Roads And Buildings Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Roads And Buildings Department Tender

Opening Date4 Jun 2020
Closing Date18 Jun 2020
Tender Amount₹ 4,81,764 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying prime coat with bitumen Emulsion (SS1) (Bulk) using Emulsion pressure distributor on prepared surface of granular base including cleari ng of road surface and spraying emulsion at the rate of 0.70Kg/sqm using emulsion pressure distrihbutor for finished item of work etc., complete as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-Charge.

769

27607

-

... More
Providing and applying tack coat with bitumen 80/100 Gr (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th Revision) and as directed by the Engineer-in-Charge.

769

7074

-

... More
Providing, laying of close graded premix surfacing material (Mixed seal surfacing) of 20mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2 mm to 0.09mm (Type ‘B’) as per Table 500-19 of specification 508 of MoRT&H (5th Revision) premixed with bituminous binder VG-30 (60/70) grade @ 19.00 Kg per 10 Sqm area including cost of all materials and transporting the hot mix to work site, laying with Hydralic paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H (5th Revision) Specification No. 508 complete for finished item of work in all respected as directed by Engineer-in-Charge.

1501

208639

-

... More
Forming shoulders with borrowed useful seclected earth having MDD of not less than 1.75 gms/cc from outside road boundary by mechanical means with all leads and lifts including pre-watering of soil at borrowed area, removal oftop soils, excavation onsoils of borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning and consolidation with vibrtatory road roller@ OMC to meet requirement of table 300-2 of MORT&H including all hire and operational charges of T&P complete for finished item of work as per MORT&H specification 305 (5th revision).

180

32040

-

... More
(RUPEES FIVE LAKHS TWELVE THOUSAND FIVE HUNDRED AND FIFTEEN ONLY)

-

512515

-

... More
Rate of progress

-

-

-

... More
Progress Upto 1 month - 100% of work should be completed in all respects.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.