Panchayat Raj Engineering Department Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Opening Date1 Apr 2025
Closing Date10 Apr 2025
Tender Amount₹ 3,04,671
Costs
EMD
₹ 3,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
797041Tender No
111/2024-25/Executive Engineer RWSS Division Paderu Dt.07.03.2025Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of PUMP HOUSE Earth work exavation and depositing on bank with an initial lead of 10m and 2m lift in loamy clavey soils including all labour and contractor profit @13.615%,CC (1:4:8) Using 40mm HBG metal including cost and conveyance of the all materials, Vabrated cement, M 30 Concrete using for bottom raft slab including cost and conveyance of all the materials but excluding the cost of the steel etc. completed side walls, Cement concrete (1:2:4) prop using 20mm gauge HG metal including cost and conveyance M20 garade of all materieals and labour charges, seing, charges etc. For cover slab -75, Accoproof plastering with CM (1:3), 12mm thick including cost, and supply and placing of the HYDS bars, fabrication including cost and conveyabce of all the materials
1
73584
73584
... More
Supply, delivery, installation and commissioning of Submercible Pump sets with 55LPM and head 98.82m(2 HP) 25 stage at Sump and suitable to Borewell And Pump set with 55LPM and head 98.8 m(2HP) at bore wellswith motor Single phase 2880 RPM, 415 volts of reputed make with minimum overall efficiency of 40% at the duty point with radial/mised flow with non-return valve including cost, conveynce of motor, pump set, panel board with necessary equipment along with required length of GI pipe medium class (B class) ISI marked, reputed make with "C" class couplings, bends, flanges etc with required lenght of 3 core PVC sheathed flat cable, required lenth of 7/18 copper wire and instailation and errection of all materials and all labour charges fixing as per the direction of the department officers etc. complete, including all required accessories but excluidng CED/GST etc complete.
1
72476
72476
... More
Construction of Name board mentioning all purticularss of the work with sub works Earth work in exacavation for foundation with CC(1:4:8),super structure with brick masonary in CM(1:6),plastering withCM(1:5) mix of 12 mm thick painting and lettering with acrylic emulsion including cost and conveyance of all materials and labour charges but excluding all taxes and seigniorages charges but including overheads and contractor profit 13.615%
1
6704
6704