Roads And Buildings Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Roads And Buildings Department Tender
Civil And Construction
Road Construction
Opening Date4 Aug 2022
Closing Date16 Aug 2022
Tender Amount₹ 3,41,593 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532728Bid Award Id
ViewTender No
Short NIT No.3/TO/e.pro/22-23, Dated 15.07.2022 (2)Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Maintenance;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and rolling with 8-10 Ton power road roller etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work for the following Roads for patch work Gogulampadu-Lopudi Road
3
-
7641
... More
Maintenance;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and rolling with 8-10 Ton power road roller etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work for the following Roads for patch work Surepalli to Chekkapalli Road
3
-
7872
... More
Maintenance;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and rolling with 8-10 Ton power road roller etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work for the following Roads for patch work Lopudi-Yerravarigudem Road
3
-
8010
... More
Maintenance;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and rolling with 8-10 Ton power road roller etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work for the following Roads for patch work Nelapativarikunta to Tallavalli Road
4
-
9760
... More
Maintenance;Providing B.T. Patch work for filling pot holes using 40 to 45mm IRC HBG Machine Crushed metal using 1.10 cum., of metal per 1.0 Cum of compacted quantity and 0.13 cum of 9.5mm to 11.2mm size HBG machine crushed chips as key chips using a total quantity of 42 Kgs., of bitumen VG 10 per 1 Cum., for filling the pot holes including removal of loose materials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat and premixing the material, filling the pot holes, rolling with 8-10 Ton power road roller and finishing including all cost of material, T&P and labour charges for all operations etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads Tukkuuru-Koppaka Road
3
-
17859
... More
Maintenance;Providing B.T. Patch work for filling pot holes using 40 to 45mm IRC HBG Machine Crushed metal using 1.10 cum., of metal per 1.0 Cum of compacted quantity and 0.13 cum of 9.5mm to 11.2mm size HBG machine crushed chips as key chips using a total quantity of 42 Kgs., of bitumen VG 10 per 1 Cum., for filling the pot holes including removal of loose materials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat and premixing the material, filling the pot holes, rolling with 8-10 Ton power road roller and finishing including all cost of material, T&P and labour charges for all operations etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads Gopavaram-Meerjapuram Road
3
-
17988
... More
Maintenance;Providing B.T. Patch work for filling pot holes using 40 to 45mm IRC HBG Machine Crushed metal using 1.10 cum., of metal per 1.0 Cum of compacted quantity and 0.13 cum of 9.5mm to 11.2mm size HBG machine crushed chips as key chips using a total quantity of 42 Kgs., of bitumen VG 10 per 1 Cum., for filling the pot holes including removal of loose materials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat and premixing the material, filling the pot holes, rolling with 8-10 Ton power road roller and finishing including all cost of material, T&P and labour charges for all operations etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads Link Road to NE Road Via Gopavaram
3
-
17904
... More
Maintenance;Providing B.T. Patch work for filling pot holes using 40 to 45mm IRC HBG Machine Crushed metal using 1.10 cum., of metal per 1.0 Cum of compacted quantity and 0.13 cum of 9.5mm to 11.2mm size HBG machine crushed chips as key chips using a total quantity of 42 Kgs., of bitumen VG 10 per 1 Cum., for filling the pot holes including removal of loose materials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat and premixing the material, filling the pot holes, rolling with 8-10 Ton power road roller and finishing including all cost of material, T&P and labour charges for all operations etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads Gogulampadu-Lopudi Road
3
-
17952
... More
Maintenance;Providing B.T. Patch work for filling pot holes using 40 to 45mm IRC HBG Machine Crushed metal using 1.10 cum., of metal per 1.0 Cum of compacted quantity and 0.13 cum of 9.5mm to 11.2mm size HBG machine crushed chips as key chips using a total quantity of 42 Kgs., of bitumen VG 10 per 1 Cum., for filling the pot holes including removal of loose materials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat and premixing the material, filling the pot holes, rolling with 8-10 Ton power road roller and finishing including all cost of material, T&P and labour charges for all operations etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads Surepalli to Chekkapalli Road
3
-
18168
... More
Maintenance;Providing B.T. Patch work for filling pot holes using 40 to 45mm IRC HBG Machine Crushed metal using 1.10 cum., of metal per 1.0 Cum of compacted quantity and 0.13 cum of 9.5mm to 11.2mm size HBG machine crushed chips as key chips using a total quantity of 42 Kgs., of bitumen VG 10 per 1 Cum., for filling the pot holes including removal of loose materials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat and premixing the material, filling the pot holes, rolling with 8-10 Ton power road roller and finishing including all cost of material, T&P and labour charges for all operations etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads Lopudi-Yerravarigudem Road
