Public Health And Municipal Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Public Health And Municipal Engineering Department - PHMED Tender

Civil And Construction
Building Construction
Opening Date27 Sep 2022
Closing Date12 Oct 2022
Tender Amount₹ 1,66,98,297 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Conveyance of un-useful CC, RCCand dismantled materials to a distance of 2 Km in addition to the original mentioned lead in the original item for disposal including hire charges of T & P, labour Charges etc., complete for finished item of work.

242.02

-

19632.66

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH - Manual Means

510

-

135093.9

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Excavation in hard rock (blasting prohibited) with rock breakers including cost and conveyance of all materials, labour charges, all incidental and operational charges etc., complete, - Mechanical Means up to 3 m depth

300

-

825966

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Filling in foundation trenches with sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

520

-

386334

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Plain Cement Concrete (1:4:8) for bed using coarse aggregate 40 mm size graded hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing, laying concrete, ramming in 15 cm layers finishing top surface to the required level, curing etc., complete for finished item of work.

80

-

377741.6

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Supply and placing of the RCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.

-

-

-

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Foundations

198.75

-

2019198.64

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Pedastals

57.5

-

618556.83

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Plinth beam

75.33

-

962898.19

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Columns:

27.91

-

372156.96

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Supplying, fitting and placing HYSD bar reinforcement (Fe - 500) complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded

35669.9

-

3357964.39

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Brick Masonry in CM (1:6) with Bricks traditional size 23 x 11 x 7 cms 2nd class including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504)

231.01

-

1600247.85

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Plastering with CM (1:3), 12 mm thick inlcuding all materials to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work - For Walls:

1684.8

-

297535.68

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;First class Ornamental Plastering 1" to 1 1/4" Thick with base plastering of 1/2" to 3/4" in CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine rendering with neat cement including cost and conveyance of all materials, labour charges, all incidental and operational charges, curing etc., complete as directed by the authorities.

162

-

363362.76

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Painting , Priming coat on new plastered surface

1846.8

-

160597.73

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Painting to new walls with 2 coats of Synthetic polymer Luxury Plastic Emulsion paint of superior grade having VOC content less than 50 grams/litrf approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls

1846.8

-

389194.63

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;M.S. Ornamental Railing / Grills including cost & conveyance all materials ,fabrication, labour charges ,sales taxes a coat of red oxide primer etc complete. and as directed by the Departmental officers complete for finised item of work.

2350

-

291071

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Supplying and fixing of stainless steel hand railing as per approved drawing of 304 grade including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges etc., complete for finished item of work.

890

-

617206.1

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Construction of Ornamental Minors 4' base and 1'6" crown having base and crown of below mentioned size (Height of minar measure from bottom to top), Inlcuding cost of all materials like Cement, Sand, Steel, Grit, Binding wire, 6 inch electrical conduit, wiring, RBR Perimum Quality Flash and static LED lights, top Kalasam with crescent moon symbol, Scaffolding, transporation , Ornamental Plastering, Ornamental Painting 2 coats of approved quality, special labour for execution and technical support and all incidental charges if any., Complete as per the instructions od department and Darga Officials. complete for finished item of work.

220

-

1870000

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Supply, transportation & Fixing of 120W LED Flood light Luminaire made of pressure diecast alluminium housing with powder coated,having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's System efficacy >100lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), IK05, Driver surge protection 4KV, In house additional Surge protection = 10KV with wide/ Narrow beam optics, THD<10% at 110 Volts AC, driver efficiency >90%, , CCT: 3000K - 5700K, minimum CRI>70, etc., complete Makes : As per list of recommended brands as category I.

4

-

61001.52

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.

210

-

20577.9

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

100

-

65333

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Supply and fixing of 15 W LED Slim Panel Round /Square suitable for Recessed / Surface mounting made of diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltaGE-Venture ranGE-Venture of 150 to 265 Volts AC, P.F > 0.9, SurGE-Venture protection: 2KV,THD

12

-

13170.24

... More
Construction of Minars, Compound wall, Marble flooring all round widening of Barashaheed Dargah and;Flooring with polished marble slab (Such as Dongari/ Adanga/ Marodh/ Rajgangpur etc) 16 mm to 20 mm (average) thick ( 0.610 M width of any length) set over base coat of cement mortar (1:6) 20 mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.30 kgs per sqm. Jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

700

-

1647835



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.