Roads And Buildings Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Roads And Buildings Department Tender
Opening Date20 May 2020
Closing Date3 Jun 2020
Tender Amount₹ 20,88,863 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
332114Bid Award Id
ViewTender No
NIT No.22/2020-21/E.E(R&B) Ongole, Dated: 13-05-2020Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Medarametla - Rachapudi Road from Km.0/0 to 18/0 Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
25
105625
-
... More
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
32
172512
-
... More
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
30000
132000
-
... More
TNK Road to J.Panguluru from Km.0/0 to 22/0 Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
35
149240
-
... More
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
52
282620
-
... More
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
42000
184800
-
... More
J.Panguluru to B. Nidamanur Road from Km.0/0 to 20/2 Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
30
126780
-
... More
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
40
215680
-
... More
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
35000
154000
-
... More
NH.5 to Ravinuthala Road from Km.0/0 to 7/8 Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
12
49932
-
... More
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
20
106440
-
... More
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
13500
59400
-
... More
Singarakonda Ghat Road from Km.0/0 to 2/8 Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
3
11709
-
... More
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
7
35301
-
... More
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
1200
5280
-
... More
Katrapadu - Sankarapuram Road from Km.0/0 to 4/675 Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
7
28287
-
... More
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
12
62316
-
... More
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
9000
39600
-
... More
Old M-C Road in Medarametla Village Providing B.T patch work using 40 mm (IRC) HBG metal with required quantity of 9.5-11.2 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 42 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
6
24594
-
... More
Providing B.T. patch work using 9.5-11.20 mm HBG (IRC) machine crushed key chips and 80/100 grade bulk bitumen 72 kgs per cum for filling pot holes including removal of loose material in the pot holes trimming the edges the provide firm vertical faces cleaning , applying tack coat filling pot holes rolling with Power Roller including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work.
15
78810
-
... More
Clearing juliflor (prosafts) jungle including uprooting and removing of juliflor stumps etc., complete and as directed by the Engineer-in-Charge during execution of work.
3000
13200
-
... More
Rupees Twenty three lakhs fifteen thousand five hundred and fifty six only
-
2315556
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements