Public Health And Municipal Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Public Health And Municipal Engineering Department - PHMED Tender

Building Construction
Opening Date7 Aug 2020
Closing Date26 Aug 2020
Tender Amount₹ 4,53,24,544 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Antitermite treatment as per IS 6315 (Part - 2) 2001 (Pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6315 (Part-2) 2001 and other relevant approved specification duly using Chlorpyriphos/ Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/ sqm of the vertical surface & @ 5.0 Liters/ sqm of the horizontal surface of the substructure to a depth of 500 mm around columns & 300 mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyance of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge for ground floor

433

-

146596.48

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) for ground floor

146

-

4000.4

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No. 402) for ground floor

173

-

632446.48

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) for ground floor

63

-

234325.79

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work for Footings(APSS No. 402 & 403) for ground floor

229.77

-

1844007.65

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work for plinth beams (APSS No. 402 & 403) for ground floor

48.59

-

510739.21

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work for pedestals (APSS No. 402 & 403) for ground floor

15.76

-

135346.09

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work for columns (APSS No. 402 & 403) for ground floor

66.26

-

716598.59

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For lintels for ground floor

1.5

-

16270.65

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc, shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For roof beams ground floor

56

-

590055.2

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc, shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For slab ground floor 175mm thick

169

-

235873.3

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc, shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for sun-shades of any width as per approved plan / design and of average thickness of 62.50mm ( thickness at support 75mm and thickness at edge 50mm) (APSS No. 402, 403) sun shades for ground floor

0.79

-

8569.21

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Brick masonry in c.m (1:6) prop.using 2nd class traditional size bricks of locally available size of 23x11x7 cm having a crushing strength not less than 35 kg/cm2 including cost and conveyance of materials to site,seigniorege fee,mixing of cement mortor to specified thickness watering curing,including all scaffolding hire operational charges of machinery,all labour charges and all water lead charges etc. complete for finished item of work for ground floor

89

-

490030.44

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Reinforced Brick Masonry 11.5cm (4 1/2") thick for partition walls in CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges complete for finished item of work. (APSS No. 501 & 504).for ground floor

243

-

1532792.97

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

3

-

14748.09

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and placing of the Design Mix Concrete (M25) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for external staircase for ground floor

3

-

23485.8

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) for ground floor

64

-

3775172.48

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) for ground floor

0.17

-

9148.94

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for ground floor

505.2

-

203590.55

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) for ground floor

824.74

-

339867.11

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering with CM(1:3) 12 mm thick including cost and conveyance of all materials and labour charges etc complete for finished item of work for ground floor

976

-

144106.4

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;colour washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials for ground floor

1116.11

-

70314.93

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site,sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). for ground floor

23.61

-

10501.96

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. for ground floor

23.66

-

19041.57

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Dadoing to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for ground floor

100.72

-

59881.97

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for ground floor

219.7

-

291320

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles of 8mm thick glossy finish premium colour length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for ground floor

20

-

23289.6

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For raisers and treads (APSS No.701 & 707) for ground floor

49

-

171108

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing cladding to walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. for ground floor

10.33

-

33541.51

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Suplly, delivery and fixing of 110mm PVC Pipe 4Kg/Sq.cm of standard make with ISI including cost and conveyance of pipe inserting in drain wall including all labour charges etc., for ground floor

50.4

-

25920.72

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flush type Doors with 35mm Thick Flush Shutters with Bondwood solied Block Board Type Faced on Both the sides with Commercial Type Plywood or teak wood (Schedule Item No. 301.)-1000x2100 mm for ground floor

14

-

142103.22

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of pre-painted steel openable windows base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized as per IS 277 , finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm section and for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading should be 18 x 25 mm with 5 mm thick plain float glass fitted with Ethyl propylene Diamine monomer Gasket (EPDM) and handle made of high grade aluminium powder coated with frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete for finished item of work .for ground floor

15.75

-

108690.44

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (base steel as per IS 513 of 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer with total coated thickness of 0.6mm. Section for louvered ventilator frame should be of 33x57mm. All the above closed and seamed sections should be made out of single sheet and with stitch at a single place as per enclosed drawings; The ventilators should be paneled with 4 mm pinhead glass with Ethyl propylene Diamine monomer Gasket (EPDM). The sections are to be cut to length mitre joined with corner bracket. Gaskets are to be made of Ethyl propylene Diamine monomer(EPDM). Corner brackets made of CRCA with Zinc Phosphate. The above frames should be fixed to the concrete /masonry wall by means of self expanding brackets & screws including 10 mm square guard bars with 6" pitch and all taxes complete for finished item of work.for ground floor

1.89

-

9246.45

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of MS grill Window of 1.5 X 1.35 mts by using 40 x40 x 6mm MS Angle section for outer frame and 10 mm square safety bars @ 100 mm C/C both ways including cost & conveyance of all materials and labour charges for finished item of work for ground floor

425.25

-

38208.71

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Painting to Walls with Two Coats of Emulsion Pant of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc.,sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.,complete for finished item of work in.(APSS No.912) for ground floor

2333.3

-

290962.51

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works over 2 or more coats of French spirit polish duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work for ground floor

38.85

-

3902.52

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of rolling shutter made of 80x125 mm machine rolled CRCA laths inter locked together through their entire length and jointed together at ends by end lockers mounted on specilly designed pipe shaft of 50mm dia nominal bore MS B-class pipe with brackets plate guiding channels,stoppers bottom lockening plates and arrangement for inside and out side locking with etc.completed for ground floor

10.5

-

38150.78

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing Gyp Board Fine Line Grid false ceiling (GS-FLC-4.6 as per India Gypsum) in size 600 mm x 600 mm using 12.5 mm thick/ 9.5 mm thick Gyp Board sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm conforming to IS 2095 - 1982 fixing to Gyp steel precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm Gypboard Sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm and finishing two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification. for ground floor

105.34

-

146854.49

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;First Floor

-

-

-

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work for columns (APSS No. 402 & 403) for first floor

51.89

-

592326.94

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For lintels for first floor

2.42

-

27484.18

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc, shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For roof beams first floor

56

-

613631.2

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc, shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For slab first floor 175mm thick

168.28

-

243972.34

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc, shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for sun-shades of any width as per approved plan / design and of average thickness of 62.50mm ( thickness at support 75mm and thickness at edge 50mm) (APSS No. 402, 403) for first floor

1.43

-

16240.65

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Brick masonry in c.m (1:6) prop.using 2nd class traditional size bricks of locally available size of 23x11x7 cm having a crushing strength not less than 35 kg/cm2 including cost and conveyance of materials to site,seigniorege fee,mixing of cement mortor to specified thickness watering curing,including all scaffolding hire operational charges of machinery,all labour charges and all water lead charges etc. complete for finished item of work for first floor

105.63

-

581594.55

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Reinforced Brick Masonry 11.5cm (4 1/2") thick for partition walls in CM (1:4) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges complete for finished item of work. (APSS No. 501 & 504).for first floor

423.37

-

2670529.05

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) for first floor

3.65

-

17943.51

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and placing of the Design Mix Concrete (M25) corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for internal staircase for first floor

1.08

-

10438.56

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) for first floor

28.34

-

1671398.63

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) for first floor

0.04

-

2127.66

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for first floor

766.97

-

309080.43

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) for first floor

1250.44

-

515294.64

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering with CM(1:3) 12 mm thick including cost and conveyance of all materials and labour charges etc complete for finished item of work for first floor

1041.31

-

153749.42

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site,sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). for first floor

28.04

-

12472.47

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. for first floor

28.04

-

22566.59

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Dadoing to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for first floor

108.72

-

64638.28

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For raisers (APSS No.701 & 707) for raisers and treads of internal staircase first floor

29.2

-

101966.4

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing cladding to walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work for first floor.

10.33

-

33541.51

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for first floor

1041.31

-

1380766.65

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles of 8mm thick glossy finish premium colour length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for first floor

42.72

-

49746.59

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of stainless steel hand railing as per approved drawing with top rail of 64mm dia (outer) 2mm thick pipe, vertical balusters of 50mm dia 2mm thick at 600mm c/c spacing (7 Nos)and 3 nos 25mm dia (outer) 1.6mm thick stainless steel pipes below top rail with equal spacings and 50mm wide 8mm thick SS plate for fixing vertical balusters at 600mm centre with 100x100mm stainless steel base plate to be fixed to the steps with Anchor fasteners. The rate should include providing and using bonding agent, drilling of 25mm holes of fixing railing , polishing of all nos of railing thouroughly and also including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges such as for fabrication of SS pipes, buffing, polishing etc., complete for finished item of work for first floor.

13.2

-

67033.22

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing and laying of cinder concrete in cement cinder mix (1 :15) prop. Using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyence of all materials, water to the work site, and all operational, incidental labour charges such as mixing cement & cinder etc. complete for finished item of work for first floor.

28.04

-

66653.88

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Suplly, delivery and fixing of 110mm PVC Pipe 4Kg/Sq.cm of standard make with ISI including cost and conveyance of pipe inserting in drain wall including all labour charges etc., for first floor

50.4

-

25920.72

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flush type Doors with 35mm Thick Flush Shutters with Bondwood solied Block Board Type Faced on Both the sides with Commercial Type Plywood or teak wood (Schedule Item No. 301.)-1000x2100 mm for first floor

14

-

142103.22

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of pre-painted steel openable windows base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized as per IS 277 , finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm section and for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading should be 18 x 25 mm with 5 mm thick plain float glass fitted with Ethyl propylene Diamine monomer Gasket (EPDM) and handle made of high grade aluminium powder coated with frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete for finished item of work .for first floor

15.75

-

108690.44

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (base steel as per IS 513 of 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer with total coated thickness of 0.6mm. Section for louvered ventilator frame should be of 33x57mm. All the above closed and seamed sections should be made out of single sheet and with stitch at a single place as per enclosed drawings; The ventilators should be paneled with 4 mm pinhead glass with Ethyl propylene Diamine monomer Gasket (EPDM). The sections are to be cut to length mitre joined with corner bracket. Gaskets are to be made of Ethyl propylene Diamine monomer(EPDM). Corner brackets made of CRCA with Zinc Phosphate. The above frames should be fixed to the concrete /masonry wall by means of self expanding brackets & screws including 10 mm square guard bars with 6" pitch and all taxes complete for finished item of work.for first floor

1.89

-

9246.45

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of MS grill Window of 1.5 X 1.35 mts by using 40 x40 x 6mm MS Angle section for outer frame and 10 mm square safety bars @ 100 mm C/C both ways including cost & conveyance of all materials and labour charges for finished item of work for first floor

911.25

-

81875.81

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Painting to Walls with Two Coats of Emulsion Pant of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc.,sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.,complete for finished item of work in.(APSS No.912) for first floor

3078.41

-

383877.73

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works over 2 or more coats of French spirit polish duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work for first floor

44.1

-

4429.89

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Second Floor

-

-

-

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For coloumns, Water tanks, Rcc walls in building for second floor.

49.71

-

597273.11

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels in building for second floor.

2.17

-

25748.57

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For beams in building for second floor.

83

-

944544.15

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For slab in building for second floor.

168.28

-

252849.11

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For for sun-shades of any width as per approved plan / design and of average thickness of 62.50mm ( thickness at support 75mm and thickness at edge 50mm) (APSS No. 402, 403) in building for second floor.

1.35

-

16018.7

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Brick masonry in c.m (1:6) prop.using 2nd class traditional size bricks of locally available size of 23x11x7 cm having a crushing strength not less than 35 kg/cm2 including cost and conveyance of materials to site,seigniorege fee,mixing of cement mortor to specified thickness watering curing,including all scaffolding hire operational charges of machinery,all labour charges and all water lead charges etc. complete for finished item of work for second floor

116.32

-

640453.27

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Reinforced Brick Masonry 11.5cm (4 1/2") thick for partition walls in CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges complete for finished item of work. (APSS No. 501 & 504).for second floor

175.44

-

1106638.68

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) for second floor

3.92

-

19270.84

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For internal staircase in building for second floor.

2.58

-

24897.9

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) for second floor

34.61

-

2041542.49

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) for second floor

0.04

-

1861.7

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for second floor

621.44

-

250434.11

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) for second floor

1216.64

-

501363.53

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering with CM(1:3) 12 mm thick including cost and conveyance of all materials and labour charges etc complete for finished item of work for second floor

1033.7

-

152625.81

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site,sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). for second floor

28.04

-

12472.47

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. for second floor

30.29

-

24377.39

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Dadoing to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for second floor

55.45

-

32967.24

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For raisers (APSS No.701 & 707) for raisers and treads of internal staircase second floor

29.2

-

101966.4

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing cladding to walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work for second floor.

