Roads And Buildings Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Roads And Buildings Department Tender

Works
Civil And Construction
Road Construction
Opening Date22 Nov 2024
Closing Soon29 Nov 2024
Tender Amount₹ 20,75,193 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing BT Patchwork using 40mm HBG MC metal with 42 Kgs of Bulk Bitumen 80/100 grade and 0.13cum of 9.5 to 11.2mm HBG m/c chips as key chips / 1 cum of metal including cost, conveyance of all materials to site and all labour charges for cutting the potholes to rectangular shape, cleaning, heating bitumen, applying tack coat with hot bitumen, carrying and spreading stone ballast by hand, compacting with 8 to 10 Tonnes Road Roller, spreading bitumen to the required consistency, including fuel charges for heating bitumen and hire and incidental charges of bitumen boiler etc., complete for finished item of work.

76

5684

431984

... More
Providing BT patch work to the specified thickness as directed by the department using 9.5 mm to 11.2 mm size IRC gauge HBG M/C key chips using 72 kgs of 80/100 grade bitumen for 1 cum of chips and .15 cum of stone dust cutting the existing pot holes to rectangular shape with vertical sides or as directed by the department, removal loose aggregate, brushing cleaning and dusting the existing road surface, heating and spraying bitumen for tack coat as directed by the department, pre-mixing bitumen and metal, spreading the premix in flush with the riding surface, hand packing sectioning to proper camber, tamping with heavy rammers, laying bitumen to the top surface as directed by the department etc. complete including cost and conveyance of metal, Bitumen and all labour charges, hire and operational charges of boiler and other small T&P cost of firewood, kerosine and other incidental charges etc., complete for B.T.patch work.

82

7034

576788

... More
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3

705

10

7332

... More
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and compacting with Smooth wheeled roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.

85

2554

217090

... More
Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.70 kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge

705

39

27777

... More
Providing BT Patchwork using 40mm HBG MC metal with 42 Kgs of Bulk Bitumen 80/100 grade and 0.13cum of 9.5 to 11.2mm HBG m/c chips as key chips / 1 cum of metal including cost, conveyance of all materials to site and all labour charges for cutting the potholes to rectangular shape, cleaning, heating bitumen, applying tack coat with hot bitumen, carrying and spreading stone ballast by hand, compacting with 8 to 10 Tonnes Road Roller, spreading bitumen to the required consistency, including fuel charges for heating bitumen and hire and incidental charges of bitumen boiler etc., complete for finished item of work.

38

5698

216524

... More
Providing BT patch work to the specified thickness as directed by the department using 9.5 mm to 11.2 mm size IRC gauge HBG M/C key chips using 72 kgs of 80/100 grade bitumen for 1 cum of chips and .15 cum of stone dust cutting the existing pot holes to rectangular shape with vertical sides or as directed by the department, removal loose aggregate, brushing cleaning and dusting the existing road surface, heating and spraying bitumen for tack coat as directed by the department, pre-mixing bitumen and metal, spreading the premix in flush with the riding surface, hand packing sectioning to proper camber, tamping with heavy rammers, laying bitumen to the top surface as directed by the department etc. complete including cost and conveyance of metal, Bitumen and all labour charges, hire and operational charges of boiler and other small T&P cost of firewood, kerosine and other incidental charges etc., complete for B.T.patch work.

0.61

7048

4299



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.