Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Eprocure
Opening Date13 Feb 2019
Closing Date18 Mar 2019
Tender Amount₹ 31,44,87,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

12750

-

17.49

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

12600

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

3496.18

-

1351.75

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

3363.52

-

1997.49

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

20243.25

-

40.83

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

20243.25

-

8.63

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

506.07

-

6767.26

... More
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

3825

-

303.43

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, applying debonding strips, primer, sealant, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.25 mts joint spacing)

344.26

-

5032.88

... More
1000 mm dia I Row RCC pie culverts 14 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

415.8

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

93.24

-

315.85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

78.12

-

3281.79

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

235.34

-

4193.38

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

105

-

6677.02

... More
Construction of two vent 6 m Span RCC Deck Slab Culvert- 1 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding VAT & Seignorage Charges above water level upto 3.0 m depth

489

-

85.78

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding VAT & Seignorage Charges below water level upto 3.0 m depth

2838.99

-

90.07

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for Leveling Coarse

99.42

-

3281.79

... More
Providing concrete for plain concrete M15 ( Design mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for Foundations (cut off walls )

38.65

-

4193.38

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel - For rafts, foundations

90.47

-

4709

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel - For footings of abutments

85.62

-

4830.58

... More
Providing concrete for plain concrete M15 ( Design mix) using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for body ramp wall

560

-

4193.38

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel - For abutments

194.48

-

4830.58

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel for bed blocks

3.4

-

4984.8

... More
V.R.C.C concrete M - 25grade for Super Structure with 20 mm(SS5)HBG M/C graded metal with a cube strength of 25 N / mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating centering machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding VAT & Seignorage Charges for deck slab

35.61

-

5713.98

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding VAT & Seignorage Charges

5.58

-

5001.24

... More
Providing concrete for plain concrete M15 ( Design mix) using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for Foundations for levelling course below apporach slab

5.78

-

4193.38

... More
Providing M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding VAT & Seignorage Charges For approach slab

5.78

-

4888.36

... More
Providing concrete for plain/reinforced concrete V.C.C grade M 20 (Design Mix) in Sub structure using 40 to 10 mm size Graded HBG aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause1500, 1700 & 2200 MORTH including contractors profit & Over head charges but excluding Seigonarage charges & VAT for side walls of the bridge

10.85

-

4830.58

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH ,including overhead charges and contractors profit but excluding VAT & Seignorage Charges

264.06

-

1294.93

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH

21

-

678.63

... More
Providing and laying boulder appron for bed protection with stone boulders of Size 500mm dia and weight not less than 100 kgs per each stone laid dry complete as per drawing and technical specifications clause 1301 including contractors profit & Over head charges but excluding Seigonarage charges & VAT

106.64

-

1305.8

... More
Supplying, fitting, and placing HYSD bar reinforcement in foundations complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.- For foundations

6.17

-

53363.83

... More
Supplying, fitting, and placing HYSD bar reinforcement in foundations complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.- For sub structure

3.2

-

53548.79

... More
Supplying, fitting, and placing HYSD bar reinforcement in foundations complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.- For super structure

8

-

54865.59

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

564

-

184.6

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight MORD ,including overhead charges and contractors profit .

18.62

-

71.72

... More
Construction of Retaining Wall

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit etc. complete

288

-

85.78

... More
Filling in foundation trenches using sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH , including overhead charges & Contractors profit etc. complete

72

-

315.85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH , including overhead charges & Contractors profit etc. complete

48

-

3281.79

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges. including overhead charges & Contractors profit etc. complete

270

-

4193.38

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

450

-

184.6

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding GST and seignorage charges etc. complete

220

-

678.63

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of 5 th kilometre stones of size 350x250x1675 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

3382.11

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size C

7

-

2005.12

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

25

-

560.52

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

10

-

1927.61

... More
Cautionary warning signs::Like Y Junction,cross road,T-intersection,T-Intersection major road a head,Left hand ,Right hand ,reverse curves,built up area,school ahead,pedastrain crossings,Dangerous dip,Speed breaker,schools etc- Equilateral traiangle of size 600 mm

22

-

1508.1

... More
Cautionary warning signs::Like Y Junction,cross road,T-intersection,T-Intersection major road a head,Left hand ,Right hand ,reverse curves,built up area,school ahead,pedastrain crossings,Dangerous dip,Speed breaker,schools etc- Rectangular of size 800x600 mm

1

-

1686.44

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3237.96

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

3.24

-

1621.06

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1278

-

702

... More
Construction of Speed breaker with Cement concrete pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. -

2.26

-

5032.88

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. - WMM

6.47

-

1997.49

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. - prime coat+tack coat

11.25

-

49.46

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. - SDBC 25 mm thick layer

0.21

-

6767.26

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

12

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

8

-

3210

... More
Bridge part

-

-

-

... More
FOUNDATIONS

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

876.34

-

85.78

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications 1204.7 & 1204.13 of MORD and 1100 & 1700 MORTH and removal of excavated earth with all lifts and lead upto 1000 m, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-100 mm dia

333

-

9038.3

... More
Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Staining of Wells including Fabricating and Setting out as per Detailed Drawing as per Tech. Specifications 1204.7.3 of MORD and 1200 & 1900 MORTH, including contractors profit & Over head charges, excluding GST etc, complete

60

-

63520.8

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

65.4

-

3994.4

... More
Reinforced cement concrete M30 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1205 MORD and 1500, 1700 & 1211 MORTH, including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete For Well Cap

298.59

-

4918.2

... More
Substructure &Super structure

-

-

-

... More
Providing concrete for Plain cement concrete M20 (Design Mix) using 40 mm Graded hard stone metal in Substructure complete as per drawings and technical specifications Clause 802, 804,805,806,807, 1202 & 1204 of MORD and 1500,1700&2200 of MORTH for substructure - abutments

101.89

-

4830.58

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges & Contractors profit upto 5m height. FOR PIERS, HAMMER HEAD, PIER CAP, ABUTMENT CAP

304.28

-

5209

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in superstructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges & Contractors profit, VAT upto 5m to 10 mt height. as per MOT DRG No.BD/13-76,BD/14-76A,BD/15-76A excluding cost of steel.- For slab

77

-

5713.98

... More
Providing and laying cement concrete wearing course M30 grade desin mix using 20 & 10 mm HBG Metal including cost, and conveyance of all materials to site and all labour charge mechanically mixed using 0.075 t/Cum reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD including contractors profit & Over head charges but excluding cost of Steel for wearing coat

9.6

-

5001.24

... More
Providing reinforced concrete Reinforced Cement Concrete M 30 grade ( Design Mix) approach slab using 0.05 tones/cum reinforcement and formwork complete as per drawing and technical specifications Clauses1500, 1600, 1700 & 2704 MORTH including contractors profit & Over head charges but excluding cost of Steel for approach slab

19.27

-

4888.36

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Ssuper Structures

15

-

54865.59

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

8

-

53548.79

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1001 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Foundation

25

-

53363.83

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD.including contractors profit & Over head charges , Seigonarage charges & VAT (DRAWG BD/5-09)

34.14

-

675.8

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Protection Work

36

-

1294.93

... More
Providing and laying pitching on slopes laid over prepared filter media/ gravel backing as per drawing and technical specifications Clause 1302 MORD / 2504 MORTH including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

18

-

1294.93

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORDincluding contractors profit & Over head charges , Seigonarage charges & VAT

583.48

-

678.63

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD including contractors profit & Over head charges , Seigonarage charges & VAT

56.93

-

1305.8

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe 6 Kg/Cm2 extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD including contractors profit & Over head charges , Seigonarage charges & VAT

60

-

184.6

... More
Drainage spouts complete as per drawing and technical specification and as per approved drg no.BD/1-69A as morth specification

12

-

1450

... More
Supply and fixing of of elastomeric neoprene bearing confirming to IRC-83 of bearing size 630x220x61 mm

6

-

6500

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares

70

-

6677.02

... More
Construction of approaches to Bridge

-

-

-

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with Vibratory Roller 80 - 100 kN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges but excluding , Seigonarage charges & VAT

1200

-

161.77

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

30.38

-

1351.75

... More
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

14.06

-

303.43

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

29.26

-

1997.49

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

187.55

-

40.83

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

187.5

-

8.63

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

187.5

-

6767.26

... More
Protection work

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD including contractors profit & Over head charges but excluding , Seigonarage charges & VAT For fdn. Of toe wall

294

-

85.78

... More
Providing concrete for plain/reinforced concrete P.C.C grade M 10 in open foundations using 40 mm nominal size Graded HBG stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including cost, and conveyance of all materials to site and all labour charge including contractors profit & Over head

63

-

3281.79

... More
Reinforced cement concrete M20 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

282.5

-

4709

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Protection Work

180

-

1294.93

... More
Providing and laying pitching on slopes laid over prepared filter media/ gravel backing as per drawing and technical specifications Clause 1302 MORD / 2504 MORTH including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

90

-

1294.93

... More
39.Construction of Road from Makkuva-Sambara PR road @ 3/2 KM to Thotavalasa in Makkuva mandal of Vizianagaram district

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

3600

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

2000

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

1256.58

-

1223.94

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

1211.58

-

1855.83

... More
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

1125

-

245.43

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

7777.2

-

40.87

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

7777.2

-

8.65

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

194.43

-

6616.36

... More
Construction of Single Row 1000 mm dia RCC Pipe Culverts - 4 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

118.8

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

26.64

-

207.25

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

22.32

-

3097.2

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

61.8

-

4001.43

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

30

-

6657.18

... More
Construction of Retaining Wall - 1 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

86.4

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

21.6

-

207.25

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

14.4

-

3097.2

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

81

-

4001.43

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

450

-

224.81

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges

66

-

534.04

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

3

-

1953.42

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

8

-

551.32

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

10

-

1903.43

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

18

-

1811.15

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for triangle of size 800X600 mm

1

-

2086.73

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3026.61

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1594.18

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

416

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

4.31

-

1855.83

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat + Tack Coat)

75

-

49.52

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

1.43

-

6616.36

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

12

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

2

-

3210

... More
Name of work:-Construction of road from Makkuva- Saluru R&B Road at 17/6 Km to SH36 Road at 9/8Km to A.Venkampeta in Makkuva Mandal of Vizianagaram District

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

8100

-

1.82

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD/305 MORTH including overhead charges & Contractor profit, but excluding GSTand Seignorage charges etc., complete for finished item of work.

9000

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

2814.75

-

1316.81

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

2713.5

-

1958.77

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

17415

-

40.82

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

17415

-

8.63

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

435.38

-

6723.42

... More
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

2531.25

-

222.23

... More
1000 mm dia 1 Row RCC pipe culverts - 10 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

297

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

66.6

-

207.25

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

55.8

-

3166.86

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

155.85

-

4073.86

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 600 mm dia RCC pipes

75

-

6623.17

... More
Construction of 3m slab culvert-3nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

338.7

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

60.66

-

3166.86

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

204.75

-

4073.86

... More
Providing plain concrete for M 15 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seigniorage Charges ,Cost of Steel etc. complete for finished item of work

211.79

-

4704.14

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST and seignorage charges and cost of Steel etc. complete for finished item of work.

11.7

-

4858.36

... More
V.R.C.C concrete M - 25grade for Super Structure with 20 mm(SS5)HBG M/C graded metal with a cube strength of 25 N / mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating centering machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding GST & Seignorage Charges

24.3

-

5576.04

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.

4.8

-

54865.59

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH

150

-

506.2

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

90

-

224.81

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size C

4

-

1972.93

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

18

-

554.79

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

3

-

1912.55

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

25

-

1820.27

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3038.79

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1604.32

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

921.6

-

702

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete.(WMM)

0.22

-

1958.77

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete.(Prime Coat+Tack Coat)

3.76

-

49.45

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete.(SDBC 25mm)

0.07

-

6723.42

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

16

-

316

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3mm thick corrugated sheet metal rail, 70cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5mm spaced 2m centre to centre, 1.8m high, 1.1m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fix vertical post with a spacer of channel section 150 x 75 x 5mm, 330mm long complete as per clause 810 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

40

-

2440.36

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

52

-

3210

... More
41. Construction of Road from Makkuva-Sambara PR Road at 1/2 to Antivalasa in Makkuva Mandal

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

1440

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

1600

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

502.2

-

1223.94

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

484.2

-

1855.83

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

3108

-

40.84

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

3108

-

8.63

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

77.7

-

6612.89

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

450

-

222.23

... More
Construction of Single Row 1000 mm dia RCC Pipe Culverts - 2 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

59.4

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

13.32

-

207.25

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

11.16

-

3097.2

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

33.62

-

4001.43

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

15

-

6736.55

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

1953.42

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

4

-

551.32

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

4

-

1903.43

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

9

-

1811.15

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Rectangle of size 800x600 mm

1

-

2086.73

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3026.61

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

0.54

-

1594.18

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

169

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

4.31

-

1855.83

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat+Tack Coat)

75

-

49.47

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

1.43

-

6612.89

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

6

-

3210

... More
Name of work:- "Construction of Road from Dabbagedda to D.Sirlam in Makkuva Mandal" of Vizianagaram District - DPR/Estimate Amount. Rs.354.00 lakhs

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

11880

-

1.82

... More
Scarifying existing granular surface to a depth of 50 mm and spreading scarified material in uniform layers with tractor grader and compacting with vibratary roller to achieve desired density as as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

13125

-

21.44

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

13200

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

1945.62

-

1279.62

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

3985.74

-

1917.55

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

25581.6

-

40.86

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

25581.6

-

8.65

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

639.54

-

6682.88

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

3712.5

-

291.83

... More
1000 mm dia RCC pie culverts - 12 No.s

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

356.4

-

85.78

... More
Filling in foundation trenches using sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit etc. complete

79.92

-

195.65

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

43.8

-

3133.74

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

187.03

-

4039.4

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 600 mm dia RCC pipes

90

-

6691.14

... More
3.00 Mt. Span Slab culvert - 3 No.s

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST & Seignorage Charges

240.78

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

46.56

-

3133.74

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations

204.75

-

4039.4

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations

211.8

-

4039.4

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges ,Cost of Steel

11.31

-

4962.93

... More
VRCC concrete M-25grade for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding GST and seignorage charges for finished item of work.

24.3

-

5536.3

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST and seigniorage charges - For Super Structures

4.8

-

49449.78

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including cost, all labour charges for all operations excluding GST etc complete for finished item of work.

90

-

224.79

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,excluding GST & Seignorage Charges

150

-

688.24

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of 5 th kilometre stones of size 350x250x1675 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

3321.81

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

6

-

1963.65

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

27

-

553.14

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

10

-

1908.21

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

43

-

1815.93

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Facility information signs::Like eating place,resting place,first aid post,toilet,filling station,hospital,public phone,police station. Rectangular of size 800x600 mm

1

-

2091.52

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3033

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

2.16

-

1439.55

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1329

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

0.63

-

1917.55

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime cost+Tack coat)

11.26

-

49.51

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC 25mm thick)

0.29

-

6682.88

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

48

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

62

-

3210

... More
43 Construction of Road from Makkuva-Duggeru R&B Road to Saraivalasa in Makkuva Mandal

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

1800

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

2000

-

68.36

... More
Construction of Improved Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

562.5

-

245.43

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

649.08

-

1223.94

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

626.58

-

1855.83

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

4027.2

-

40.87

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

4027.2

-

8.65

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

100.68

-

6616.36

... More
Construction of Single Row 1000 mm dia RCC Pipe Culverts - 3No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

89.1

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

19.98

-

207.25

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

16.74

-

3097.2

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

46.74

-

4001.43

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

22.5

-

6657.18

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

2

-

1953.42

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

4

-

551.32

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

6

-

1903.43

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

9

-

1811.15

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3026.61

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1594.18

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

209

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

4.31

-

1855.83

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat+Tack Coat)

75

-

49.52

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

1.43

-

6616.36

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

5

-

3210

... More
44. Construction of Road from Makkuva-Gopalapuram R&B Road to Bangaruvalasa in Makkuva Mandal

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

4500

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

5000

-

68.36

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

1406

-

210.63

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

1560.33

-

1223.94

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

1504.08

-

1855.83

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

9652.2

-

40.86

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

9652.2

-

8.65

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

241.31

-

6615.06

... More
Construction of Single Row 1000 mm dia RCC Pipe Culverts - 4 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

118.8

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

26.64

-

207.25

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

22.32

-

3097.2

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

62.36

-

4001.43

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

30

-

6657.18

... More
Retaining wall

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

216

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

54

-

207.25

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

36

-

3097.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractor profit but excluding GST & Seignorage Charges

202.5

-

4001.43

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

450

-

224.81

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges

120

-

492.28

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

3

-

1953.42

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

10

-

551.32

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

10

-

1903.43

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

33

-

1811.15

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Rectangle of size 800x600 mm

1

-

2086.73

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3026.61

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

2.16

-

1594.18

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

509

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

6.47

-

1855.83

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat+Tack Coat)

112.5

-

49.51

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

2.14

-

6615.06

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

12

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

6

-

3210

... More
45. Construction of Road from NH-43 to Kothavalasa road to Annamrajupeta via Kunambandavalasa in Pachipenta Mandal

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

2160

-

1.85

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

2400

-

68.8

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

745.2

-

1212.93

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

718.2

-

1850.06

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

4608

-

40.87

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

4608

-

8.68

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

115.2

-

6600.18

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

675

-

257.91

... More
Construction of Single Row 1000 mm dia RCC Pipe Culverts - 3 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

89.1

-

88.69

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

19.98

-

211.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

16.74

-

3214.19

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

50.43

-

4123.1

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

22.5

-

6763.51

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

2

-

1950.5

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

5

-

550.8

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

4

-

1902.06

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

12

-

1809.78

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Rectangle of size 800x600 mm

1

-

2085.37

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3024.79

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

0.54

-

1592.67

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

249

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

3.23

-

1850.06

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat+Tack Coat)

56.25

-

49.55

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

1.07

-

6600.18

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

6

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

8

-

3210

... More
46.Construction of Road from Kodikallavalasa-Mathumuru R&B Road to Chandivalasa via Godagavalasa in Pachipenta Mandal

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

2160

-

1.85

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

2400

-

68.8

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

745.2

-

1143.33

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

718.2

-

1772.92

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

4608

-

40.87

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

4608

-

8.68

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

115.2

-

6515.84

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

675

-

188.2

... More
Construction of 1Row 1000 mm dia RCC Pipe Culvert - 2No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

59.4

-

88.69

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

13.2

-

211.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

11.16

-

3162

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

33.62

-

4068.79

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

15

-

6808.86

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

2

-

1935.88

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

5

-

548.2

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

4

-

1895.22

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

12

-

1802.95

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Rectangular of size 800x600 mm

1

-

2078.53

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3015.67

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

0.54

-

1585.07

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

249

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

3.23

-

1772.92

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat+ Tack coat)

56.25

-

49.55

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

1.07

-

6515.84

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

6

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

8

-

3210

... More
47.Construction of road from Challapeta R&B Road to Rabanda in Mentada mandal in Vizianagaram district

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

1620

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

1650

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

370.5

-

1596.18

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

263.25

-

2268.4

... More
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

303.75

-

245.43

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, applying debonding strips, primer, sealant, Plasticizer 0.5 per cent by weight of cement as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.00 mts joint spacing)

583.95

-

5178.71

... More
Construction of Single Row 1000 mm dia RCC Pipe Culverts - 3 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

131.85

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

16.08

-

311.65

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

34.59

-

3423.37

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

63.03

-

4340.63

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

22.5

-

6782.47

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

2044.77

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

5

-

567.56

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

2

-

1946.17

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

12

-

1853.89

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

3.6

-

3083.6

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1641.68

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

382

-

702

... More
Construciton of Speed breaker with rigid pavement with a minimum width of 3.00mts with an parabolic hump of 100mm at centre at school zones etc completed

2.82

-

5178.71

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
48.Construction of Road from Jakkuva R&B road to Badevalasa in Mentada mandal in Vizianagaram district

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

1800

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

1500

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

411

-

1747.5

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

292.5

-

2436.12

... More
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

337.5

-

245.43

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, applying debonding strips, primer, sealant, Plasticizer 0.5 per cent by weight of cement as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.00 mts joint spacing)

647.7

-

5365.49

... More
Construction of Single Row 1000 mm dia RCC Pipe Culverts - 3 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

131.85

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

16.08

-

571.05

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

34.59

-

3604.71

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

72.03

-

4529.23

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

22.5

-

6953.14

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

2111.89

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

5

-

550.83

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

2

-

2001.12

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

14

-

1882.84

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3123

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

0.54

-

1653.63

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

236

-

702

... More
Construciton of Speed breaker with rigid pavement with a minimum width of 3.00mts with an parabolic hump of 100mm at centre at school zones etc completed

2.82

-

5365.49

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

4

-

3210

... More
Name of work:-"Construction of Road from Andra R&B Road to Malayadavalasa via Saradavalasa in Mentada Mandal" of Vizianagaram District - DPR/Estimate Amount. Rs.244.00 lakhs -

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

7920

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

9000

-

68.36

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

2065.5

-

246.31

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

2750.1

-

1537.98

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

2729.03

-

2203.9

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

16644

-

40.75

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

16644

-

8.61

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

416.1

-

6983.7

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

2475

-

245.43

... More
1000 mm dia RCC pie culverts - 7 No.s

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

307.65

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

80.71

-

3400.59

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

147.07

-

4316.94

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 600 mm dia RCC pipes

52.5

-

6828.07

... More
2.00 Mt. Span Slab Culvert - 1 No.s

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST & Seignorage Charges

66.66

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

14.81

-

3400.59

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations

17.9

-

4316.94

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations

56.9

-

4316.94

... More
VRCC concrete M-25grade for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding GST and seignorage charges for finished item of work.

2.1

-

4707.76

... More
VRCC concrete M-25grade for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding GST and seignorage charges for finished item of work.

3.54

-

5121.41

... More
VRCC concrete M-25grade for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding GST and seignorage charges for finished item of work.

4.68

-

5121.41

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST and seigniorage charges - For Sub Structures

1.2

-

48263

... More
Cost and supply of mastic pads including c/c of all materials and all labour charges etc. complete excluding GST & Seignorage Charges

3.6

-

839

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including cost, all labour charges for all operations excluding GST etc complete for finished item of work.

50

-

225.07

... More
5.00 Mt. Span 2-Vent Slab culvert - 1 No.

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST & Seignorage Charges

466.47

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

60.84

-

358.05

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

81.13

-

3400.59

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations

271.4

-

4316.94

... More
VRCC concrete M-25grade for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding GST and seignorage charges for finished item of work.

60.68

-

5121.41

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding GST & Seignorage Charges

7.88

-

5123.59

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST and seigniorage charges - For Sub Structures

5.5

-

48263

... More
Cost and supply of mastic pads including c/c of all materials and all labour charges etc. complete excluding GST & Seignorage Charges

19.88

-

839

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including cost, all labour charges for all operations excluding GST etc complete for finished item of work.

45.6

-

225.07

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,excluding GST & Seignorage Charges

32.95

-

632.56

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

4

-

2038.38

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

19

-

566.43

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

6

-

1943.18

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

15

-

1850.9

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Facility information signs::Like eating place,resting place,first aid post,toilet,filling station,hospital,public phone,police station. Rectangular of size 800x600 mm

2

-

2126.49

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3079.62

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1474.52

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

461.5

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

0.21

-

2203.9

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime cost+Tack coat)

3.76

-

49.36

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC 25mm thick)

0.1

-

6983.7

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

16

-

316

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3mm thick corrugated sheet metal rail, 70cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5mm spaced 2m centre to centre, 1.8m high, 1.1m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fix vertical post with a spacer of channel section 150 x 75 x 5mm, 330mm long complete as per clause 810 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

16

-

2440.36

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

36

-

3210

... More
50. Construction of Road from NH-43 Kodikallavalasa R&B Road to Pindrangivalasa in Pachipenta Mandal

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

3060

-

1.85

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

13600

-

68.8

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

1081.35

-

1268.61

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

1043.1

-

1911.78

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

6699

-

40.92

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

25824

-

8.69

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

167.48

-

6676.21

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

956.25

-

223.11

... More
Construction of Single Row 1000 mm dia RCC Pipe Culverts - 5 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

148.5

-

88.69

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

33.3

-

211.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

27.9

-

3255.96

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

84.05

-

4166.52

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

37.5

-

6922.25

... More
3 M span RCC slab culvert - 1 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

80.26

-

88.69

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

15.52

-

3255.96

... More
Providing plain concrete M 20 grade (Design Mix) in Substructure using 40, 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST ,Cost of Steel for Abutments

68.25

-

4802.17

... More
Providing plain concrete M 20 grade (Design Mix) in Substructure using 40, 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST ,Cost of Steel for Abutments

70.6

-

4802.17

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Wind walls

3.77

-

4957.2

... More
Providing and laying Reinforced Cement Concrete M 25 Grade (Design Mix) using 20&10 mm Metal (HBG) Mechanically mixed in superstructure as per drawing and Technical Specifications Clauses 800, 1205.4 and 1205.5 MORD/ Sections 1500, 1600 &1700 MoRTH, including Contractors Profit & Over head Charges, GST and Seigneroage etc. Complete upto 5m height - for Super Structure (Deck Slab)

8.1

-

5682.08

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 percent bitument by weight MORD, including overhead charges and contractors profit but excluding GST and seignorage charges etc.

15

-

71.66

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding VAT etc., complete- For Sub Structures

1.6

-

55892.17

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges

50

-

567.41

... More
Cost and supply of weep holes 100mm dia AC Pipes including cost and conveyance of all materials and all labour charges etc. complete

30

-

227.35

... More
Retaining wall

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

187

-

88.69

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

47

-

211.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

31

-

3255.96

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractor profit but excluding GST & Seignorage Charges

175.5

-

4166.52

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

60

-

227.35

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges

143

-

567.41

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

2

-

1962.19

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

7

-

552.88

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

6

-

1907.53

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

16

-

1815.25

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Rectangle of size 800x600 mm

1

-

2090.83

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3032.09

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

0.54

-

1598.74

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

349

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

6.47

-

1911.78

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat+Tack Coat)

112.5

-

49.61

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

2.14

-

6676.21

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

12

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

6

-

3210

... More
Name of work:-Construction of Road from Mathumuru to Seela via. Thaduru, Kothavalasa in Pachipenta Mandal of Vizianagaram District.

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

12240

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

13600

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

4179.6

-

1140.42

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

4026.6

-

1763.27

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

25824

-

40.81

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

25824

-

8.62

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

645.6

-

6506.84

... More
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

3825

-

187.33

... More
1000 mm dia I Row RCC pie culverts 15 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

445.5

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

99.9

-

207.25

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

83.7

-

3034.57

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

233.76

-

3936.26

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 600 mm dia RCC pipes

112.5

-

6906.64

... More
Construction of 3m span slab culvert-2nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

212.08

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

40.44

-

3034.57

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Footings

136.5

-

3936.26

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for abutments , wing walls and parapet wall

107.59

-

3936.26

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.

3.2

-

54865.59

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel for bed blocks

7.8

-

4712.85

... More
V.R.C.C concrete M - 25grade for Super Structure with 20 mm(SS5)HBG M/C graded metal with a cube strength of 25 N / mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating centering machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding VAT & Seignorage Charges for deck slab

16.2

-

5417.31

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding VAT & Seignorage Charges for wearing course

4.95

-

4746.6

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH

100

-

464.32

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

60

-

224.81

... More
Construction of two vent 6 m Span RCC Deck Slab Culvert

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding VAT & Seignorage Charges above water level upto 3.0 m depth

489

-

85.78

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding VAT & Seignorage Charges below water level upto 3.0 m depth

2964.07

-

90.07

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for Leveling Coarse

99.42

-

3034.57

... More
Providing concrete for plain concrete M15 ( Design mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for Foundations (cut off walls )

38.64

-

3936.26

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel - For rafts, foundations

90.47

-

4558.63

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel - For footings of abutments

85.63

-

4558.63

... More
Providing concrete for plain concrete M15 ( Design mix) using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for body ramp wall

560

-

3936.26

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel - For abutments

194.32

-

4558.63

... More
Providing concrete for reinforced concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges ,Cost of Steel for bed blocks

3.39

-

4712.85

... More
V.R.C.C concrete M - 25grade for Super Structure with 20 mm(SS5)HBG M/C graded metal with a cube strength of 25 N / mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating centering machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding VAT & Seignorage Charges for deck slab

35.85

-

5417.31

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding VAT & Seignorage Charges

5.58

-

4746.6

... More
Providing concrete for plain concrete M15 ( Design mix) using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seignorage Charges for Foundations for levelling course below apporach slab

5.78

-

3936.26

... More
Providing M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding VAT & Seignorage Charges For approach slab

5.78

-

4746.6

... More
Providing concrete for plain/reinforced concrete V.C.C grade M 20 (Design Mix) in Sub structure using 40 to 10 mm size Graded HBG aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause1500, 1700 & 2200 MORTH including contractors profit & Over head charges but excluding Seigonarage charges & VAT for side walls of the bridge

10.85

-

4558.63

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH ,including overhead charges and contractors profit but excluding VAT & Seignorage Charges

264.06

-

954.58

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH

55

-

464.32

... More
Supplying, fitting, and placing HYSD bar reinforcement in foundations complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.- For foundations

6.17

-

53363.83

... More
Supplying, fitting, and placing HYSD bar reinforcement in foundations complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.- For sub structure

3.2

-

53548.79

... More
Supplying, fitting, and placing HYSD bar reinforcement in foundations complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.- For super structure

8

-

54865.59

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

564

-

224.81

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight MORD ,including overhead charges and contractors profit .