11.9

-

38639.3

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for second floor

1033.65

-

1370609.56

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles of 8mm thick glossy finish premium colour length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for second floor

33.9

-

39475.87

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of stainless steel hand railing as per approved drawing with top rail of 64mm dia (outer) 2mm thick pipe, vertical balusters of 50mm dia 2mm thick at 600mm c/c spacing (7 Nos)and 3 nos 25mm dia (outer) 1.6mm thick stainless steel pipes below top rail with equal spacings and 50mm wide 8mm thick SS plate for fixing vertical balusters at 600mm centre with 100x100mm stainless steel base plate to be fixed to the steps with Anchor fasteners. The rate should include providing and using bonding agent, drilling of 25mm holes of fixing railing , polishing of all nos of railing thouroughly and also including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges such as for fabrication of SS pipes, buffing, polishing etc., complete for finished item of work for second floor.

15.2

-

77189.76

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Suplly, delivery and fixing of 110mm PVC Pipe 4Kg/Sq.cm of standard make with ISI including cost and conveyance of pipe inserting in drain wall including all labour charges etc., for second floor

56

-

28800.8

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flush type Doors with 35mm Thick Flush Shutters with Bondwood solied Block Board Type Faced on Both the sides with Commercial Type Plywood or teak wood (Schedule Item No. 301.)-1000x2100 mm for second floor

14

-

142103.22

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of pre-painted steel openable windows base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized as per IS 277 , finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm section and for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading should be 18 x 25 mm with 5 mm thick plain float glass fitted with Ethyl propylene Diamine monomer Gasket (EPDM) and handle made of high grade aluminium powder coated with frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete for finished item of work .for second floor

15.75

-

108690.44

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (base steel as per IS 513 of 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer with total coated thickness of 0.6mm. Section for louvered ventilator frame should be of 33x57mm. All the above closed and seamed sections should be made out of single sheet and with stitch at a single place as per enclosed drawings; The ventilators should be paneled with 4 mm pinhead glass with Ethyl propylene Diamine monomer Gasket (EPDM). The sections are to be cut to length mitre joined with corner bracket. Gaskets are to be made of Ethyl propylene Diamine monomer(EPDM). Corner brackets made of CRCA with Zinc Phosphate. The above frames should be fixed to the concrete /masonry wall by means of self expanding brackets & screws including 10 mm square guard bars with 6" pitch and all taxes complete for finished item of work.for second floor

1.89

-

9246.45

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of MS grill Window of 1.5 X 1.35 mts by using 40 x40 x 6mm MS Angle section for outer frame and 10 mm square safety bars @ 100 mm C/C both ways including cost & conveyance of all materials and labour charges for finished item of work for second floor

15

-

1347.75

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Painting to Walls with Two Coats of Emulsion Pant of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc.,sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.,complete for finished item of work in.(APSS No.912) for second floor

2895.36

-

361051.39

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works over 2 or more coats of French spirit polish duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work for second floor

37.8

-

3797.05

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Third Floor

-

-

-

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For coloumns , Water tanks, Rcc walls in building for third floor.

19.12

-

235187.47

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels in building for third floor.

1.17

-

14479.57

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For beams in building for third floor.

49

-

578249

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For slab in building for third floor 175mm thick

37.28

-

56015.06

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For for sun-shades of any width as per approved plan / design and of average thickness of 62.50mm ( thickness at support 75mm and thickness at edge 50mm) (APSS No. 402, 403) in building for third floor.

0.76

-

9405.53

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Brick masonry in c.m (1:6) prop.using 2nd class traditional size bricks of locally available size of 23x11x7 cm having a crushing strength not less than 35 kg/cm2 including cost and conveyance of materials to site,seigniorege fee,mixing of cement mortor to specified thickness watering curing,including all scaffolding hire operational charges of machinery,all labour charges and all water lead charges etc. complete for finished item of work for third floor

100.26

-

552027.55

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Reinforced Brick Masonry 11.5cm (4 1/2") thick for partition walls in CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges complete for finished item of work. (APSS No. 501 & 504).for third floor

191.92

-

1210591.06

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) for third floor

1.29

-

6341.68

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Vibrated Reinforced Cement Concrete M 30 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using HIRE CHARGES FOR CENTERING & SCAFFOLDING - for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For internal staircase in building for third floor.

2.58

-

24897.89

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) for third floor

13.72

-

809302.6

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) for third floor

0.04

-

1861.7

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for third floor

484.74

-

195345.37

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) for third floor

1019

-

419919.71

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering with CM(1:3) 12 mm thick including cost and conveyance of all materials and labour charges etc complete for finished item of work for third floor

442.6

-

65349.89

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site,sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). for third floor

28.04

-

12472.47

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. for third floor

30.29

-

24377.39

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing Dadoing to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for third floor

55.45

-

32967.19

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For raisers (APSS No.701 & 707) for raisers and treads of internal staircase third floor

29.2

-

101966.4

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing cladding to walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work for third floor.

11.9

-

38639.3

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for third floor

419.34

-

556040.65

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles of 8mm thick glossy finish premium colour length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials for third floor

33.9

-

39475.87

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of stainless steel hand railing as per approved drawing with top rail of 64mm dia (outer) 2mm thick pipe, vertical balusters of 50mm dia 2mm thick at 600mm c/c spacing (7 Nos)and 3 nos 25mm dia (outer) 1.6mm thick stainless steel pipes below top rail with equal spacings and 50mm wide 8mm thick SS plate for fixing vertical balusters at 600mm centre with 100x100mm stainless steel base plate to be fixed to the steps with Anchor fasteners. The rate should include providing and using bonding agent, drilling of 25mm holes of fixing railing , polishing of all nos of railing thouroughly and also including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges such as for fabrication of SS pipes, buffing, polishing etc., complete for finished item of work for third floor.

