Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date6 Nov 2023
Closing Date21 Nov 2023
Tender Amount₹ 3,87,63,334 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

1.2

4487

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

100

161400

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

80

131040

1638

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.7x1.0m trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

233050

466.1

... More
Construction of 40 KL capacity OHSR of 12.90 mts staging with M30 grade design mix at the site selected by the Department, as per drawings and as specified in Technical Specification including earth work excavation in all types of soils in wet or dry conditions for foundations including cost and conveyance of all materials, cost and fabrication of steel, fixtures, labour charges and testing the reservoir for water tightness etc., complete for finished item of work as per the Standard Specifications and as per the provisions made in the current SOR . The rate is inclusive of cost of all materials and labour charges and all taxes, duties and levies, etc., complete for finished item of work, but excluding GST and Seigniorage charges, including Overheads and Contractors Profit @13.615%. 1). All concrete members shall be designed with M30 grade design mix. 2) Rate is for OHSRs with RAFT FOUNDATION 3) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir including bottom of roof. 4) Rate inclusive of 2 coats of whether proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections including cost of pipes, bends and valves as per departmental designs and drawings. 5) The above rates are applicable for basic wind speed of 200 KMPH . Fixtures include : a) RCC or Aluminium ladder inside 0.60 m wide. b) Spiral staircase on the outside shall be provided upto 200 KL. c) Lightening arrestor, including conductor and earthling etc.,d) RCC ventilators with copper or stainless steel fly proof mesh. B129 e) D.I Manholes frame and cover 0.60x0.60m as per IS specifications (light duty) - 2 Nos. f)Water level indicator of good quality with ebonite/copper float of approved pattern-1 No. g) The railing provided to the gallery and staircase shall be with stainless steel of grade 304 for a height of 1.20m. i) D.I swan neck ventilators shall be provided in top dome and slab. j). Bed Blocks of 0.45m x 0.45m x 0.30m in CC M15 Mix below all the duck foot bends k) The rates are exclusive of DI verticals for all inlet, out let, overflow and scour connections( as per estimate diameters) and D.I valves. All valves near inlet, out let and for scour shall be D.I valves of heavy duty conforming to the specification of SoR item No.30 SBC@15.00T/Sqm

40

1926075

48151.88

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

7.9

29539

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

130

209820

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

100

163800

1638

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.7x1.0m trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

233050

466.1

... More
Construction of 90 KL capacity OHSR of 12.90 mts staging with M30 grade design mix at the site selected by the Department, as per drawings and as specified in Technical Specification including earth work excavation in all types of soils in wet or dry conditions for foundations including cost and conveyance of all materials, cost and fabrication of steel, fixtures, labour charges and testing the reservoir for water tightness etc., complete for finished item of work as per the Standard Specifications and as per the provisions made in the current SOR . The rate is inclusive of cost of all materials and labour charges and all taxes, duties and levies, etc., complete for finished item of work, but excluding GST and Seigniorage charges, including Overheads and Contractors Profit @13.615%. 1). All concrete members shall be designed with M30 grade design mix. 2) Rate is for OHSRs with RAFT FOUNDATION 3) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir including bottom of roof. 4) Rate inclusive of 2 coats of whether proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections including cost of pipes, bends and valves as per departmental designs and drawings. 5) The above rates are applicable for basic wind speed of 200 KMPH . Fixtures include : a) RCC or Aluminium ladder inside 0.60 m wide. b) Spiral staircase on the outside shall be provided upto 200 KL. c) Lightening arrestor, including conductor and earthling etc.,d) RCC ventilators with copper or stainless steel fly proof mesh. B129 e) D.I Manholes frame and cover 0.60x0.60m as per IS specifications (light duty) - 2 Nos. f)Water level indicator of good quality with ebonite/copper float of approved pattern-1 No. g) The railing provided to the gallery and staircase shall be with stainless steel of grade 304 for a height of 1.20m. i) D.I swan neck ventilators shall be provided in top dome and slab. j). Bed Blocks of 0.45m x 0.45m x 0.30m in CC M15 Mix below all the duck foot bends k) The rates are exclusive of DI verticals for all inlet, out let, overflow and scour connections( as per estimate diameters) and D.I valves. All valves near inlet, out let and for scour shall be D.I valves of heavy duty conforming to the specification of SoR item No.30 SBC@15.00T/Sqm