3
-
18297
... More
Maintenance;Providing B.T. Patch work for filling pot holes using 40 to 45mm IRC HBG Machine Crushed metal using 1.10 cum., of metal per 1.0 Cum of compacted quantity and 0.13 cum of 9.5mm to 11.2mm size HBG machine crushed chips as key chips using a total quantity of 42 Kgs., of bitumen VG 10 per 1 Cum., for filling the pot holes including removal of loose materials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat and premixing the material, filling the pot holes, rolling with 8-10 Ton power road roller and finishing including all cost of material, T&P and labour charges for all operations etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads Nelapativarikunta to Tallavalli Road
2
-
11766
... More
Maintenance;Clearing the light jungle from road side berms as directed by the Engineer-in-Charge
1000
-
2800
... More
Maintenance;Providing B.T. Patch work for pot holes using 9.5mm to 11.2mm IRC HBG machine crushed chips using 1.15 cum., per one cum. of compacted quantity and precoated with bitumen VG10 grade using a total quantity of 72 Kgs., and premixing the material of One cubic metre and flushing stone dust on top surface including all operational charges such as trimming the edges and removal of the loose materials cleaning the surface applying tack coat with hot bitumen carrying and spreading the stone ballast rolling with 8 to 10 Ton power road roller and finishing and spreading bitumen with required consistency, including fuel charges for heating of bitumen and hire and operational charges of all cost of material, T&P and labour charges and all other incidental charges complete as per Specification for finished item of work and as directed by the Engineer-in-Charge for the following Roads Tukkuuru-Koppaka Road
3
-
22014
... More
Maintenance;Providing B.T. Patch work for pot holes using 9.5mm to 11.2mm IRC HBG machine crushed chips using 1.15 cum., per one cum. of compacted quantity and precoated with bitumen VG10 grade using a total quantity of 72 Kgs., and premixing the material of One cubic metre and flushing stone dust on top surface including all operational charges such as trimming the edges and removal of the loose materials cleaning the surface applying tack coat with hot bitumen carrying and spreading the stone ballast rolling with 8 to 10 Ton power road roller and finishing and spreading bitumen with required consistency, including fuel charges for heating of bitumen and hire and operational charges of all cost of material, T&P and labour charges and all other incidental charges complete as per Specification for finished item of work and as directed by the Engineer-in-Charge for the following Roads Gopavaram-Meerjapuram Road
3
-
22137
... More
Maintenance;Providing B.T. Patch work for pot holes using 9.5mm to 11.2mm IRC HBG machine crushed chips using 1.15 cum., per one cum. of compacted quantity and precoated with bitumen VG10 grade using a total quantity of 72 Kgs., and premixing the material of One cubic metre and flushing stone dust on top surface including all operational charges such as trimming the edges and removal of the loose materials cleaning the surface applying tack coat with hot bitumen carrying and spreading the stone ballast rolling with 8 to 10 Ton power road roller and finishing and spreading bitumen with required consistency, including fuel charges for heating of bitumen and hire and operational charges of all cost of material, T&P and labour charges and all other incidental charges complete as per Specification for finished item of work and as directed by the Engineer-in-Charge for the following Roads Link Road to NE Road Via Gopavaram
3
-
22059
... More
Maintenance;Providing B.T. Patch work for pot holes using 9.5mm to 11.2mm IRC HBG machine crushed chips using 1.15 cum., per one cum. of compacted quantity and precoated with bitumen VG10 grade using a total quantity of 72 Kgs., and premixing the material of One cubic metre and flushing stone dust on top surface including all operational charges such as trimming the edges and removal of the loose materials cleaning the surface applying tack coat with hot bitumen carrying and spreading the stone ballast rolling with 8 to 10 Ton power road roller and finishing and spreading bitumen with required consistency, including fuel charges for heating of bitumen and hire and operational charges of all cost of material, T&P and labour charges and all other incidental charges complete as per Specification for finished item of work and as directed by the Engineer-in-Charge for the following Roads Gogulampadu-Lopudi Road
2
-
14740
... More
Maintenance;Providing B.T. Patch work for pot holes using 9.5mm to 11.2mm IRC HBG machine crushed chips using 1.15 cum., per one cum. of compacted quantity and precoated with bitumen VG10 grade using a total quantity of 72 Kgs., and premixing the material of One cubic metre and flushing stone dust on top surface including all operational charges such as trimming the edges and removal of the loose materials cleaning the surface applying tack coat with hot bitumen carrying and spreading the stone ballast rolling with 8 to 10 Ton power road roller and finishing and spreading bitumen with required consistency, including fuel charges for heating of bitumen and hire and operational charges of all cost of material, T&P and labour charges and all other incidental charges complete as per Specification for finished item of work and as directed by the Engineer-in-Charge for the following Roads Surepalli to Chekkapalli Road
