Panchayat Raj Engineering Department Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Opening Date16 Jun 2023
Closing Date30 Jun 2023
Tender Amount₹ 26,74,320
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
634464Bid Award Id
ViewTender No
No.25/2023-24,Dt.10-05-2023Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
cost and supply of 200 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.
18
14675
815.33
... More
cost and supply of 160 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.
18
9345
519.22
... More
cost and supply of 140 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.
45
18072
401.61
... More
cost and supply of 110 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.
18
4405
244.76
... More
cost and supply of 90 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.
18
3033
168.55
... More
Repair to 315 mm dia PVC pipe lines including joints,specials as per requirement ,trench excavation by manual in all soils except rock requiring blasting,lowering,laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification ,watering and tampering and removing surpules earth from site work ,filling pipe line as per specification etc. complete The rates are inclusive of cost ,conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
5
41956
8391.24
... More
Repair to 250mm dia PVC pipe lines including joints,specials as per requirement ,trench excavation by manual in all soils except rock requiring blasting,lowering,laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification ,watering and tampering and removing surpules earth from site work ,filling pipe line as per specification etc. complete The rates are inclusive of cost ,conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
4
28229
7057.36
... More
Repair to 200 mm dia PVC pipe lines including joints,specials as per requirement ,trench excavation by manual in all soils except rock requiring blasting,lowering,laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification ,watering and tampering and removing surpules earth from site work ,filling pipe line as per specification etc. complete The rates are inclusive of cost ,conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
3
11234
3744.86
... More
Repair to 160mm dia PVC pipe lines including joints,specials as per requirement ,trench excavation by manual in all soils except rock requiring blasting,lowering,laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification ,watering and tampering and removing surpules earth from site work ,filling pipe line as per specification etc. complete The rates are inclusive of cost ,conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
6
18443
3073.98
... More
Repair to 140mm dia PVC pipe lines including joints,specials as per requirement ,trench excavation by manual in all soils except rock requiring blasting,lowering,laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification ,watering and tampering and removing surpules earth from site work ,filling pipe line as per specification etc. complete The rates are inclusive of cost ,conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
5
10824
2164.98
... More
Repair to 110mm dia PVC pipe lines including joints,specials as per requirement ,trench excavation by manual in all soils except rock requiring blasting,lowering,laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification ,watering and tampering and removing surpules earth from site work ,filling pipe line as per specification etc. complete The rates are inclusive of cost ,conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
3
5145
1715.22
... More
Repair to 90mm dia PVC pipe lines including joints,specials as per requirement ,trench excavation by manual in all soils except rock requiring blasting,lowering,laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification ,watering and tampering and removing surpules earth from site work ,filling pipe line as per specification etc. complete The rates are inclusive of cost ,conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
3
4664
1554.88
... More
(Rupees Twenty Six Lakhs Seventy Four Thousand Three Hundred Nineteen and paise Sixty Three only)
-
2674319
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements