To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date15 Nov 2023
Closing Date22 Nov 2023
Tender Amount₹ 12,63,022.87 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)

52.08

17231

330.85

... More
Plain Cement Concrete in (1:4:8) proportion ( Cement; fine aggregate" Coarse aggregate) for foundations and uinder flooring bed using 40mm size ( SS5) hard granite metal from approved quarry incluidng cost and conveyance of all materials like Cement, Sand, coarse aggregate, watering etc to site, incluidng cost of on all materials, charges for machine mixing, laying concrete, ramming in 15 CM layers, finishing top surface to the required level curing etc complete for finished item of work for lean Concrete

3.56

16194

4548.8

... More
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)

4.43

19463

4393.46

... More
Supply and placing of the Nominal Mix Concrete M 20 grade corresponding to IS 456 with cement content of 330 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Footings

9.54

84844

8893.45

... More
Supply and placing of the Nominal Mix Concrete M 20 grade corresponding to IS 456 with cement content of 330 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Pedastals

1.62

15215

9392.22

... More
Supply and placing of the Nominal Mix Concrete M 20 grade corresponding to IS 456 with cement content of 330 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Plinth Beam

4.24

47825

11279.37

... More
Supply and placing of the Nominal Mix Concrete M 20 grade corresponding to IS 456 with cement content of 340 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using casurina ballies, bamboos, wooden reapers, runners, wood posts, wall plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Columns

3.69

42842

11610.31

... More
Supply and placing of the Nominal Mix Concrete M 20 grade corresponding to IS 456 with cement content of 340 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using casurina ballies, bamboos, wooden reapers, runners, wood posts, wall plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Lintels

0.6

6893

11488.28

... More
Supply and placing of the Nominal Mix Concrete M 20 grade corresponding to IS 456 with cement content of 340 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using casurina ballies, bamboos, wooden reapers, runners, wood posts, wall plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Roof beams

3.92

42802

10919

... More
Supply and placing of the Nominal Mix Concrete M 20 grade corresponding to IS 456 with cement content of 340 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using casurina ballies, bamboos, wooden reapers, runners, wood posts, wall plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Roof Slab 125mm thick

9.9

104701

10575.89

... More
Supply and placing of the Nominal Mix Concrete M 20 grade corresponding to IS 456 with cement content of 340 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site, centering using casurina ballies , bamboos , wooden reapers , runners , wood posts , wall plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for Sunshades

0.46

7026

15273.57

... More
Brick masonry for panel walls in Basement with CM (1:6) prop: (Cement : Sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504). for Basement

9.82

74374

7573.77

... More
Brick masonry for panel walls in Super structure with CM (1:8) prop: (Cement : Sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504). for Super Structure GF

10.48

83711

7987.73

... More
Providing Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work.( APSS No.126)

4

347071

86767.78

... More
Ornamental Plastering to ceiling 8mm thick in CM(1:3) in Single coat with dubara spong finishing including cost and conveyance of all materials like cement, sand water etc., including sales and other taxes on all materials and all operational incidental charges on materials and including cost of all labour charges for mixing mortar curing grooves where ever necessary as directed by Engineer-in-Charge etc., complete

99.19

25353

255.6

... More
Plasteirng in CM (1:5) 12mm thick with dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc to stie including seignorage charges, GST and other taxes on materials all operational, incidental and labour cahrges such as mixing, laying, curing, lift charges etc and including cutting Grooves wherever necessary as directed by Engineer-in-charge complete for uneven surface of wall for finished item of work

302.04

102981

340.95

... More
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 12mm thick (average) mixed with integral cement water proofing admixture confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 100ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

79.19

28400

358.63

... More
Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors

381.23

68362

179.32

... More
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, fixing 1mm thick mat finish laminated sheet to full width and height of the flush shutter both sides including cost and conveyance to site of teak wood frame, flush shutter, laminate sheet including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Aluminium fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm)

2

27754

13876.82



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.