15.2

-

77189.76

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Suplly, delivery and fixing of 110mm PVC Pipe 4Kg/Sq.cm of standard make with ISI including cost and conveyance of pipe inserting in drain wall including all labour charges etc., for third floor

56

-

28800.8

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Flush type Doors with 35mm Thick Flush Shutters with Bondwood solied Block Board Type Faced on Both the sides with Commercial Type Plywood or teak wood (Schedule Item No. 301.)-1000x2100 mm for third floor

14

-

142103.22

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of pre-painted steel openable windows base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized as per IS 277 , finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm section and for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading should be 18 x 25 mm with 5 mm thick plain float glass fitted with Ethyl propylene Diamine monomer Gasket (EPDM) and handle made of high grade aluminium powder coated with frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete for finished item of work .for third floor

15.75

-

108690.44

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (base steel as per IS 513 of 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer with total coated thickness of 0.6mm. Section for louvered ventilator frame should be of 33x57mm. All the above closed and seamed sections should be made out of single sheet and with stitch at a single place as per enclosed drawings; The ventilators should be paneled with 4 mm pinhead glass with Ethyl propylene Diamine monomer Gasket (EPDM). The sections are to be cut to length mitre joined with corner bracket. Gaskets are to be made of Ethyl propylene Diamine monomer(EPDM). Corner brackets made of CRCA with Zinc Phosphate. The above frames should be fixed to the concrete /masonry wall by means of self expanding brackets & screws including 10 mm square guard bars with 6" pitch and all taxes complete for finished item of work.for third floor

1.89

-

9246.45

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of MS grill Window of 1.5 X 1.35 mts by using 40 x40 x 6mm MS Angle section for outer frame and 10 mm square safety bars @ 100 mm C/C both ways including cost & conveyance of all materials and labour charges for finished item of work for third floor

210

-

18868.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Painting to Walls with Two Coats of Emulsion Pant of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc.,sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.,complete for finished item of work in.(APSS No.912) for third floor

838.73

-

104589.63

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works over 2 or more coats of French spirit polish duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work for third floor

12.6

-

1265.67

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Compound Wall

-

-

-

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for compound wall

126.56

-

26819.33

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations for compound wall (APSS No. 402)

25.31

-

92527.29

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) for compound wall.

182.25

-

677871.59

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Brick masonry in c.m (1:6) prop.using 2nd class traditional size bricks of locally available size of 23x11x7 cm having a crushing strength not less than 35 kg/cm2 including cost and conveyance of materials to site,seigniorege fee,mixing of cement mortor to specified thickness watering curing,including all scaffolding hire operational charges of machinery,all labour charges and all water lead charges etc. complete for finished item of work for compound wall

83.95

-

462225.34

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) for compound wall

743.4

-

306347.71

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Painting to Walls with Two Coats of Emulsion Pant of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc.,sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.,complete for finished item of work in.(APSS No.912) for compound wall

743.4

-

92701.98

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of double leaf MS gate of size 5.0m x 2.50m as per drawing using 50mm x 50mm x 6mm MS angle alround and horizontally in the middle , 50mm x 10mm MS flats verticallt @ 90mm c/c , fixing ornamental flowers , arrows , MS hinges , aldrop as per the drawing including cost and conveyance of all materials , labour charges , welding charges , all incidental charges , painting with Zinc chromate yellow oxide iron primer , overheads & contractoers profi etc., complete for finished item of work for compound wall

225

-

20205

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Painting New Iron Work with two coats of ready mixed synthetic enamel Paint first quality all shades over and existing steel primer including cost and conveyance of all materials to site, Sales & Other taxes, incidental, Operational and all labour charges etc., complete for finished item of work .

18.75

-

2338.13

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Electrification Works

-

-

-

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of 20mm outer dia heavy (2.10mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

150

-

10296

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

400

-

25320

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) surface P.V.C. pipe with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Modi ( ISI mark).

500

-

56235

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of 25mm outer dia heavy (2.10mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for run of mains / circuit mains, power plugs,computer boards including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

500

-

38700

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of 32mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

60

-

4263.6

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Laying of P.V.C casing and caping (ISI MARK) with double locking arrangments with groover trunking of size not below 12.5mm height 25mm size with all accessories, duly sealed at points and erected on Wall / Ceiling including cost of all materials and labour charges complete. make: Modi with ISI

70

-

3269.7

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Laying of P.V.C casing and caping (ISI MARK) with double locking arrangments with groover trunking of size not below 12.5mm height 38/40 size with all accessories, duly sealed at points and erected on Wall / Ceiling including cost of all materials and labour charges complete.make Modi with ISI

60

-

4662.6

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of 25mm outer dia heavy PVC flexible pipe (ISI MARK) surface mounted with all required accessories fixing of chromium plated metallic base saddles including all labour charges etc., complete [ for run of mains,power plugs ,computer boards and AC circuits] Makes : Sudhakar / Modi ( ISI mark).

60

-

3619.8

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Module Hot Dip Galvanized modular type Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. ( One Point wiring controlled by one Switch ) Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge. Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

60

-

29528

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Module Hot Dip Galvanized modular type Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. ( 2 point wiring control by one switch ) Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge. Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

20

-

13342.33

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Module Hot Dip Galvanized modular type Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. ( 3 point wiring control by one switch ) Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge. Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

20

-

16842

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Module Hot Dip Galvanized modular type Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. ( 4 point wiring control by one switch ) Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge. Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

8

-

8136.67

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Module Hot Dip Galvanized modular type Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. (double hight/stairecase points ) Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge. Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

5

-

3691

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 2 of14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

70

-

2281.52

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

300

-

12141.93

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

300

-

16689.93

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 1 of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes:Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

500

-

8173.1

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 2 of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete.Makes:Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

250

-

21157.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 1 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for earth continuity inlcuding all labour charges etc., complete.Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

250

-

6966.55

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 2 of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete.Makes:Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

30

-

3566.7

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 1 of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for earth continuity inlcuding all labour charges etc., complete.Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

30

-

1152.79

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 2 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

15

-

2525.55

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 1 of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete.Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

15

-

833.34

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 4 of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete.Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

60

-

10155.6

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 4 of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete.Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

60

-

14266.8

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 4 of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable in existing pipe for mains including all labour charges etc., complete. Makes: :Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

60

-

20204.4

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board/Separate board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

60

-

22711.86

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ Power plug ] Modular Switch,socket,metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

15

-

8329.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch controls-2Nos duly recessed in wall with 6 Module Hot Dip Galvanized Modular Metal Box size covered with 6 Modular Cover Frame including earth connections and all labour charges etc., complete.[ For computer switch board]. Modular Switch,Socket,Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

60

-

43218

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without bulb (for new installation). BH Make: Anchor / Gold Medal Olive / Million Zoom.

