Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Opening Date29 Nov 2024
Closing Date16 Dec 2024
Tender Amount₹ 1,02,05,507
Costs
EMD
₹ 1,02,055Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
771186Tender No
20/2024-25/AE3 dt.25.10.2024 of gthe SE RWSS VZMTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 225 mm dia pipe lines
28
6389
178897
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) .in HDPE 200 mm dia pipe lines
18
4791
86255
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 180 mm dia pipe lines
32
4791
153342
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 160 mm dia pipe lines
18
4173
75125
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 140 mm dia pipe lines
21
3097
65041
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 125 mm dia pipe lines
18
2799
50393
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 110 mm dia pipe lines
23
2537
58357
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 90 mm dia pipe lines
25
1823
45582
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 75 mm dia pipe lines
35
1823
63815
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in HDPE 63 mm dia pipe lines
35
1823
63815
Labour Charges for leakage in PVC Pipe line of following chameter of entferent places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) .ks as per the direction of the department officers and as per the technical specifications but exculding GST. in PVC 180 mm dia 4kg/cm2 pipe lines.
29
3925
113828
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 160 mm dia 4kg/cm2 pipe lines.
10
3595
35957
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 140 mm dia 4kg/cm2 pipe lines.
13
2486
32325
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 125 mm dia 4kg/cm2 pipe lines.
12
2307
27693
Labour Charges for leakage in HDPE Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 110 mm dia 4kg/cm2 pipe lines.
20
2146
42931
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 90 mm dia 4kg/cm2 pipe lines.
18
1506
27113
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 75 mm dia 4kg/cm2 pipe lines.
20
1498
29965
Labour Charges for leakage in PVC Pipe line of following chameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, cutting the pipe line, jointing & replacing using CID joint including CID Joint inclusive of using all required machinery, lobour. D.G set, fuel, operator, CID Joints, rubber rings, nuts bolts ete complete(but excluding cost of Pipe &GST) . in PVC 63 mm dia 4kg/cm2 pipe lines.
25
1490
37257
Labour Charges for leakage in MS Pipe line of following chameter of diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, grinding ,cutting the pipe line or joint if necessary including welding rods duly approved by EIC of approiate number and size inclusive of excavator ,hydraulic crane , D.G set, welding machine ,gas cutter with LPG cylinder,Oxygen cylinder ,grinding machine etc with fuel operator & labour etc complete( including all material but excluding cost of Pipe ) . in MS pipe lines 450 mm dia.
6
3407
20443
Labour Charges for leakage in MS Pipe line of following chameter of diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, grinding ,cutting the pipe line or joint if necessary including welding rods duly approved by EIC of approiate number and size inclusive of excavator ,hydraulic crane , D.G set, welding machine ,gas cutter with LPG cylinder,Oxygen cylinder ,grinding machine etc with fuel operator & labour etc complete( including all material but excluding cost of Pipe ) . in MS pipe lines 400 mm dia.
8
3390
27121
Labour Charges for leakage in MS Pipe line of following chameter of diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, grinding ,cutting the pipe line or joint if necessary including welding rods duly approved by EIC of approiate number and size inclusive of excavator ,hydraulic crane , D.G set, welding machine ,gas cutter with LPG cylinder,Oxygen cylinder ,grinding machine etc with fuel operator & labour etc complete( including all material but excluding cost of Pipe ) . in MS pipe lines 350 mm dia.
9
2639
23759
Labour Charges for leakage in MS Pipe line of following chameter of diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud. cleaning of pipe and leakage portion, grinding ,cutting the pipe line or joint if necessary including welding rods duly approved by EIC of approiate number and size inclusive of excavator ,hydraulic crane , D.G set, welding machine ,gas cutter with LPG cylinder,Oxygen cylinder ,grinding machine etc with fuel operator & labour etc complete( including all material but excluding cost of Pipe ) . in MS pipe lines 300 mm dia.
7
2639
18479
Supply ,delivery and stacking of Chlorine gas as IS 646:1986 in cylinders including cost of material,conveyance,stacking at the location specified by the department and all taxes,duties etc complete
3
34600
103800
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 1000KL sump @ Penubaka
1915.68
82
15709
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 450KL sump @ Ithamvalasa
886.68
82
7271
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 100 KL sump @ M.Duggivalasa
229.64
82
1883
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 30 KL sump @Pedanandipalli
98.02
82
804
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 40 KL sump @ Ramayyavalasa
117.06
82
960
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 30 KL sump @ Kondalaveru
98.02
82
804
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 200 KL sump @ Vootapalli
370.16
82
3035
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 40 KL sump @ Chinarayavaram
117.06
82
960
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 30 KL sump @ Pedarayavaram
98.02
82
804
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 30 KL sump @ Avagudem
98.02
82
804
Labour charges for Cleaning of Sumps including cleaning and removal of algae ,calcinations ,sludge ,dirt deposition from Side walls and bottom portion of the container by disinfection with bleaching powder with all necessary tools,plants labour charges and cost of disinfectants for 60KL sump @ Baguvalasa
168.28
82
1380
Carryout routine maintenance and servicing of LT. Cubical panel board having approximately 15 to 22 Nos of switches cleaning with power blower and servicing the contacts, tightening the connection of incoming and outgoing cables, and checking the operating mechanism for smooth functioning of switches and putting them in smooth working condition.
2
3564
7128
Supply of new and tested transformer oil as per IS-335 - 1972 (per Ltr) for Boddavalasa head works,Penubaka pump house & Ithamvalasa pumphouse transformer yard
120
143
17160
Testing of Transformer oil for dielectric breakdown strength.
3
713
2139
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%