3
-
22314
... More
Maintenance;Providing B.T. Patch work for pot holes using 9.5mm to 11.2mm IRC HBG machine crushed chips using 1.15 cum., per one cum. of compacted quantity and precoated with bitumen VG10 grade using a total quantity of 72 Kgs., and premixing the material of One cubic metre and flushing stone dust on top surface including all operational charges such as trimming the edges and removal of the loose materials cleaning the surface applying tack coat with hot bitumen carrying and spreading the stone ballast rolling with 8 to 10 Ton power road roller and finishing and spreading bitumen with required consistency, including fuel charges for heating of bitumen and hire and operational charges of all cost of material, T&P and labour charges and all other incidental charges complete as per Specification for finished item of work and as directed by the Engineer-in-Charge for the following Roads Lopudi-Yerravarigudem Road
3
-
22437
... More
Maintenance;Providing B.T. Patch work for pot holes using 9.5mm to 11.2mm IRC HBG machine crushed chips using 1.15 cum., per one cum. of compacted quantity and precoated with bitumen VG10 grade using a total quantity of 72 Kgs., and premixing the material of One cubic metre and flushing stone dust on top surface including all operational charges such as trimming the edges and removal of the loose materials cleaning the surface applying tack coat with hot bitumen carrying and spreading the stone ballast rolling with 8 to 10 Ton power road roller and finishing and spreading bitumen with required consistency, including fuel charges for heating of bitumen and hire and operational charges of all cost of material, T&P and labour charges and all other incidental charges complete as per Specification for finished item of work and as directed by the Engineer-in-Charge for the following Roads Nelapativarikunta to Tallavalli Road
2
-
14548
... More
Maintenance;Clearing Juliflora (prosafis) jungle from road side berms including uprooting and removing of juliflora stumps as directed by the Engineer-in-Charge
1000
-
4400
... More
Maintenance;Earth work excavation and depositing on bank with an initial lead of 10m and lift of 2m in loamy and clayey soils like black cotton soil red earth and ordinary gravel etc., including labour charges for breaking clods and sectioning etc., complete as directed by the Engineer-in-Chage of the work for filling low berms
100
-
3750
... More
Maintenance;Earth work excavation and depositing on bank with a initial lead of up to 0.50Km., in loamy and clayey soils like black cotton soil red earth and ordinary gravel etc., as per standard specification including breaking clods, sectioning watering and ramming etc., complete
90
-
12690
... More
Maintenance;Painting two coats with white cement of approved brand including cost and conveyance of all materials and all labour charges such as scraping and cleaning and all incidental charges etc., complete for finished item of work as directed by the Engineer-in-Charge for culvert parapets etc., complete
80
-
3320
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms.Tukkuuru-Koppaka Road
6
-
2202
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms. Gopavaram-Meerjapuram Road
10
-
3170
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms. Link Road to NE Road Via Gopavaram
6
-
1602
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms. Gogulampadu-Lopudi Road
5
-
1415
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms. Surepalli to Chekkapalli Road
15
-
4005
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms. Lopudi-Yerravarigudem Road
6
-
2202
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms. Nelapativarikunta to Tallavalli Road
5
-
2000
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms. Lopudi-Kothagudem Road
20
-
7000
... More
Maintenance;Providing Quarry Rubbish shoulders of irrespective thickness including cost of material and conveyance to site and labour charges for spreading quarry rubbish, sectioning including all operational charges etc., complete for finished item of work and as directed by the Engineer-in-Charge for the following Roads for filling low berms. Jangamgudem to Musunuru Police Station Road
20
-
7680
... More
Maintenance;Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berm and shoulders as per MORt&H Specification and as directed by the Engineer-in-Charge
1000
-
13700
... More
Maintenance;Providing JCB (Front end loader 1 cum capacity) to the used in monsoon season to remove wind fallen trees to give clearance to traffic and also to cutting and cleaning of side drains etc., complete for Gogulampadu-Lopudi Road
10
-
19830
... More
Maintenance;Engaging labour for the purpose of clearing of vent/litter/debris/fallen trees/earth slips etc., wherever and when ever necessary on the roads complete and as directed by the Engineer-in-Charge
20
-
10500
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements