Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date4 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 3,24,41,323 
Notes
Download

Costs

Summary

Package.no. Ap05pvt10-providing B.t Road From Pulusumamidi To Doragondhi In Y Ramavaram (m) In Asr District

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

11567

96

1110432

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete.., complete.

4250

229

973250

... More
Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

1365

3390

4627350

... More
Construction of Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

2070

390

807300

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

1834

4550

8344700

... More
Providing and applying primer coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc., complete for Prime Coat

11312

42

477366.4

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc., complete for Tack Coat

11312

14

161761.6

... More
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates as per Table 500.15 of MORD using VG 30 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant by manual means, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 507 MORD'2014, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

11312

229

2590448

... More
Construction of un-reinforced, panneled cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and contraction sawn joint groove (using daimond studded nblades) 3 to 5 mm wide and 1/3rd to 1/4th depth of the slab + or - 5mm or .Thecontraction joint shall be cut as soon as the concrete as under goneinitial hardening and as hard enogh to take up the load of joint swaing machine with out causing damage to the slab. The joint ceilling compound shall not be poured bitumen type having flexibility, resistaance to age hardening and durability of the sealant shall be in accordance with BS 5212 (part-2) with all leads and lifts and coat and conveyance of all materials for 100 thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

419

10360

4340840

... More
Road Furniture

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 5th Kilometre Stone (precast) for Ordinary KM Stone

5

2930

14650

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 5th Kilometre Stone (precast) for 200 M Stone

19

816

15504

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three Alluminium Composite Material as per Drawings, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

1

14310

14310

... More
Providing and fixing of Maintenance information board as per IRC:67 made of type Retro reflective sheeting vide Clause 1701.2.3 MORD / 801.3 MORTH fixed over Alluminium Composite Material of 4mm thickness and size of 900 x 1500 mm on a frame made up of 25X25X6mm thick MS angles and 25x 5mm MS Flats and welded to welded MS flat Iron plates 50 x 5 mm size on back and welded to 75 mm x 75mm x6mm MS hallow squar tube frame of height 3.00m as per the drawing and painted with ready mixed synthetic enamel paint of superior quality in required shade and colour, lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications.The 75mm dia steel tubes welded with 50 x 50x 6 mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 600 x 600 x 750 mm, 600 mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit but excluding GST & Seigniorage charges etc., complete.

1

18760

18760

... More
Providing and fixing of Citizen information board as per MoRD specifications and drawings. The board will be a composite unit consisting of 2 MS plates of 1.6 mm (16SWG) thickness and size of 900 x 750 mm welded over welded MS Flat iron plates 50 x 5 mm size on back and welded to 75 mm 3.65 mm thick (B class) steel tube frame of height 3.05m as per the drawing and painted colour, lettering, colour, band, diagrams, specifications. the 75mm dia steel tubes welded with 50 x 50x 6mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 600x600x750 mm, 600mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit, etc., complete

2

18660

37320

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three Alluminium Composite Material , top and Bottom plate duly Revited with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 1 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate and Bottom Plate will be made with 25mmX25mmX5mm MS Angles and welded MS tube tube. All MS painted Epoxy on Both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

3

4360

13080

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.at Speed breakers near Junctions,T Boards at junctions ,Prohibited boards at junctions (triangle of size 600 X 600mm size)

22

2630

57860

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.Circular sign Boards 600mm dia

20

2770

55400

... More
Providing and erecting direction and place identification retro-refectorised sign as per IRC:67 made of encapsulated lens type refective type sheeting vide clause 1701.2.3 MORD fixed over aluiminium sheeting,2 mm thick with area not exceeding 0.90 sqm supported on mild steel iron posts 75x75x6 mm firmly fixed to ground by means of propoerly designed foundation with M15 grade cement concrete 450x450x600 mm,600 mm below groubd level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

6

3320

19920

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

268

560

150080

... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

48

3514

168672

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

447

336

150192

... More
Name of the sub Work : Construction of One vents 1000 mm dia. Pipe culverts -2 Nos (2/100,4/570)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations

91

122

11102

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

5

2850

14250

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

26

6540

170040

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- for Head walls of pipe culverts

40.5

6890

279045

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes plain end pipes

30

9810

294300

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. excluding GST & Seigniorage Charges. etc., complete.

34

160

5440

... More
Name of the sub Work : Construction of two vents 1000 mm dia. Pipe culverts at Km 2/400,2/900,4/100 & 4/300 (4 Nos)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations

237.5

122

28975

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

22

2850

62700

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

85

6540

555900

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- for Head walls of pipe culverts

77

6890

530530

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes plain end pipes

60

9810

588600

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. excluding GST & Seigniorage Charges. etc., complete.

60

160

9600

... More
Sub Work : Construction of single vent 600 mm dia. Pipe culvert at Km 0/300 (1No)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations

22.5

122

2745

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

2

2850

5700

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

6.5

6540

42510

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- for Head walls of pipe culverts

15.5

6890

106795

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 600mm dia NP3 pipes plain end pipes

7.5

4090

30675

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. excluding GST & Seigniorage Charges. etc., complete.

10.5

160

1680

... More
Sub Work : Construction of 1 vent 2 mts span RCC slab culverts in km 1/570,km1/900 (2No)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations

356

122

43432

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

25

2850

71250

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

30

6540

196200

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Footings

137

6890

943930

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments

122.5

7290

893025

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height) for bed blocks

7.5

9160

68700

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

10.5

9970

104685

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

88

226

19888

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

7.2

1040

7488

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures - For Sub Structures

1.2

77070

92484

... More
Supplying, fitting, and placing HYSD bar reinforcement FE 500 in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

2

78950

157900

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

45.5

847

38538.5

... More
Sub Work :Construction of 1 vent 4.00 mts span RCC slab culvert (1 No) '@ KM 3/100

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations

254

122

30988

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

22

6540

143880

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments footings

111

6890

764790

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments

130

7290

947700

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height) for bed blocks

4

9160

36640

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

22

9970

219340

... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

2.7

8690

23463

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

48

226

10848

... More
P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) mechanically mixed leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD & 2700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

4.5

7580

34110

... More
Reinforced Cement Concrete M 25 grade approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

9

7850

70650

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

6.5

1040

6760

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures - For Sub Structures

1.5

77070

115605

... More
Supplying, fitting, and placing HYSD bar reinforcement FE 415 in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

2

78950

157900

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

66

847

55902

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

27.5

3510

96525

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete

8.5

160

1360

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete.., complete.

702

229

160758



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.