Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Opening Date29 Nov 2024
Closing Date16 Dec 2024
Tender Amount₹ 1,02,05,507 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 225 mm dia pipe lines

28

6389

178897

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) .in HDPE 200 mm dia pipe lines

18

4791

86255

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 180 mm dia pipe lines

32

4791

153342

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 160 mm dia pipe lines

18

4173

75125

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 140 mm dia pipe lines

21

3097

65041

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 125 mm dia pipe lines

18

2799

50393

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 110 mm dia pipe lines

23

2537

58357

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 90 mm dia pipe lines

25

1823

45582

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 75 mm dia pipe lines

35

1823

63815

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 63 mm dia pipe lines

35

1823

63815

... More
Labour Charges for leakage in PVC Pipe line of following chameter of entferent places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) .ks as per the direction of the department officers and as per the technical specifications but exculding GST. in PVC 180 mm dia 4kg/cm2 pipe lines.

29

3925

113828

... More
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 160 mm dia 4kg/cm2 pipe lines.

10

3595

35957

... More
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 140 mm dia 4kg/cm2 pipe lines.

13

2486

32325

... More
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 125 mm dia 4kg/cm2 pipe lines.

12

2307

27693

... More
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 110 mm dia 4kg/cm2 pipe lines.

20

2146

42931

... More
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 90 mm dia 4kg/cm2 pipe lines.

18

1506

27113

... More
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 75 mm dia 4kg/cm2 pipe lines.

20

1498

29965

... More
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 63 mm dia 4kg/cm2 pipe lines.

25

1490

37257

... More
Labour Charges for leakage in MS Pipe line of following chameter of diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, grinding ,cutting the pipe line or joint if necessary including welding rods duly approved by EIC of approiate number and size inclusive of excavator ,hydraulic crane , D.G set, welding machine ,gas cutter with LPG cylinder,Oxygen cylinder ,grinding machine etc with fuel operator & labour etc complete( including all material but excluding cost of Pipe ) . in MS pipe lines 450 mm dia.

6

3407

20443

... More
Labour Charges for leakage in MS Pipe line of following chameter of diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, grinding ,cutting the pipe line or joint if necessary including welding rods duly approved by EIC of approiate number and size inclusive of excavator ,hydraulic crane , D.G set, welding machine ,gas cutter with LPG cylinder,Oxygen cylinder ,grinding machine etc with fuel operator & labour etc complete( including all material but excluding cost of Pipe ) . in MS pipe lines 400 mm dia.

8

3390

27121

... More
Labour Charges for leakage in MS Pipe line of following chameter of diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, grinding ,cutting the pipe line or joint if necessary including welding rods duly approved by EIC of approiate number and size inclusive of excavator ,hydraulic crane , D.G set, welding machine ,gas cutter with LPG cylinder,Oxygen cylinder ,grinding machine etc with fuel operator & labour etc complete( including all material but excluding cost of Pipe ) . in MS pipe lines 350 mm dia.

9

2639

23759

... More
Labour Charges for leakage in MS Pipe line of following chameter of diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, grinding ,cutting the pipe line or joint if necessary including welding rods duly approved by EIC of approiate number and size inclusive of excavator ,hydraulic crane , D.G set, welding machine ,gas cutter with LPG cylinder,Oxygen cylinder ,grinding machine etc with fuel operator & labour etc complete( including all material but excluding cost of Pipe ) . in MS pipe lines 300 mm dia.

7

2639

18479

... More
Supply ,delivery and stacking of Chlorine gas as IS 646:1986 in cylinders including cost of material,conveyance,stacking at the location specified by the department and all taxes,duties etc complete

3

34600

103800

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 1000KL sump @ Penubaka

1915.68

82

15709

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 450KL sump @ Ithamvalasa

886.68

82

7271

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 100 KL sump @ M.Duggivalasa

229.64

82

1883

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 30 KL sump @Pedanandipalli

98.02

82

804

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 40 KL sump @ Ramayyavalasa

117.06

82

960

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 30 KL sump @ Kondalaveru

98.02

82

804

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 200 KL sump @ Vootapalli

370.16

82

3035

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 40 KL sump @ Chinarayavaram

117.06

82

960

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 30 KL sump @ Pedarayavaram

98.02

82

804

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 30 KL sump @ Avagudem

98.02

82

804

... More
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 60KL sump @ Baguvalasa

168.28

82

1380

... More
Carryout routine maintenance and servicing of LT. Cubical panel board having approximately 15 to 22 Nos of switches cleaning with power blower and servicing the contacts, tightening the connection of incoming and outgoing cables, and checking the operating mechanism for smooth functioning of switches and putting them in smooth working condition.

2

3564

7128

... More
Supply of new and tested transformer oil as per IS-335 - 1972 (per Ltr) for Boddavalasa head works,Penubaka pump house & Ithamvalasa pumphouse transformer yard

120

143

17160

... More
Testing of Transformer oil for dielectric breakdown strength.

3

713

2139



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.