To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Opening Date14 Apr 2025
Closing Soon28 Apr 2025
Tender Amount₹ 28,09,247 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cost and supply of 315 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

18

2044

36795.06

... More
Cost and supply of 200 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

18

778

14018.94

... More
Cost and supply of 160 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

12

496

5960.76

... More
Cost and supply of 140 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

12

384

4609.68

... More
Cost and supply of 125 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

6

298

1790.7

... More
Cost and supply of 110 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

24

233

5610.24

... More
Cost and supply of 90 mm dia PVC Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

36

160

5794.92

... More
Cost and supply of 160 mm dia HDPE Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

6

698

4192.56

... More
Cost and supply of 140 mm dia HDPE Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

6

532

3197.1

... More
Cost and supply of 110 mm dia HDPE Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

6

333

2002.74

... More
Cost and supply of 90 mm dia HDPE Pipes 6Kg/cm2 excluding all taxes and conveyance charges etc complete.

24

219

5268.72

... More
Repair to 315 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

5

8621

43109.5

... More
Repair to 200 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

5

4141

20708.5

... More
Repair to 160 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

3

3613

10840.2

... More
Repair to 140 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

4

2478

9912

... More
Repair to 125 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

2

2170

4341.4

... More
Repair to 110 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

7

2137

14963.9

... More
Repair to 90 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

13

1488

19350.5

... More
Repair to 160 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

2

4178

8356.96

... More
Repair to 140 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

3

3102

9306.3

... More
Repair to 110 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

4

2541

10166.08

... More
Repair to 90 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

7

1825

12779.76

... More
Rewinding charges of 10 HP Mono Block pump set including cost of copper wire, spares, accessories, rewinding charges, foundry charges, reerrection etc. complete.

5

11563

57815.5

... More
Rewinding charges of 7.5 HP Submersible pump set including cost of copper wire, spares, accessories, rewinding charges, foundry charges, reerrection etc. complete.

2

7771

15542.54

... More
Labour charges for cleaning of sumps / GLBR including cleaning, removal of algae, clacinations, sludge, dirt deposition from side walls and bottom portion of the container by desinfection with bleaching powder with all necessary tools, plants, including labour charges and cost of materials etc. complete.

6240

20

12480

... More
(Rupees Twenty Eight Lakhs Nine Thousand Two Hundred Forty Six and Paise Sixty Four Only)

-

-

2809246.64



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.