Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Opening Date18 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 6,20,147 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Pipeline for water supply with PVC pipes as per IS 4985-1988 with its amendments and revisions there on including supply of pipes, specials as per requirements, trench excavation for pipelines in all soils except Rock Required blasting by 2/3 machinery and 1/3 manually and depositing on bank with an initial lead and lift in all soils for pipeline trench of size 0.70 x 1.00 m including setting out, bracing, removal of stumps and other deleterious material and disposal upto a lead of 50M, dressing of sides and bottom, lowering, laying and jointing of 140mm dia PVC 6Kg/Cm2 Pipe pipelines true to alignment and gradient and refilling trenches with excavated earth (other than rock soils) with watering and removing surplus earth from the site of work and filling pipeline with water and testing etc., complete, the rates inclusive of cost and conveyance of all materials and labour charges including turnover taxes for finished item of pipeline work but excluding CED etc., complete including Over Heads & Contractors Profit @ 13.615%.

60

288

17339

... More
Construction of Pipeline for water supply with PVC pipes as per IS 4985-1988 with its amendments and revisions there on including supply of pipes, specials as per requirements, trench excavation for pipelines in all soils except Rock Required blasting by 2/3 machinery and 1/3 manually and depositing on bank with an initial lead and lift in all soils for pipeline trench of size 0.70 x 1.00 m including setting out, bracing, removal of stumps and other deleterious material and disposal upto a lead of 50M, dressing of sides and bottom, lowering, laying and jointing of 110mm dia PVC 6Kg/Cm2 Pipe pipelines true to alignment and gradient and refilling trenches with excavated earth (other than rock soils) with watering and removing surplus earth from the site of work and filling pipeline with water and testing etc., complete, the rates inclusive of cost and conveyance of all materials and labour charges including turnover taxes for finished item of pipeline work but excluding CED etc., complete including Over Heads & Contractors Profit @ 13.615%.

36

327

11799

... More
Construction of Pipeline for water supply with PVC pipes as per IS 4985-1988 with its amendments and revisions there on including supply of pipes, specials as per requirements, trench excavation for pipelines in all soils except Rock Required blasting by 2/3 machinery and 1/3 manually and depositing on bank with an initial lead and lift in all soils for pipeline trench of size 0.70 x 1.00 m including setting out, bracing, removal of stumps and other deleterious material and disposal upto a lead of 50M, dressing of sides and bottom, lowering, laying and jointing of 75mm dia PVC 6Kg/Cm2 Pipe pipelines true to alignment and gradient and refilling trenches with excavated earth (other than rock soils) with watering and removing surplus earth from the site of work and filling pipeline with water and testing etc., complete, the rates inclusive of cost and conveyance of all materials and labour charges including turnover taxes for finished item of pipeline work but excluding CED etc., complete including Over Heads & Contractors Profit @ 13.615%.

60

311

18667

... More
Labour charges for Leakage in the existing 140mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.

60

396

23760

... More
Labour charges for Leakage in the existing 90mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.

54

166

8964

... More
Labour charges for Leakage in the existing 110mm dia 6Kg/cm2 HDPE Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.

36

342

12312

... More
Labour charges for Leakage in the existing 75mm dia 6Kg/cm2 HDPE Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.

60

115

6900

... More
Removal and Re-errection charges of 7.5HP & 3.00 HP /Three phase Monoblock Pumpset with all accessories in to the existing source including testing and conducting trail run and all labour charges etc.complete for finished item of work.

6

2950

17700

... More
Rewinding of 10HP/Three phase Submersible Pumpset including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc.complete for finished item of work - at 7.50 HP Open Well Submersible Pumpset

2

3900

7800

... More
Rewinding of 10HP/Three phase Submersible Pumpset including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc.complete for finished item of work - at 3.00 HP Open Well Submersible Pumpset

2

2550

5100

... More
(12 - Items) -------- Total : Rs.

-

-

620147



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.