90

3061357

34015.08

... More
Construction of pipelines for water supply with 63mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1200

547800

456.5

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

800

478160

597.7

... More
Construction of pipelines for water supply with 110mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

100

74170

741.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

7.9

29539

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 63 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

150

238650

1591

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

100

161400

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

81

132678

1638

... More
Construction of pipelines for water supply with 110mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.7x1.0m trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

305050

610.1

... More
Construction of 20 KL capacity OHSR of 9.60 mts staging with M30 grade design mix at the site selected by the Department, as per drawings and as specified in Technical Specification including earth work excavation in all types of soils in wet or dry conditions for foundations including cost and conveyance of all materials, cost and fabrication of steel, fixtures, labour charges and testing the reservoir for water tightness etc., complete for finished item of work as per the Standard Specifications and as per the provisions made in the current SOR . The rate is inclusive of cost of all materials and labour charges and all taxes, duties and levies, etc., complete for finished item of work, but excluding GST and Seigniorage charges, including Overheads and Contractors Profit @13.615%. 1). All concrete members shall be designed with M30 grade design mix. 2) Rate is for OHSRs with RAFT FOUNDATION 3) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir including bottom of roof. 4) Rate inclusive of 2 coats of whether proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections including cost of pipes, bends and valves as per departmental designs and drawings. 5) The above rates are applicable for basic wind speed of 200 KMPH . Fixtures include : a) RCC or Aluminium ladder inside 0.60 m wide. b) Spiral staircase on the outside shall be provided upto 200 KL. c) Lightening arrestor, including conductor and earthling etc.,d) RCC ventilators with copper or stainless steel fly proof mesh. B129 e) D.I Manholes frame and cover 0.60x0.60m as per IS specifications (light duty) - 2 Nos. f)Water level indicator of good quality with ebonite/copper float of approved pattern-1 No. g) The railing provided to the gallery and staircase shall be with stainless steel of grade 304 for a height of 1.20m. i) D.I swan neck ventilators shall be provided in top dome and slab. j). Bed Blocks of 0.45m x 0.45m x 0.30m in CC M15 Mix below all the duck foot bends k) The rates are exclusive of DI verticals for all inlet, out let, overflow and scour connections( as per estimate diameters) and D.I valves. All valves near inlet, out let and for scour shall be D.I valves of heavy duty conforming to the specification of SoR item No.30 SBC@15.00T/Sqm

20

1127082

56354.1

... More
Construction of pipelines for water supply with 63mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1200

547800

456.5

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

3.93

14695

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 63 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

80

127280

1591

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

70

112980

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

12

19656

1638

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.7x1.0m trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

233050

466.1

... More
Construction of 20 KL capacity OHSR of 9.60 mts staging with M30 grade design mix at the site selected by the Department, as per drawings and as specified in Technical Specification including earth work excavation in all types of soils in wet or dry conditions for foundations including cost and conveyance of all materials, cost and fabrication of steel, fixtures, labour charges and testing the reservoir for water tightness etc., complete for finished item of work as per the Standard Specifications and as per the provisions made in the current SOR . The rate is inclusive of cost of all materials and labour charges and all taxes, duties and levies, etc., complete for finished item of work, but excluding GST and Seigniorage charges, including Overheads and Contractors Profit @13.615%. 1). All concrete members shall be designed with M30 grade design mix. 2) Rate is for OHSRs with RAFT FOUNDATION 3) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir including bottom of roof. 4) Rate inclusive of 2 coats of whether proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections including cost of pipes, bends and valves as per departmental designs and drawings. 5) The above rates are applicable for basic wind speed of 200 KMPH . Fixtures include : a) RCC or Aluminium ladder inside 0.60 m wide. b) Spiral staircase on the outside shall be provided upto 200 KL. c) Lightening arrestor, including conductor and earthling etc.,d) RCC ventilators with copper or stainless steel fly proof mesh. B129 e) D.I Manholes frame and cover 0.60x0.60m as per IS specifications (light duty) - 2 Nos. f)Water level indicator of good quality with ebonite/copper float of approved pattern-1 No. g) The railing provided to the gallery and staircase shall be with stainless steel of grade 304 for a height of 1.20m. i) D.I swan neck ventilators shall be provided in top dome and slab. j). Bed Blocks of 0.45m x 0.45m x 0.30m in CC M15 Mix below all the duck foot bends k) The rates are exclusive of DI verticals for all inlet, out let, overflow and scour connections( as per estimate diameters) and D.I valves. All valves near inlet, out let and for scour shall be D.I valves of heavy duty conforming to the specification of SoR item No.30 SBC@15.00T/Sqm

20

1127082

56354.1

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1200

618720

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

597700

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

1.2

4487

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

80700

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

48

78624

1638

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.7x1.0m trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

233050

466.1

... More
Construction of 20 KL capacity OHSR of 9.60 mts staging with M30 grade design mix at the site selected by the Department, as per drawings and as specified in Technical Specification including earth work excavation in all types of soils in wet or dry conditions for foundations including cost and conveyance of all materials, cost and fabrication of steel, fixtures, labour charges and testing the reservoir for water tightness etc., complete for finished item of work as per the Standard Specifications and as per the provisions made in the current SOR . The rate is inclusive of cost of all materials and labour charges and all taxes, duties and levies, etc., complete for finished item of work, but excluding GST and Seigniorage charges, including Overheads and Contractors Profit @13.615%. 1). All concrete members shall be designed with M30 grade design mix. 2) Rate is for OHSRs with RAFT FOUNDATION 3) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir including bottom of roof. 4) Rate inclusive of 2 coats of whether proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections including cost of pipes, bends and valves as per departmental designs and drawings. 5) The above rates are applicable for basic wind speed of 200 KMPH . Fixtures include : a) RCC or Aluminium ladder inside 0.60 m wide. b) Spiral staircase on the outside shall be provided upto 200 KL. c) Lightening arrestor, including conductor and earthling etc.,d) RCC ventilators with copper or stainless steel fly proof mesh. B129 e) D.I Manholes frame and cover 0.60x0.60m as per IS specifications (light duty) - 2 Nos. f)Water level indicator of good quality with ebonite/copper float of approved pattern-1 No. g) The railing provided to the gallery and staircase shall be with stainless steel of grade 304 for a height of 1.20m. i) D.I swan neck ventilators shall be provided in top dome and slab. j). Bed Blocks of 0.45m x 0.45m x 0.30m in CC M15 Mix below all the duck foot bends k) The rates are exclusive of DI verticals for all inlet, out let, overflow and scour connections( as per estimate diameters) and D.I valves. All valves near inlet, out let and for scour shall be D.I valves of heavy duty conforming to the specification of SoR item No.30 SBC@15.00T/Sqm

20

1127082

56354.1

... More
Construction of pipelines for water supply with 63mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1500

684750

456.5

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Construction of pipelines for water supply with 110mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

300

222510

741.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

3.93

14695

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 63 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

79550

1591

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

80700

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

15

24570

1638

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.7x1.0m trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

800

372880

466.1

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

597700

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

3.9

14582

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

60

96840

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

30

49140

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

64084

32042

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

2

77604

38802

... More
Construction of pipelines for water supply with 63mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

456500

456.5

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

7.9

29539

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 63 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

79550

1591

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

25

40350

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

25

40950

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

4

128004

32001

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

2

77522

38761

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

800

412480

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

7.9

29539

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

80

129120

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

22

36036

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

63902

31951

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

2

77422

38711

... More
Construction of pipelines for water supply with 250mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.9x1.2m trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

1203850

2407.7

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

257800

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

7.9

29539

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

60

96840

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

81900

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

64290

32145

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

2

77810

38905

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

257800

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

40

64560

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

10

16380

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

64290

32145

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

2

77810

38905

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

800

412480

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

7.9

29539

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

60

96840

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

81900

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

64256

32128

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

1

38888

38888

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

600

358620

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

3.9

14582

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

60

96840

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

81900

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

64256

32128

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

2

77776

38888

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

800

412480

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

7.9

29539

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

60

96840

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

81900

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

64256

32128

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

1

38888

38888

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

257800

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

3.9

14582

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

150

242100

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

112

183456

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

1

32145

32145

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

1

38905

38905

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

650

335140

515.6

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

2

7478

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

17

27438

1614

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

1

32042

32042

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

1

38802

38802

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

600

358620

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

3.9

14582

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

50

80700

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

23

37674

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

64062

32031

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

2

77582

38791

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

3.94

14721

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

30

48420

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

18

29484

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

2

64062

32031

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

1

38791

38791

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1000

515600

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

1200

717240

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

7.9

29539

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

40

64560

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

14

22932

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

4

127804

31951

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

2

77422

38711

... More
Construction of 20 KL capacity OHSR of 9.60 mts staging with M30 grade design mix at the site selected by the Department, as per drawings and as specified in Technical Specification including earth work excavation in all types of soils in wet or dry conditions for foundations including cost and conveyance of all materials, cost and fabrication of steel, fixtures, labour charges and testing the reservoir for water tightness etc., complete for finished item of work as per the Standard Specifications and as per the provisions made in the current SOR . The rate is inclusive of cost of all materials and labour charges and all taxes, duties and levies, etc., complete for finished item of work, but excluding GST and Seigniorage charges, including Overheads and Contractors Profit @13.615%. 1). All concrete members shall be designed with M30 grade design mix. 2) Rate is for OHSRs with RAFT FOUNDATION 3) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir including bottom of roof. 4) Rate inclusive of 2 coats of whether proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections including cost of pipes, bends and valves as per departmental designs and drawings. 5) The above rates are applicable for basic wind speed of 200 KMPH . Fixtures include : a) RCC or Aluminium ladder inside 0.60 m wide. b) Spiral staircase on the outside shall be provided upto 200 KL. c) Lightening arrestor, including conductor and earthling etc.,d) RCC ventilators with copper or stainless steel fly proof mesh. B129 e) D.I Manholes frame and cover 0.60x0.60m as per IS specifications (light duty) - 2 Nos. f)Water level indicator of good quality with ebonite/copper float of approved pattern-1 No. g) The railing provided to the gallery and staircase shall be with stainless steel of grade 304 for a height of 1.20m. i) D.I swan neck ventilators shall be provided in top dome and slab. j). Bed Blocks of 0.45m x 0.45m x 0.30m in CC M15 Mix below all the duck foot bends k) The rates are exclusive of DI verticals for all inlet, out let, overflow and scour connections( as per estimate diameters) and D.I valves. All valves near inlet, out let and for scour shall be D.I valves of heavy duty conforming to the specification of SoR item No.30 SBC@15.00T/Sqm

20

1127082

56354.1

... More
Construction of pipelines for water supply with 75mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

600

309360

515.6

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.70x1.0m trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

298850

597.7

... More
Cutting open Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and controctor's profit @ 13.615% but excluding GST and seignourage charges

1.2

4487

3739.07

... More
Construction of Functional Household Tap Connections (FHTC) on 75 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

30

48420

1614

... More
Construction of Functional Household Tap Connections (FHTC) on 90 mm dia HDPE 6Kg/cm2 pipe line with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 65 to 180mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304 threded insert outlet with threded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia GI pipe Medium Grade as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth) and 12.7mm dia Brass Bib cock(long body) Indian make heavy duty tap excluding GST and seigniorage charges but including contractor' profit & overheads @ 13.615%.

18

29484

1638

... More
Supply delivery and fixing,of DI sluice valve arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (80 mm on 90 mm dia HDPE pipe)

1

31951

31951

... More
Supply delivery and fixing,of DI sluice valve (Scour) arrangement on pipeline including supply of valve with dismantling joint,DI specials to suite pressure class of main line etc including RCC valve chamber as per requirement with RCC slab cover and RCC manhole cover etc complete as directed by the departmental engineers,site requierments etc .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and seigniorage chargesbut including overheads and contractor's profit @ 13.615% .(PartB - Volume I). (Scour Valve on 63-125mm dia HDPE pipe)

1

38711

38711

... More
Construction of pipelines for water supply with 90mm dia, 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, 0.7x1.0m trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including overheads and contractor's profit @ 13.615%

500

233050

466.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.