10

-

646.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing Distribution board with 20A SP Plug and Socket with SS enclosure with 10/16/20A 10KA SP MCB, C/D Curve ISI Mark including internal connection and labour charges for surface / flush mounting etc., complete . Makes : Legrand / Schneider. MCB Make:Legrand-DX3 / Schneider-Acti9.

2

-

2790.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing Distribution board with 32A TP Plug and Socket with SS enclosure with 32A 10KA TP MCB, C/D Curve ISI Mark including internal connection and labour charges for surface / flush mounting etc., complete. Make. Legrand / Schneider. MCB Make:Legrand-DX3 / Schneider-Acti9.

1

-

3490.49

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing Distribution board with 63A TP Plug and Socket with SS enclosure with 63A 10KA TP MCB, C/D Curve ISI Mark including internal connection and labour charges for surface / flush mounting etc., complete. Make. Legrand / Schneider. MCB Make:Legrand-DX3 / Schneider-Acti9.

2

-

6980.98

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Top up box 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch controls-2Nos duly recessed in table/ floor with 6 Module Hot Dip Galvanized Modular Metal Box size covered with 6 Modular Cover Frame including earth connections and all labour charges etc., complete.[ For computer switch board]. Modular Switch,Socket,Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

10

-

9500

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of Telephone Cable cat -5 UTP cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes:D Link / AMP / Molex / Legrand / Krone.

100

-

3035.62

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Modular co-Axial socket type TV Antenna outlet on 2 moduler hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc. Complete. co-Axial socket type TV Antenna outlet, cover frame &metal box makes: GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge

2

-

475.06

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Modular socket type Telephone jack with Connector on 2 moduler hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc. Complete. Telephone jack with Connector, cover frame &metal box makes: GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge

30

-

7155.93

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of LAN Cable cat - 6 UTP cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes:D Link / AMP / Molex / Legrand / Krone.

100

-

3035.62

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate on 2 moduler hot dip galvanized metal box including giving connections, cost of all accessories and labour charges etc. Complete. I/O & duel face plate Makes: D Link / AMP / Molex / Legrand / Krone.Metal box make:Legrand / Schneider.

10

-

4285.31

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Top up box RJ-45 information outlets and Telephone jacks-1Nos duly recessed in table/ floor with 2/3 Module Modular Metal Box size covered with 2/3 Modular Cover Frame including earth connections and all labour charges etc., complete.[ For computer switch board]. Modular Switch,Socket,Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.D Link / AMP / Molex / Legrand / Krone.

8

-

6000

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 24 Port manageble switches including giving connections cost of all accessories and all labour charges etc., complete. Makes : CISCO / Net Gear / HP / D link.

2

-

10999.13

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 24 Port patch panel including giving connections cost of all accessories and all labour charges etc., complete. Makes : Makes: D Link / AMP / Molex / Legrand / Krone

2

-

11905.13

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 15U floor mounting net work rack with power spike including all accessories and giving all connections, labour charges etc., complete. Makes : HCL / Vall.

2

-

13979.34

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 9U floor/wall mounting net work rack with power spike including all accessories and giving all connections, labour charges etc., complete. Makes : HCL / Vall.

1

-

5387.67

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 6U floor/wall mounting net work rack with power spike including all accessories and giving all connections, labour charges etc., complete. Makes : HCL / Vall.

3

-

13769.01

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 100 pair MDF loaded with 2/10 Modular including all accessories and giving all connections, labour charges etc., complete.. Makes: Krone or its equivalent.

1

-

3665.67

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 100 Pair raiser cable for telephone in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: Finolex / Delton / Surabi / Polycab

30

-

10885.95

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 20 Pair telephone Copper wire.in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: Finolex / Delton / Surabi / Polycab

30

-

2425.95

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 50 Pair telephone Copper wire.in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: Finolex / Delton / Surabi / Polycab

30

-

5665.95

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 12 Core (Indoor / Out door), Single mode armourd, Optic fibre cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete Makes: D Link / AMP / Molex / Legrand / Krone.

30

-

3205.95

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 12 port fibre distribution unit. (FDU / LIU) loaded with couplers etc complete including all accessories and giving all connections, labour charges etc., complete.. Makes: D Link / AMP / Molex / Legrand / Krone.

1

-

8939.67

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 100mm x 38mm G I Raceways of 2mm thick with top cover and required hard ware etc complete.

30

-

12390

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 150mm x 38mm G I Raceways of 2mm thick with top cover and required hard ware etc complete.

30

-

16290

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and run of 300mm x 38mm G I Raceways of 2mm thick with top cover and required hard ware etc complete

20

-

18600

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 172mm x 52mm G.I. Junction box of 2mm thick for direct acces to cables at the inter section of Raceways.

10

-

3050

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 222mm x 52mm G.I. Junction box of 2mm thick for direct acces to cables at the inter section of Raceways.

5

-

1930

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 372mm x 52mm G.I. Junction box of 2mm thick for direct acces to cables at the inter section of Raceways.

5

-

3730

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and transportation of 20W, 2000 lumins, 1200mm length LED retrofit T8 tube light, input voltage AC 165 - 260 Volts with >0.9 PF with inbuilt driver and frosted cover etc., complete with 3 years warranty with PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs."Luminaire Make : Phillips / Osram / GE / Crompton / VIN / Bajaj / Havells / Halonix

20

-

19640

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and transportation of 2x20W, 2000 lumins, 1200mm length LED retrofit T8 tube light, input voltage AC 165 - 260 Volts with >0.9 PF with inbuilt driver and frosted cover etc., complete with 3 years warranty with PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs."Luminaire Make : Phillips / Osram / GE / Crompton / VIN / Bajaj / Havells / Halonix

5

-

17850

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Fixing of 20w LED tube light luminaire on wall / Ceiling with all accessories including giving connections and all labour charges etc., complete.

30

-

3469.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Transportation of 18W Down Lighter, Surface mounting made of diecast alluminium body with powder coating, acrylic diffuser with Driver, operating voltage range of 150 to 265 Volts AC, Power factor > 0.9 with LED's having efficacy of > 120 lumins/watt etc., complete with 3 years warranty with PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs."Luminaire Make : Phillips / GE / Crompton / VIN /Bajaj / Havells / Halonix.

15

-

72315

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Transportation of 18W Down Lighter, Recessed mounting made of diecast alluminium body with powder coating, acrylic diffuser with Driver, operating voltage range of 150 to 265 Volts AC, Power factor > 0.9 with LED's having efficacy of > 120 lumins/watt etc., complete with 3 years warranty with PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs."Luminaire Make : Phillips / GE / Crompton / VIN / Bajaj / Havells / Halonix.

25

-

120525

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Transportation of 35W Down Lighter, Recessed mounting made of diecast alluminium body with powder coating, acrylic diffuser with Driver, operating voltage range of 150 to 265 Volts AC, Power factor > 0.9 with LED's having efficacy of > 120 lumins/watt etc., complete with 3 years warranty with PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs."Luminaire Make : Phillips / GE / Crompton / VIN / Bajaj / Havells / Halonix.

2

-

12500

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Transportation of 45W slim LED panel of 600mm x 600mm made of alluminium body with acrylic diffuser, Constant current out put of Driver operating voltage range of 150 to 265 Volts AC, Power factor > 0.9 high power LEDs having efficacy of > 120 lumins/watt, junction temparature less than 85 degrees centigrade and THD is less than 12% etc., complete with 3 years warranty with PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. "Luminaire Make : Phillips / Osram / GE / Crompton /VIN / Bajaj / Havells / Halonix.

2

-

14960

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Transportation of 36W slim LED panel of 600mm x 600mm made of alluminium body with acrylic diffuser, Constant current out put of Driver operating voltage range of 150 to 265 Volts AC, Power factor > 0.9 high power LEDs having efficacy of > 120 lumins/watt, junction temparature less than 85 degrees centigrade and THD is less than 12% etc., complete with 3 years warranty with PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. "Luminaire Make : Phillips / Osram / GE / Crompton /VIN / Bajaj / Havells / Halonix.

30

-

107130

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and transportation of 60W LED Flood light Luminaire made of pressure diecast alluminium body with powder coated, having toughned glass cover input voltage range of 165 to 200 volts AC, power factor > 0.90, high power LED's having efficacy 120 lumines/watt and junction temprature < 85 degree centegrade of IP 65 with optics, total hormonic destortion less than 15% at 110 Volts AC, driver efficiency >90% etc., complete with 5 years warranty with PHILIPS LUMILEDS / CREE / NICHIA / OSRAM /SAMSUNG / LG LEDs. Luminaire Make : PHILIPS / GE / VIN / CROMPTON /BAJAJ / HALONIX / JSTC Solar

2

-

27500

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Fixing of/18W/36W/45W/60W led down light luminaire on wall / Ceiling with / TW /PVC round blocks with all accessories including giving connections and all labour charges etc., complete.

75

-

9580.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Bulk head fitting with cast Aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., complete with lamp. Makes : Bajaj / Crompton / Surya.

6

-

9332.51

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 48" (1200mm) Sweep 5 Star rated Ceiling Fan without Regulator. Makes : Crompton High Speed Decora / Orient Summer Crown

55

-

113266.45

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

55

-

21670

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

55

-

7895.53

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete etc., complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

15

-

37072.05

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete

15

-

8215.2

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of suspended MS rods with matching coulor paint and sutable clamps, nut and bolts for both ends for suspended light fittings, fans etc.

10

-

1500

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 12 Nos S.P.out goings and for 1 No 4 pole Incommer including internal connection and labour charges for flush mounting etc., complete.Incommer: 40A FP Isolator-1No. Outgoing: 10kA-6-32A SP MCBs - 12 NosDB Makes : Legrand / Schneider.Isolator Make: Legrand-DX3 / Schneider-Acti9.MCB ake:Legrand-DX3 / Schneider-Acti9.

5

-

31727.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 8 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 24 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 63A FP Isolator-1No. Outgoing: 10kA-6-32A SP MCBs - 24 Nos DB Makes : Legrand / Schneider. Isolator Make: Legrand-DX3 / Schneider-Acti9. MCB Make:Legrand-DX3 / Schneider-Acti9.

2

-

16737

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's -4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

3

-

67168.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of 4 Way VTPN DB suitable for accomodating 125A 4 Pole MCCB as incomer and 63A,10KA, TP MCBs-4 Nos as outgoing and with IP 43 Protection including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A,4P,25KA MCCB-1No. Outgoing: 63A, 10KA , TP MCB's - 2 Nos, 32A SP MCB - 10KA - 6 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

20861.5

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;supply and installation of 450MMX50mmX2mm thick GI perforated cable tray with cover along with required angle supports with coupler plates, anchor bolts and nuts etc., complete. And the tray should be fitted on wall/ceiling/ coridor etc., complete.

3

-

2337

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;supply and installation of 300MMX50mmX2mm thick GI perforated cable tray with cover along with required angle supports with coupler plates, anchor bolts and nuts etc., complete. And the tray should be fitted on wall/ceiling/ coridor etc., complete.

3

-

1980

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;supply and installation of 150MMX50mmX2mm thick GI perforated cable tray with cover along with required angle supports with coupler plates, anchor bolts and nuts etc., complete. And the tray should be fitted on wall/ceiling/ coridor etc., complete.

3

-

1104

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and installation of 15KVA / 312V DC on line UPS system IGBT based rectifier with input power factor correction 32 bit microprocessor based with isolation transformers double conversion, SNMP controls, LCD display, Pure sine wave out put, with auto static switch three phase input / Three phase output and modular structure for better thermal technology / cooling facility, with warranty up to three years.Makes: CONSUL / Power one / Numeric / Emerson.

1

-

339879

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Main PCC Panel Board: Fabrication ,Transportation , Supply, Installation, Testing and Commissioning of suitable size , plinth mounting indoor type LT Distribution panel of 14 guage CRCA sheet for termination of 3.5c x 300 sqmm alluminium cables with the following incorporated in the panel for Distributing the power supply .(The working drawings for panel board should be got approved by the Department before fabrication of Panel). Main incoming: 250 A FP 35 kA MCCB confirms to IS : 13947-2, IEC 60947-2 and BS-EN 60947 with micro processor based having over load , short circuit and earth fault protection -1No. Makes: siemens/Schneider.L&T 400A Alluminium Bus bar (40mmx10mmxSuitable lenght) - 4nos -Main Sleaves tape for bus bar R Y B N-required length Insulators for busbar fixing (panel type)-8 Nos Phase indicator lamps - 1set (L&T make) Extended earth terminals - 2nos with 40X6 mm G.I Strip - 1.8 Mtrs Current Transformer- 230/5A - 3 NosKAPPA make Multy function meter (400A) - Digital type ( conzerv/HPL Make) supply of MCB 6A - 3 Nos

1

-

188272.21

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;LT KIOSK: Fabrication ,Transportation , Supply, Installation, Testing and Commissioning of suitable size , plinth mounting outdoor type LT Distribution panel of 14 guage CRCA sheet for termination of 3.5c x 300 sqmm alluminium cables with the following incorporated in the panel for Distributing the power supply .(The working drawings for panel board should be got approved by the Department before fabrication of Panel). Main incoming: 250A FP 50 kA MCCB to IS : 13947-2, IEC 60947-2 and BS-EN 60947 with micro processor based having over load , short circuit and earth fault protection -1No. Makes: siemens/Schneider.L&T 500A Alluminium Bus bar (50mmx10mmxSuitable lenght) - 4nos -Main Sleaves tape for bus bar R Y B N-required length Insulators for busbar fixing (panel type)-8 Nos Phase indicator lamps - 1set (L&T make) Extended earth terminals - 2nos with 40X6 mm G.I Strip - 0.8 Mtrs

1

-

85000

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Polycab / Havells

45

-

33255

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Polycab / Havells

10

-

5320

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Polycab / Havells

60

-

23220

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Polycab / Havells

60

-

11400

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Polycab / Havells

60

-

7740

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 2.5 Sqmm 3 Core PVC insulated, 1100V grade Flexible cu cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Polycab / Havells

300

-

33000

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 4 Core x 2.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all taxes etc., complete of make Universal / Polycab / Finolex / Havells.

40

-

6600

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of 1 Core x 16Sqmm FRLS pvc copper cable as per IS. 7098 / Part-I / 1988 including all taxes etc., complete of make Universal / Polycab / Finolex / Havells.

40

-

2800

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for 70 Sqmm with brass washers and crimping type aluminium lugs confirming to I.S specifications for cable of 70 Sq.mm including nuts and bolts with connections.

8

-

3777.56

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of Single compression brass cable glands for 4 core XLPE armoured cable for 16 Sqmm with brass washers and crimping type aluminium lugs confirming to I.S specifications for cable of 16 Sq.mm including nuts and bolts with connections.

3

-

395.85

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for 300 Sqmm with brass washers and crimping type aluminium lugs confirming to I.S specifications for cable of 300 Sq.mm including nuts and bolts with connections.

2

-

2257.94

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for 240Sqmm with brass washers and crimping type aluminium lugs confirming to I.S specifications for cable of 300 Sq.mm including nuts and bolts with connections.

3

-

3386.91

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for 150 Sqmm with brass washers and crimping type aluminium lugs confirming to I.S specifications for cable of 150 Sq.mm including nuts and bolts with connections..

2

-

650.84

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for 120 Sqmm with brass washers and crimping type aluminium lugs confirming to I.S specifications for cable of 120 Sq.mm including nuts and bolts with connections.

2

-

617.08

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for 25 Sqmm to 50sqmm with brass washers and crimping type aluminium lugs confirming to I.S specifications for cable of 25Sq.mm including nuts and bolts with connections.

2

-

351.9

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

20

-

3500.2

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Earth work excavation of Trench in hard ground soil, laying of U.G cables from 70 sqmm to 400 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

20

-

6163.13

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Labour charges for run of U.G cable up to 50sqmm on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

60

-

2263.8

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Labour charges for run of U.G cable up to70&95sqmm on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

60

-

2339.4

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Labour charges for run of U.G cable up to120&185sqmm on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

25

-

1024.25

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Labour charges for run of U.G cable up to 240&300sqmm on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

20

-

885

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply, transportation and delivery at site of 3 Phase, 50 Hz 100kva oil immersed and naturally cooled, outdoor / Indoor type copper wound transformer designed and manufactured as per IS and 1st filling of oil as per IS 335 of 1993, connected delta on primary side and Star on secondary side with additional neutral brought out on load side, 1100V / (433V / 415V) with HV tapping + or - 2.5% contineously rated for full load and temporature rise not exceeding 50°C in oil and 55°C rise by th resistance of the winding after contineous run on full load rating complete with the following standard mountings. Makes: Kirloskar / PETE / Esennar / Servomax 1. Rated KVA : 100KVA 2. Service: Outdoor 3. Mounting : Plinth. 4. Copper wound : Double. 5. Type : Core. 6. Cooling : ONAN 7. Temp . Rise : 55°C. 8. Vector Group: Dyn 11 9. Primary Connection : Delta 10. Primary Volts : 11000 11. Primry Frequency : 50 12.Primary Phases : 3 13. Primary wires: 3 14. Secondary connection : Star 15. Secondary Volts : 415 / 433V 16. Secondary phases : 3 17. Secondary wires: 4, 18. Taps on primary winding for primary voltage variation : +7.5% to - 7.5% in steps of 2.5%, 22. Fittings & Accessories. a. Rating and terminal marking plate b. Earthing terminals c. Lifting Lugs d. Conservator with drain plug. e. Oil level Indicator f. Dehydrating silicagel breather g. Air release device h. Drain cum filter wall i. Explosion vent with diaphragm j. Radiators (Attachable) k. Seperate neutral bushing l. Uni directional flat roller 63KVA, 3 Phase, 415, 50Hz, 83BHP, water cooled multi cylinder diesel generator set with alternator of 63KVA out put continous rating at 0.8 p.f, and Batteries .A. Alternator : Kirloskar / Stamford / Crompton Greaves / Leroy Somer make. The alternator of the output rating shall be 3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self regulated, and shall confirm to IS: 13364 of 1992 with regulation of +5% from no load to full load. degree of protections shall be IP21. B.Diesel Engine : Kirloskar / Cummins / Mahindra & Mahindra Diesel Engine start, developing suitable 84 BHP output at 1500 RPM with mechanical /electronic governing so as to enable the alternator to give 63 KVA continuous output at 0.8 P.F. lagging at NTP conditions. The diesel engine shall be capable of providing 10% O/L for 1 Hr for every 11 Hrs of continuous running at full load. The engine with 1st filling of oil and Diesel etc. 01. Exhaust pipe of required size and length with insulation or clading. 02. Diesel tank suitable for 8 to 12 Hours running capacity. 03. Residential Silencer. 04. SMF Batteries with leads as per the Manufacturer standardsC. AMF Control Panel:- AMF control panel shall be fabricated with 16SWG CRCA sheet shall be totally enclosed with dust and Vermin proof, floor mounted / wall mounted type and shall be comprising the following.01. Voltmeter with selector switch.02. 4 Pole MCCB incomer of 125A rating of Schenieder / L&T make for EB and DG . 03. Ammeter with selector switch with CTs. 04. PF Meter and frequency Meter. 05. Indicator lamps (set Run, Load ON) with fuses. 06. KWH Meter of required rating. 07. Set of control fuses and current transformer. 08. Input Terminal board and output Terminal Board. 09. Battery charger with transformer rectifier unit. 10. Alternator supply air break contactor of L&T make.11. Main supply air break contactor of L&T make. 12. Audio Visual announciation .13. Main supply voltage set of control relays and timers with one mode selector switch, set of push buttons. 14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core

1

-

250000

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing independent earthing for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 40mm dia G.I Pipe of 0.3mtr. length connected with reducer providing G.I funnel with wiremesh as per National Electric Code including brick masonry (CM 1:3) Chamber of size 400m x 400m x 400mm covered with suitable cast iron Slab filling with salt and charcoal giving earth connection from electrode G.I strip of 25mm x 6mm x 200mm length with all accessories and labour charges complete as per IS specification 732/1982 (Part II).

5

-

53260.43

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in brick masonry (CM 1:3) Chamber of 400mmx 400m x 400mm with suitable cast iron cover duly providing staggered holes filling with salt and charcoal from the bottom of the pipe giving earth connection from electrode through G.I strip of 25 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

6

-

30852.52

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Run of 40mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete

20

-

2690.8

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete.

20

-

1836.8

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Run of 32mm x 6mm copper strip including cost of all accessories and labour charges etc., complete.

20

-

18826.62

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Run of 25mm x 3mm copper strip including cost of all accessories and labour charges etc., complete.

20

-

7597.38

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete.

20

-

307.28

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying of Pair of rubber hand gloves suitable for working on 11/22K

20

-

6280

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply of First Aid Box 18''X12''X8''

1

-

988

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing lift Facilities including all taxes and as directed by the Engineer - in - Charges

2

-

800000

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Water Supply & Sanitation

-

-

-

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work. 101.60mm dia upto 914.40mm (3') depth

40

-

18560

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work. 101.60mm dia upto 914.40mm (3') depth

50

-

38650

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 & 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as approved including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc., complete for finished item of work.

5

-

3090

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

5

-

21730

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

5

-

37025

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of 3" (76.2mm) multi floor trap with jali - UPVC/SWR pipe fittings (Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

17

-

1972

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick - ISI mark and providing masonry seat, CC squatting plate and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, angle stop cock 12.70mm dia. first quality Indian make heavy duty Seiko/Senior/Nice or equivalent, 12.70mm PVC connection with brass union nuts CP coated , 31.75mm brass plumber union, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges, overheads & contractors profit etc., complete for finished item of work.

15

-

76650

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice or equivalent complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty Seiko/Senior/Nice or equivalent, 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work

10

-

28610

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws etc., complete including cost and conveyance of all materials, labour charges for fixing , overheads & contractors profit for finished item of work in all floors

10

-

2820

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work in all floors.

10

-

6360

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with brackets and aluminium screws including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work.

10

-

2060

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing NP bib taps of size 12.70mm dia of Indian make heavy duty 400 grms as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit complete for finished item of work in all floors.

4

-

1224

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing Chrome plated bib cock cum health faucet with 1m long flexible tube and wall hook of Jaquar make queen series/Jupiter Aqua Lines-JAL-make Nira as approved by Engineer-In-Charge with 7 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges , overheads & contractor profit complete for finished item of work in all floors.

5

-

24770

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing white glazed flat back half stall urinals of size 590 mm x 375 mm x 390 mm with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges etc., overheads & contractors profit complete for finished item of work for all floors.

10

-

40530

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 4' 0" x 2' 0" for urinals including full rounding the edges , fixing in position, polishing, including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work for all floors.

5

-

9415

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes , white cement pointing including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work for all floors.

4

-

4064

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar /Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 75mm dia

60

-

11100

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar /Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 110mm dia

30

-

8190

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 15.90mm dia

15

-

2655

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.22.20 mm dia

50

-

10750

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.28.60mm dia

50

-

12900

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 34.90mm dia

20

-

7040

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 41.30 mm dia

50

-

21750

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 54.20 mm dia

20

-

12720

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.63.00 mm dia

30

-

23700

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Manufacture, supply, & delivery of HDPE pipes PE - 100 grade (6 Kgs/sqcm)conforming to IS 4984 - 1995 including transportation to any where in A.P, excluding excise duty, sale tax and specials including over heads and contractor profit etc., complete. ( Supply upto 90 mm dia in coil & above 90 mm dia straight length in 6 M.) 90mm OD

40

-

14280

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Manufacture, supply, & delivery of HDPE pipes PE - 100 grade (6 Kgs/sqcm)conforming to IS 4984 - 1995 including transportation to any where in A.P, excluding excise duty, sale tax and specials including over heads and contractor profit etc., complete. ( Supply upto 90 mm dia in coil & above 90 mm dia straight length in 6 M.) 63mm OD

25

-

4975

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing Gunmetal Gate (GM peet) valve as per IS-778 Class-I, Indian make heavy type including cost and conveyance of all materials , labour charges, overheads & contractors profit complete for finished item of work. 40mm nominal bore

3

-

8724

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing Gunmetal Gate (GM peet) valve as per IS-778 Class-I, Indian make heavy type including cost and conveyance of all materials , labour charges, overheads & contractors profit complete for finished item of work. 32mm nominal bore

6

-

12900

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supplying and fixing Gunmetal Gate (GM peet) valve as per IS-778 Class-I, Indian make heavy type including cost and conveyance of all materials , labour charges, overheads & contractors profit complete for finished item of work. 25mm nominal bore

1

-

1421

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Supply & fixing 2 1/2" (63.5mm) dia Sluice valve ISI mark with 2 Nos. flanges, 8 nos, 3/4" dia nuts & bolts and all necessary washers and packing materials including over heads and contractor profit etc., complete.

4

-

24632

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges, overheads & contractors profit complete for finished item of work for all floors.

25

-

2400

... More
Construction of B.C. Bhavan at Kondayapalem in BC hostel Premises in Division No.28;Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work.

10000

-

72700



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.