work.

1.5

5659

8489

... More
Providing BT Patchwork for Pot holes using 1.0cum of 9.50 to 11.20mm HBG machine crushed chips with 72 Kgs of bulk Bitumen 80/100 grade/1 cum of chips and 0.15cum of Stone dust for flushing on top/cum of chips Including cost. conveyance of all materials to site and all labour charges for cutting the potholes to rectangular shape, cleaning, heating bitumen. applying tack coat with hot bitumen, carrying and spreading stone ballast by hand, compacting with 8 to 10 Tonnes Road Roller. spreading bitumen to the required consistency, including fuel charges for heating bitumen and hire and incidental charges of bitumen boiler etc... complete for finished item of work.

2.2

7010

15422



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.