18.62

-

71.33

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of 5 th kilometre stones of size 350x250x1675 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

3281.41

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size C

6

-

1935.88

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

28

-

548.2

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

10

-

1895.22

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

16

-

1802.95

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3015.67

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

3.24

-

1585.07

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1378

-

702

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete.(WMM)

0.65

-

1763.27

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete.(Prime Coat+Tack Coat)

11.26

-

49.43

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete.(SDBC 25mm)

0.21

-

6506.84

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

48

-

316

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3mm thick corrugated sheet metal rail, 70cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5mm spaced 2m centre to centre, 1.8m high, 1.1m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fix vertical post with a spacer of channel section 150 x 75 x 5mm, 330mm long complete as per clause 810 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

24

-

2440.36

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

72

-

3210

... More
52.Construction of Road from Chinaborabanda R&B road to Parannavalasa in Saluru mandal in Vizianagaram district

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

2160

-

1.85

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

1800

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

492

-

1171.17

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

351

-

1803.79

... More
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

405

-

246.31

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, applying debonding strips, primer, sealant, Plasticizer 0.5 per cent by weight of cement as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.00 mts joint spacing)

775.2

-

5031.7

... More
Construction of 5m span 3 vent RCC Slab culvert

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

280.5

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

50.1

-

3208.96

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

356.03

-

4117.66

... More
VRCC concrete M-25grade for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding GST and seignorage charges for finished item of work. for Deck Slab

62.4

-

5626.6

... More
Reinforced cement concrete M30 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1205 MORD and 1500, 1700 & 1211 MORTH, including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete For Wearing Coat.

39.9

-

4794.98

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

64

-

202.54

... More
Cost and supply of mastic pads including c/c of all materials and all labour charges etc. complete excluding GST & Seignorage Charges

18

-

546.49

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding VAT etc., complete- For Sub Structures

10

-

54865.59

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges

321.6

-

595.25

... More
Construction of Retaining Wall

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

342

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

68.4

-

3208.96

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

414

-

4117.66

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

288

-

200.03

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

2245.99

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

5

-

589.34

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

6

-

2064.15

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

18

-

1945.96

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

3.6

-

3188

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1720.26

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

258

-

702

... More
Construciton of Speed breaker with rigid pavement with a minimum width of 3.00mts with an parabolic hump of 100mm at centre at school zones etc completed

2.82

-

5031.7

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

4

-

3210

... More
Name of work:-Construction of R/F S.M road at 5/8km to Mosuruvalasa (via) Purohitunivalas, Bottadivalasaand Chinaborabanda in Saluru Mandal of Vizianagaram District

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

14040

-

1.85

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

15600

-

68.8

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

4760.1

-

1240.78

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

4577.4

-

1880.92

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

29394

-

40.94

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

29394

-

8.7

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

732.15

-

6643.17

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

4387.5

-

246.31

... More
1000 mm dia RCC pie culverts 11 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

483.42

-

88.69

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

126.83

-

3282.05

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

231.11

-

4193.65

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 600 mm dia RCC pipes

82.5

-

6832.1

... More
5 M Span RCC Slab Culvert - 2nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

466.47

-

88.69

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

60.84

-

316

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

81.13

-

3282.05

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

271.39

-

4193.65

... More
Providing plain concrete for M 20 grade (Design Mix) in Superstructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seigniorage Charges ,Cost of Steel etc. complete for finished item of work.-Bed blocks

15.8

-

4985.91

... More
Providing plain concrete for M 25 grade (Design Mix) in Superstructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seigniorage Charges ,Cost of Steel etc. complete for finished item of work. for Deck Slab

44.89

-

5714.29

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.

5.5

-

55892.17

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

46

-

227.54

... More
Supplying and fixing bituminous Mastic Pad 25.4mm including cost and conveyance and all labour charges and including contractors profit & over head charges etc. Complete for finished item of work

19.88

-

953

... More
Providing and laying cement concrete wearing course M 30 grade design mix including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH including cost, all labour charges for all operations etc complete but excluding steel and its fabrication charges, GST, Seignorage Charges etc complete for finished item of work

7.88

-

5014.5

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH

32.95

-

595.25

... More
2.0 M Span RCC Slab Culvert - 2no

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

133.32

-

88.69

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

29.62

-

3282.05

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

35.8

-

4193.65

... More
Providing plain concrete for M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seigniorage Charges ,Cost of Steel etc. complete for finished item of work

119.16

-

4830.88

... More
Providing plain concrete for M 20 grade (Design Mix) in Superstructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seigniorage Charges ,Cost of Steel etc. complete for finished item of work.-Bed blocks

7.08

-

4985.91

... More
Providing plain concrete for M 25 grade (Design Mix) in Superstructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seigniorage Charges ,Cost of Steel etc. complete for finished item of work. for Deck Slab

9.36

-

5714.29

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.

2.4

-

55892.17

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

100

-

227.54

... More
Supplying and fixing bituminous Mastic Pad 25.4mm including cost and conveyance and all labour charges and including contractors profit & over head charges etc. Complete for finished item of work

7.2

-

953

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of 5 th kilometre stones of size 350x250x1675 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

3330.32

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size C

7

-

1969.5

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

28

-

554.18

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

4

-

1910.95

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

17

-

1818.67

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Facility information signs::Like eating place,resting place,first aid post,toilet,filling station,hospital,public phone,police station. Rectangular of size 800x600 mm

2

-

2094.25

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3036.65

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1602.54

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

828

-

702

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. - WMM

8.63

-

1880.92

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete- prime coat+tack coat

98.44

-

49.64

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete - SDBC 25 mm thick layer

2.07

-

6643.17

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

64

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

56

-

3210

... More
54 Construction of road from Kandulapadam -Sambara Road to D.Velagavalasa in Salur Mandal

