Rajiv Gandhi University Of Knowledge Technologies Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Rajiv Gandhi University Of Knowledge Technologies - RGUKT Tender
Civil And Construction
Building Construction
Opening Date5 Sep 2022
Closing Date19 Sep 2022
Tender Amount₹ 16,00,621
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
541336Bid Award Id
ViewTender No
CT-09/Engg/2022-23Tender Authority
Rajiv Gandhi University Of Knowledge Technologies ViewPurchaser Address
-Website
http://http://www.rgukt.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Providing and fixing of ISI marked aluminium door handles (IS 208) 150mm long
340
-
27703
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Providing and fixing of ISI marked Aluminium Tower bolt-150mm long (IS 204)
170
-
20687
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Providing and fixing of ISI marked Aluminium butt hinges-100mm long
510
-
69809
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Providing and fixing of ISI marked Aluminium Aldrop-200mm long (IS 205)
170
-
49336
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)- Ground floor
46.62
-
16643
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)- First floor
61.74
-
24387
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)- Second floor
64.26
-
27825
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)- Third floor
41.58
-
19584
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Providing dadooing with glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge flushed to wall surface set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work Ground floor
46.62
-
29744
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Providing dadooing with glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge flushed to wall surface set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work First floor
61.74
-
40069
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Providing dadooing with glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge flushed to wall surface set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work Second floor
64.26
-
42412
REPLACEMENT OF DAMAGED TOILET DOORS AND FRAMES WITH PVC DOORS IN ACADEMIC BLOCKS AT RGUKT NUZVID;Providing dadooing with glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge flushed to wall surface set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work Third floor
41.58
-
27941
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements