Public Health And Municipal Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Public Health And Municipal Engineering Department - PHMED Tender

Solid Waste Management
Transportation and Logistics
Opening Date5 Sep 2020
Closing Date28 Sep 2020
Tender Amount₹ 8,58,74,267 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Supply of 20 Cu.M Capacity MS Steel container suitable for lifting with Hook Loader from Transfer station Equipment container change over system with technical specifications inclusive of all taxes

10

-

11115200

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Designing, construction & erection of MS and Pre-fabricated Engineered building (PEB) combined fabricated superstructure designed as per relevent I.S. Code with a height of 12.00 m (eaves) above finished plinth level of 13.05m (Ridge) with adequate air turbine ventilator system, wall clading and roof sheeting 0.50 m, coloured coated galvalume profie sheet, MS Works with bracings, trusses, purlins, all primary members hot rolled with one coat red oxide primer and two coats synthetic super enamel paint, all secondary members cold formed with one coat of red oxide primer and two coats of enamel paint excluding entire sub-structure up to plinth level with footings, columns, pedestals, plinth beams with suitable foundation, PEB anchor bolts

900

-

3033000

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Construction of Ramp Area

-

-

-

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH by manual means

212.75

-

45083.85

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Plain Cement Concrete corresponding (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

22.13

-

80901.97

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Filling with sand in trenches sides of foundations and basement with intial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

18.13

-

10556.01

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Footings

111

-

650125.89

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Columns

18.72

-

147943.79

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Plinth Beam

23

-

191882.33

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Brick Masonry in Basement with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

46.64

-

256797.97

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Roof Beam

54

-

441941.94

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work RoofSlab 200 mm

88.4

-

545664.91

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work RCC Wall

37.44

-

295887.57

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

101.4

-

40863.19

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 912) in All Floors

101.4

-

12644.58

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

25813.61

-

1522670.11

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Construction of Machinery Shed Area 1st Floor

-

-

-

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges excluding dewatering charges etc., complete for Foundation of Building.(APSS No. 308) by manual means

186.61

-

39544.53

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Plain Cement Concrete corresponding (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

97.59

-

356765.62

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Filling with sand in trenches sides of foundations and basement with intial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

67.88

-

39522.45

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Footings

103.5

-

606198.47

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Columns

24.3

-

192039.98

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Plinth Beams

25.3

-

211070.56

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Brick Masonry in Basement with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

71.12

-

391583.88

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Roof Beams

59.4

-

486136.13

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Roof Slab 200 mm

102.15

-

630539.26

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work RCC Wall

21.78

-

172126.9

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

632.8

-

255012.07

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 912) in All Floors

632.8

-

78910.16

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

25884.17

-

1526907.19

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Construction of Machinery Shed Area Ground Floor

-

-

-

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges excluding dewatering charges etc., complete for Foundation of Building.(APSS No. 308) by manual means

58.77

-

12453.95

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Plain Cement Concrete corresponding (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

84.46

-

308765.49

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Filling with sand in trenches sides of foundations and basement with intial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

57.2

-

33304.13

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Footings

18

-

105425.82

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Pedestals

8

-

51355.76

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Plinth Beam

7.2

-

60067.51

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Brick Masonry in Basement with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

52.99

-

291760.82

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

460.8

-

185697.79

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 912) in All Floors

460.8

-

57461.76

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

20883

-

1231888.17

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Vibrated Reinforced Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work Grade Slab 150 mm Thick

102.15

-

720504.81

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Paving inside the compound

-

-

-

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Earthwork in excavation by Mechanical Meansas per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

750

-

73957.5

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Filling with stone crusher dust in the bottom layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

256.8

-

183085.56

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Supply and laying of precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non-traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification. Filling with 15cm thick sand for bedding. including all materials , T&P. complete for finished item of work.

1712

-

961801.6

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Construction of internal drain

-

-

-

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ( For Drain )

465.14

-

98567.82

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Filling with sand in the bottom layers not exceeding 15 cm thick, consolidating each deposited layer by ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) excluding seigniorage charges

35.78

-

20832.55

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Plain Cement Concrete (1:4:8) for under bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)

35.78

-

130803.09

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;R.C.C. grade M 30 Design Mix, using 20 mm Graded Metal (MORTH 12.8 G)

9.75

-

49776.68

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Supplying, fixing and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded

780

-

46012.2

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Laying of V.C.C (1:2:4) mix using Concrete mixer using 20 mm Graded Metal (MORD) including cost and conveyance and watering mixing curing and labour charges etc., complete as per S.S.

200.37

-

947112.92

... More
Construction of Garbage Transfer Station at Allipuram, Nellore;Providing Centring charges to drain walls including cost and conveyance of all materials, hire charges of m,s,sheets, scantling, planks and labour charges etc complete (Rate is for both sides of centering)

715.6

-

796770.51



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.