Roads And Buildings Department Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Roads And Buildings Department Tender
Civil And Construction
Building Construction
Opening Date31 Jan 2025
Closing Soon14 Feb 2025
Tender Amount₹ 7,39,637
Costs
EMD
₹ 7,396Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
783312Tender No
NIT No. 182/ TO/DB/EE/R&B/TKL/2024-25, dt: 24.01.2025Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140)
12
-
94764
... More
No. of corrections______only.
-
-
-
... More
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140)
5
-
4525
... More
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm
162
-
75006
... More
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Ceiling Plastering 1/c in CM (1:5): 12 mm
90
-
31950
... More
No. of corrections______only.
-
-
-
... More
Supply and fixing doors as per drawings with sal wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides and 1mm thick laminated sheet attached to flush shutter on both sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top , 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 50 mm) (900mm x 2000mm) Single Shutter
1.89
-
9710.82
... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls for:-Internal Colouring - acrylic emulsion paint - 2 Coats + 1 coat primer
495
-
70785
... More
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats+1 coat primer
178
-
45390
... More
Painting to old wood works with 2 coats of approved synthetic enamel paint of approved brand and shade over 1 coat of wood primer of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for:-Painting to wood work - Synthetic enamel paint to New Wood Work - 2 coats + 1 coat wood primer
32
-
6048
... More
No. of corrections______only.
-
-
-
... More
Supply and fixing of Stainless steel fly proof wire mesh of not less than 20 gauge including all labour charges etc., complete for finished item of work.
28.8
-
19699.2
... More
Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundation levelling courses and flooring beds using 40mm size (SS5) hard Granite metal upto Plinth level from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402) for:-Machine Mix-PCC (1:4:8) NOMINAL MIX
1.3
-
5532.8
... More
Dismantling of Brick masonry and clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete
1.2
-
331.2
... More
No. of corrections______only.
-
-
-
... More
Supplying & fixing CPVC pipes of SDR 11 of standard make and ISI mark on ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils (except rock requiring blasting), refilling, chiseling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on Teak Wood blocks on walls including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work For 34.90 mm dia OD
35
-
12775
... More
Supplying & fixing CPVC pipes of SDR 11 of standard make and ISI mark on ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils (except rock requiring blasting), refilling, chiseling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on Teak Wood blocks on walls including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work For 28.60 mm dia OD
25
-
6950
... More
Supplying & fixing CPVC pipes of SDR 11 of standard make and ISI mark on ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils (except rock requiring blasting), refilling, chiseling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on Teak Wood blocks on walls including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work For 22.20 mm dia OD
20
-
4500
... More
Providing 110 mm Dia ISI marked PVC (Sudhakar / Nandhini) down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)
4
-
1096
... More
No. of corrections______only.
-
-
-
... More
Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work.
2000
-
19400
... More
Supplying and fixing 12.7mm N.P bib tap Indian make heavy duty (Short body) including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work.
10
-
2820
... More
Supplying and fixing Gunmetal Gate ( GM peet ) valve as per IS-778 Class - I , Indian make heavy type - 20mm NB Size including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work.
2
-
1846
... More
(RUPEES SEVEN LAKHS THIRTY NINE THOUSAND SIX HUNDRED AND THIRTY SEVEN ONLY)
-
-
739637
... More
No. of corrections______only.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%