-

-

-

... More
Road Portion

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

1980

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

1650

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

451.5

-

1293.54

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

371.25

-

222.23

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

321.75

-

1932.98

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, applying debonding strips, primer, sealant, Plasticizer 0.5 per cent by weight of cement as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.00 mts joint spacing)

711.45

-

4966.42

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

2003.38

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

5

-

533.85

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

2

-

1950.25

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

12

-

1832.06

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

3.6

-

3055

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1597.21

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

232

-

702

... More
Construciton of Speed breaker with rigid pavement with a minimum width of 3.00mts with an parabolic hump of 100mm at centre at school zones etc completed

2.82

-

4966.42

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

8

-

3210

... More
Construction of 1Row 1000 mm dia RCC Pipe Culvert - 2Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

87.9

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

10.72

-

466.65

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

23.06

-

3217.26

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

48.02

-

4126.27

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

15

-

6986.6

... More
55 Construction of road from Kandulapadam to T.Kothavalasa in saluru Mandal.

-

-

-

... More
Road Portion

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

3960

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

4400

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

1418.62

-

1293.54

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

1237.5

-

245.43

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

1343.04

-

1932.98

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

8394

-

40.75

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

8394

-

8.65

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

209.85

-

6703.3

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

2

-

2003.38

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

7

-

533.85

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

6

-

1950.25

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

15

-

1832.06

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Rectangle of size 800x600 mm

2

-

2133.55

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3055

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1597.21

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

356

-

702

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

2.16

-

1932.98

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat+Tack Coat)

37.5

-

49.4

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

0.94

-

6703.3

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

24

-

3210

... More
Construction of 1Row 1000 mm dia RCC Pipe Culvert - 3Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

131.85

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

34.59

-

3217.26

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

72.03

-

4126.27

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

22.5

-

6873.21

... More
Single Vent-2 M span RCC slab culvert - 3 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

199.98

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

44.43

-

3217.26

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

53.7

-

4126.27

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges forabutments.

219.42

-

4126.27

... More
Providing concrete for reinforced concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Wind walls

10.62

-

5636.54

... More
Providing concrete for reinforced concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Deck slab

14.04

-

5636.54

... More
Supply and fixing of Mastic pads 12.70mm including coat of materials, conveyance, royality, OH&CP taxes, labour T&P etc., complete including overhead charges & Contractors profit but excluding GST and Seignorage Charges

10.8

-

546.49

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding VAT etc., complete- For Sub Structures

3.6

-

54865.59

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

150

-

200.13

... More
Name of work:-Construction of Road from NH43 at 474/6 to Karadavalasa of Saluru Mandal of Vizianagaram District

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

12960

-

1.86

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

14400

-

68.91

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

4393.6

-

1367.02

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

4226.4

-

2022.44

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

27144

-

40.95

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

27144

-

8.71

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

675.9

-

6797.96

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

4050

-

223.33

... More
1000 mm dia RCC pie culverts -7 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

307.65

-

89.42

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

80.71

-

3460.24

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

147.07

-

4378.98

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 600 mm dia RCC pipes

52.5

-

6952.84

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of 5 th kilometre stones of size 350x250x1675 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

3389.93

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size C

7

-

2010.48

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

28

-

561.47

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

6

-

1930.13

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

15

-

1837.85

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Facility information signs::Like eating place,resting place,first aid post,toilet,filling station,hospital,public phone,police station. Rectangular of size 800x600 mm

2

-

2113.43

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3062.21

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1623.84

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

166

-

702

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. - WMM

2.16

-

2022.44

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. - prime coat+tack coat

37.5

-

49.66

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. - SDBC 25 mm thick layer

0.71

-

6797.96

... More
Construction of speed breaker with Cement concrete pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre in at school zones etc complete.

2.81

-

5308.97

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3mm thick corrugated sheet metal rail, 70cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5mm spaced 2m centre to centre, 1.8m high, 1.1m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fix vertical post with a spacer of channel section 150 x 75 x 5mm, 330mm long complete as per clause 810 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

4

-

2440.36

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

8

-

3210

... More
57 Construction of road from Jilleduvalasa via Velagavalasa,Mulakkayavalasa in Saluru Mandal

-

-

-

... More
Road Portion

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

4500

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

5000

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

1600.87

-

1293.54

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

1406.25

-

245.43

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

1518.54

-

1932.98

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

9519

-

40.88

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

9519

-

8.65

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

237.98

-

6703.3

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

2

-

2003.38

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

7

-

533.85

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

6

-

1950.25

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

15

-

1832.06

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Rectangle of size 800x600 mm

2

-

2133.55

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3055

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1597.21

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

356

-

702

... More
Construciton of Speed breaker with rigid pavement with a minimum width of 3.00mts with an parabolic hump of 100mm at centre at school zones etc completed

2.82

-

4966.42

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (WMM)

2.16

-

1932.98

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (Prime Coat+Tack Coat)

37.5

-

49.53

... More
Construction of speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. (SDBC)

0.94

-

6703.3

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

28

-

3210

... More
5m single slab culvert=1no

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

286.5

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

37.37

-

466.65

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

49.83

-

3217.26

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

215.02

-

4126.27

... More
Providing concrete for reinforced concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Wind walls

7.9

-

5636.54

... More
Providing concrete for reinforced concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Deck slab

22.73

-

5636.54

... More
Providing and laying cement concrete M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding GST & Seignorage Charges for approach slabs

3.94

-

4934.78

... More
Supply and fixing of Mastic pads 12.70mm including coat of materials, conveyance, royality, OH&CP taxes, labour T&P etc., complete including overhead charges & Contractors profit but excluding GST and Seignorage Charges

15.75

-

546.49

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding VAT etc., complete- For Sub Structures

3.2

-

54865.59

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

38

-

200.13

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT

35.68

-

534.04

... More
Construction of 1Row 1000 mm dia RCC Pipe Culvert - 6Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

263.7

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

69.18

-

3217.26

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

144.06

-

4126.27

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

45

-

6873.21

... More
58 Construction of road from Sarika to Sompigam in Saluru Mandal.

-

-

-

... More
Road Portion

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

2700

-

1.86

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

1650

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80-100 kN vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

613.5

-

1297.18

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

506.25

-

223.33

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

438.75

-

1945.04

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, applying debonding strips, primer, sealant, Plasticizer 0.5 per cent by weight of cement as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.00 mts joint spacing)

981.75

-

5222.76

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

2364.01

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

8

-

612.18

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

10

-

2119.32

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

32

-

2001.14

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

3.6

-

3257

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1780.67

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

382

-

702

... More
Construciton of Speed breaker with rigid pavement with a minimum width of 3.00mts with an parabolic hump of 100mm at centre at school zones etc completed

2.82

-

5222.76

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

8

-

316

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

16

-

3210

... More
Construction of 1Row 1000 mm dia RCC Pipe Culvert - 2Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

87.9

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

10.72

-

499.24

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

23.06

-

3376.55

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

48.02

-

4291.93

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 1000 mm dia RCC pipes

15

-

6918.24

... More
Single Vent-2 M span RCC slab culvert - 1 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

66.66

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

14.81

-

3376.55

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

17.9

-

4291.93

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges forabutments.

73.14

-

4291.93

... More
Providing concrete for reinforced concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Wind walls

3.54

-

5827.69

... More
Supply and fixing of Mastic pads 12.70mm including coat of materials, conveyance, royality, OH&CP taxes, labour T&P etc., complete including overhead charges & Contractors profit but excluding GST and Seignorage Charges

3.6

-

546.49

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding VAT etc., complete- For Sub Structures

1.2

-

56148.82

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

50

-

200.03

... More
5m-3V slab culvert 1 no

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

280.5

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

50.1

-

3376.55

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

179.9

-

4291.93

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

176.13

-

4291.93

... More
Providing and laying Reinforced Cement Concrete M 25 Grade (Design Mix) using 20&10 mm Metal (HBG) Mechanically mixed in superstructure as per drawing and Technical Specifications Clauses 800, 1205.4 and 1205.5 MORD/ Sections 1500, 1600 &1700 MoRTH, including Contractors Profit & Over head Charges, GST and Seigneroage etc. Complete upto 5m height - for Super Structure (Bed blocks)

9.6

-

5827.69

... More
Providing and laying Reinforced Cement Concrete M 25 Grade (Design Mix) using 20&10 mm Metal (HBG) Mechanically mixed in superstructure as per drawing and Technical Specifications Clauses 800, 1205.4 and 1205.5 MORD/ Sections 1500, 1600 &1700 MoRTH, including Contractors Profit & Over head Charges, GST and Seigneroage etc. Complete upto 5m height - for Super Structure (Deck Slab)

52.8

-

5827.69

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding GST & Seignorage Charges for wearing course

9.9

-

4934.78

... More
Supply and fixing of Mastic pads 12.70mm including coat of materials, conveyance, royality, OH&CP taxes, labour T&P etc., complete including overhead charges & Contractors profit but excluding GST and Seignorage Charges

18

-

546.49

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding VAT etc., complete- For Sub Structures

10

-

54865.59

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 4kg/cm2 pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

64

-

203.35

... More
Providing and laying cement concrete M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding GST & Seignorage Charges for approach slabs

30

-

4934.78

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT

321.6

-

582.71

... More
Name of work:-Construction of road from Mamidipalli-Kandulapadam-Sambara R&B road at 4/4km to Yeragadavalasa Nanda PR road via Kottiparuvu, K. Kothavalasa and Burjavalasa in Saluru Mandal of Vizianagaram District

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

8730

-

1.82

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD/305 MORTH including overhead & Contract profit but excluding GST& Seignorage Charges

9700

-

68.36

... More
Construction of Granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete for finished item of work.

3028.48

-

1340.1

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

2893.28

-

1984.58

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

18331.5

-

40.88

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

18331.5

-

8.65

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

455.59

-

6760

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

2728.13

-

245.43

... More
1000 mm dia RCC pipe culverts 6 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

263.7

-

85.78

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

69.18

-

3273.06

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

126.06

-

4184.3

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work for 600 mm dia RCC pipes

45

-

6896.35

... More
5 M Span RCC Slab Culvert at KM 0/880,0/980 (2nos)

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

466.47

-

85.78

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit but excluding GST and seigniorage charges etc., complete for finished item of work.

60.84

-

404.46

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

81.13

-

3273.06

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Foundations.

271.39

-

4184.3

... More
Providing plain concrete for M 20 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seigniorage Charges ,Cost of Steel etc. complete for finished item of work -Bed blocks

15.8

-

4975.19

... More
VRCC concrete M-25grade for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No 1-76 to 5- 76A excluding GST and seignorage charges for finished item of work.-Deck slab

44.89

-

5703.5

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH Excluding steel and its fabrication charges excluding VAT & Seignorage Charges

7.88

-

4992.24

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.

5.5

-

54865.59

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

45.6

-

225.15

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH

32.95

-

534.04

... More
Supplying and fixing bituminous Mastic Pad 25.4mm including cost and conveyance and all labour charges and including contractors profit & over head charges etc. Complete for finished item of work

19.88

-

953.23

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones of size 650x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size C

5

-

2002.67

... More
Providing and fixing of Hectometre stones of size mm 350x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

20

-

560.08

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for Circular plate size 600 mm

4

-

1926.47

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for equilateral traiangle of size 600 mm

25

-

1834.19

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3057.34

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

1.08

-

1619.79

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

246.4

-

702

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete. - WMM

2.16

-

1984.58

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete- prime coat+tack coat

37.5

-

49.53

... More
Construction of Speed breaker with flexible pavement with an minimum width of 3.00 with an parabolic hump of 100 mm at centre at school zones etc complete - SDBC 25 mm thick layer

0.71

-

6760

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

64

-

316

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3mm thick corrugated sheet metal rail, 70cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5mm spaced 2m centre to centre, 1.8m high, 1.1m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fix vertical post with a spacer of channel section 150 x 75 x 5mm, 330mm long complete as per clause 810 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

80

-

2440.36

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

28

-

3210



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.