Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date12 Jan 2025
Closing Date18 Jan 2025
Tender Amount₹ 30,30,662 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing kadapa slab flooring on sand bed including staking at site for re use including all labour charges etc compelte

5.4

10

58.91

... More
Flooring with double charged vetrified tiles 600 x 600 of 1st quality set over base coat of cement mortor (1:8) 12 mm thick over CC bed already laid of RCC roof slab including neat cement slurry of honey like consistency spread @3.3kgs per sqm and joined neately with white cement paste to full depth mixed with pigment of matching shade including cost of materilas like cement sand water and tiles etc compelte

5.4

1009

5450.6

... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete for Bed concrete etc complete

3

4498

13495.71

... More
White Washing two coats with Whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials etc complete

441.8

39

17314.14

... More
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approvedbrand and shade over a base coat of appropriate primer of approved brand, making 3 coats inall to give an even shade after thourughly brushing the surface to remove all dirt and remainsof loose powdered materials, including cost and conveyance of all materials to work site and alloperational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls (BLD-CSTN-10-1) etc complete

441.8

160

70776.36

... More
Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) 28.60mm OD Pipe - SDR 13.5 - BMW-I-222 etc complete

300

252

75669

... More
Supply & Fixing of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian make heavy type-25mm NB size etc complete

10

1323

13236.1

... More
Supply & Fixing 12.7 mm NP stop cock Indian makeheavy duty - MAT-01810 etc complete

20

511

10225.4

... More
Dismantling of existing drain with concrete saw cutter and removal with Breaker including cost and conveyance of all materials and labour charges etc., complete

2.57

3978

10225.52

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated Suitable material as per Technical Specification 305 MORD / 304 MORTH ordianry gravelly soils for foundations SS No.20B. etc complete

8.4

246

2066.99

... More
Sand for filling in foundation treches/basement as per drawing and technical specificationclause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc., complete. For Bed Concrete etc complete

8.4

731

6141.16

... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete for Drain Bed concrete etc complete

8.4

4498

37787.99

... More
Cement Concrete (1:2:4) using concrete mixer with 20mm HBG M/C Metal including cost andconveyance of all materials and all labour charges etc., complete for plain works. (With M20nominal mix cement to be taken as 330 kgs for using 40mm HBT metal in PCC and the sameitem data) (IC 2-11) using concret mixer etc complete for Side Walls of the Drain etc complete

8.4

9621

80822.87

... More
Plastering with CM (1:3) 12mm thick including cost and conveyance of all material, labour charges etc., complete for Drain Bed Concrete etc complete

16

360

5761.76

... More
Supplying & Fixing Orissa Pan white vitreous glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with"P" or "S" trap: 580 mm x 440 mmx260mm etc complete

5

1847

9236.9

... More
Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 40 mmthick conforming to IS:2202 MAT-01347 including all labourcharges etc complete

18

2581

46465.02

... More
Plastering with C.M. (1:3) 12mm thick using 2 % of Acco proof powder including cost andconveyance of all materials, curing and all labour charges etc., complete., (Amendment for labour content given in SOR 2016-17 vide BLD-CSTN 6-1 to 6-8)

240

374

89920.8

... More
Painting to new walls with 2 coats of ready mixed oil bound washable distemper of approvedbrand and shade over a base coat of appropriate primer of approved brand, making 3 coats inall to give an even shade after thourughly brushing the surface to remove all dirt and remainsof loose powdered materials, including cost and conveyance of all materials to work site and alloperational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls (BLD-CSTN-10-1) etc complete

1180

160

189036

... More
Supply Delivery, Laying and jointing of 110 mm 4 diaKg/Cm2 including cost and conveyance of all materials and labour charges including contractor profit @ 13.615% for toilets and down pipes from slab etc

120

211

25388.4

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated Suitable material as per Technical Specification 305 MORD / 304 MORTH etc complete

14.4

246

3543.41

... More
Sand for filling in foundation treches/basement as per drawing and technical specificationclause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc., complete.

3.6

731

2631.92

... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete

3.6

4498

16194.85

... More
RR Masonry in CM (1:8) including cost and conveyance of all materials and labour charges including scaffolding, curing charges etc., complete

12.6

4663

58757.45

... More
Providing and filling murrum / graveaquly soil ( CNS soil ) for roads including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., complete with lead upto 50 m and all lifts. etc complete

127.5

610

77888.47

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated Suitable material as per Technical Specification 305 MORD / 304 MORTH ordianry gravelly soils for foundations SS No.20B. etc complete

12.67

246

3117.71

... More
Sand for filling in foundation treches/basement as per drawing and technical specificationclause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc.,

1.73

731

1264.79

... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete

1.73

4498

7782.53

... More
Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete..

4

8032

32129.08

... More
RCC (1:2:4) for 125mm thick roof slab corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal from approved quarry including cost and conveyance of all materials and including operational incidental, machine mixing, vibrating, curing etc.,complete. but excluding cost of steel and its fabrication charges for finished item of work etc complete

0.78

1426

1112.83

... More
Plastering with CM (1:3) 12mm thick including cost and conveyance of all material, labour charges etc., complete

19.6

360

7058.16

... More
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification etc complete

100

77

7784

... More
Unskilled labour charges for Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, etc complete

37.9

246

9326.05

... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete

1.18

4498

5308.31

... More
Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete..

5.11

8032

41044.9

... More
Collection and Supply of Rough stone 225 mm thick for filling in soak pit including loading, unloading, stacking etc.' complete for finished item of work etc complete

7.2

807

5814.86

... More
Collection and supply of 65m dia Coarse Aggregate including cost and conveyance of all materials etc complete for Bio filter filter Media etc complete

5.85

1048

6133.96

... More
Collection and supply of 40m dia Coarse Aggregate including cost and conveyance of all materials etc complete for Bio filter filter Media etc complete

4.5

1549

6972.89

... More
Collection and supply of 20m dia Coarse Aggregate including cost and conveyance of all materials etc complete for Bio filter filter Media etc complete

2.7

2499

6749

... More
Collection and supply of 12m dia Coarse Aggregate including cost and conveyance of all materials etc complete for Bio filter filter Media etc complete

2.7

2079

5614

... More
Spreading of Coarse aggregate sand in Soil Bio technology filters including all labour charges etc complete.

2.25

1373

3089.99

... More
Supply and cost of 160mm dia PVC single socket 6' length including c/c of all materials etc complete

5

581

2908.55

... More
Laying charges of PVC pipes including all specials and solvent etc complete

5

30

150.6

... More
Supply and gravel filling in basement with watering and tamping including cost & Conveyance of Materials and labour charges etc complete etc.

60

610

36653.4

... More
Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete.Compound Wall

13.8

8032

110845.33

... More
Providing ornamental grill and MS Tubes including cost of grill, welding charges, labour charges etc., complete.,

200

116

23292

... More
Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank of Double layer Roto moulded confirming to IS:12701 approved brand & manufacture with suitable cover/cap and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks - BMW-G.01 for Drinking water supply etc complete

9000

9

86940

... More
Dismantling, clearing away of Old cement mortar plaster and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete

88.38

9

853.75

... More
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approvedbrand and shade over a base coat of appropriate primer of approved brand, making 3 coats inall to give an even shade after thourughly brushing the surface to remove all dirt and remainsof loose powdered materials, including cost and conveyance of all materials to work site and alloperational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls (BLD-CSTN-10-1) etc complete

88.38

160

14158.48

... More
Painting with Epoxy paint two coats over primary coat on new plastered surface includingcost and conveyance of all materials and all labour charges etc., complete., (OD as per Indexcode BLD-CSTN-10-4) etc complete

27

337

9099

... More
Supply and Transportation of 5 HP and 25 Stage submersible motor pumpset, confirming to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump shall be suitable for various delivery head and discharge with stainless steel shaft.Motor suitable for working on 240V ± 10% , Single Phase 50 Hz AC supply,etc complete for 4" Bore well etc complete

1

37392

37392.97

... More
S& F 50 mm Nominal Bore GI pipe Medium Gradeproperties & weight as per IS 1239 ISI mark with GI fittingsincluding the cost of pipe & its fittings & labour charges etc complete

60

737

44262

... More
Supply and Delivery of 4 Sqm 3 core submersible cableWire including cost and conveyance of all materials andlabour charges etc complete

120

193

23178

... More
Fabrication , transportation and supply of suitable size panelboard for single phase submersible motor up to 1.5 HPconsisting of relay, Contactor, starting and runningcapacitors, Voltmeter, Ammeter, indicator lamps, MCB ,on/off switch including supply and fixing of DOL starter etc complete

1

10997

10997.93

... More
Supplying and fixing of Gun metal Gate (GM Peet) valve as per IS-778 class I,Indian make heavy type-50 mm NB size etc complete

1

3974

3974.25

... More
Supplying and fixing of MS Clamp set (2 Nos) suitable for 40mm dia pipe with 8 Nos bolts and nuts etc complete

1

1363

1363.38

... More
Supplying and fixing of Bore Cover etc complete

1

375

375.78

... More
Supply and Fixing of 6 sq mm WPSC (Weather Proof Single Core) ISI Alluminium service Wire. etc complete

100

20

2063

... More
Labour charges for erection of 5 HP Single phase pumpsets including pipe connection for suction and delivery and all labour charges etc., complete

1

6147

6147.71

... More
RR Masonry in CM (1:8) including cost and conveyance of all materials and labour charges including scaffolding, curing charges etc., complete for foundation and basement.bed around Tank etc complete

2.16

4663

10072.71

... More
Supply of 56" (1400mm) Sweep Ceiling Fan, with double ball bearings, but without Regulator. Makes: As per list of recommended brands MAT 03602 ELEC 5.1.5 for Electrification etc complete

14

3280

45920.98

... More
2 Module Modular type electronic step type Fan Regulator MAT 02846 etc complete

15

478

7174.8

... More
Supply and transportation of 120W LED Street light Luminaire made of pressure diecast aluminum body with powder coated, having protective toughened glass, supply input voltage 120 - 270V AC, P.F 0.90, high power LEDs having System Efficacy = 120 lumens/watt and junction temperature 70°C, with Ingress protection IP66, Luminaire performance complies to IS 10322 (Part 5/Sec-3), driver surge protection 4KV, in house additional Surge protection 10 KV with optics distribution, THD10% at 110 Volts AC, driver efficiency 90%, CCT: 3000K - 5700K, minimum CRI70, etc., complete with earth connection and not less than two years warranty. Makes: As per list of recommended brands as category I MAT 03365 etc complete

5

10411

52058.4

... More
Supply of 1.5 sqmm ISI marked FRLS/ FRLS-H / HFFR / ZHFR PVC insulated flexible copper cables 1100V grade as per IS: 694/1990 & IS:17048/2018 specification for copper cable. MAT-02748 etc complete

175

23

4068.75

... More
Supply of ISI marked 20mm outer dia 1.95 -2.1 . heavy grade with IS:9537-part 3 rigid PVC Conduit. MAT-02673 etc complete

175

40

7157.5

... More
Supply of19/20mm dia PVC Junction Boxes confirms to IS : 3419 Makes:-part 3 MAT - 02694 etc complete

10

30

306.8

... More
Supply and fixing of 20W, 2400 lumens, T8 not less than 1100 mm length LED retrofit tube light with aluminum anodized body, input voltage AC 220 -260 Volts, having luminous efficacy =90 lumens/ watt, with PF0.9, surge protection: 2KV, THD10%, with inbuilt driver and frosted cover CCT: 3000K 5700K, minimum CRI70, etc., as per IS 10322 (Part 5/ Sec 1), 2012, complete with earth connection and not less than two years warranty. Makes: As per list of recommended brands as category I etc complete

10

621

6214.7

... More
Supply and delivery of Galvanized Iron fly proof wire mesh of not less than 20 gauge including Cost and connivance of material etc complete. MAT-00884 for Mosquito Proofing

53.04

916

48615.93

... More
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification

400

79

31784

... More
Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 40 mmthick conforming to IS:2202 MAT-01347 for Doors and Windows Repair etc complete

46.35

2581

119647.43

... More
Manufacture, supply, delivery, installation and commissioning of 500 liters per hour water treatment plant (De-flouride plant) with Reverse OsmosisTechnology including packing, transportation, installation, testing as per DIS standards and all othr incidental charges, as per ISI standardspecifications for obtaining quality of treated water as per BIS standards for drinking water in all aspects including cost and conveyance to site of RO& UV Plant, raw water tank, product water tank (steel tank), pump sets and its accessories, inlet and out let connections where ever necessary,plumbing, electrical connections, attending repairs and defects during warranty period of one year, inclussive of all taxes and VAT etc., complete., forfinished item of work but excluding construction of shelter. The plant should be maintained for one month and to be handed over to GramPanchayat. (The rate is approved vide Rc. No: D 10/237/2011 Dated: 07-06-2013 of the Joint Collector, District Purchase Committee, Kurnool subjectto conditions enclosed in the agreement) etc complete

1

178538

178538.02

... More
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification of 60*40 mm MS Tubes etc complete

105

79

8343.3

... More
Roofing with corrugated GI sheets of 0.50mm thick fixed with GI "J" bolts and nuts 8mm dia with bitumen and GI limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete up to a pitch of 60 degrees but excluding cost of purlins, rafters, trusses including all labour charges etc., complete., (As per standard data BLD-CSTN-8-1,2 and 3) Unit = 184.518 Sqm etc complete

288

949

273320.64

... More
Dismantling, clearing away of Reinforced cement concrete (RCC) and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete for Roof Repairs

7.15

2920

20880.57

... More
M 25 for 125mm thick roof slab corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal from approved quarry including cost and conveyance of all materials and including operational incidental, machine mixing, vibrating, curing etc.,complete. but excluding cost of steel and its fabrication charges for finished item of work etc complete

76.65

1426

109357.32

... More
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification etc complete

1000

79

79460

... More
Removing of kadapa slabs flooring on sand bed including stacking at site for re-use including all labour charges etc., complete

57.04

10

622.31

... More
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approvedbrand and shade over a base coat of appropriate primer of approved brand, making 3 coats inall to give an even shade after thourughly brushing the surface to remove all dirt and remainsof loose powdered materials, including cost and conveyance of all materials to work site and alloperational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls (BLD-CSTN-10-1) etc complete

249.86

160

40027.57

... More
Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete..

3.65

8032

29317.79

... More
Flooring withDouble charged vitrified tiles 600x600 of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, but excluding the cost of conveyance of all materials. etc complete

52.2

1009

52689.11

... More
Removing of kadapa slabs flooring on sand bed including stacking at site for re-use including all labour charges etc., complete for Flooring repairs etc complete

177.25

10

1933.8

... More
Flooring withDouble charged vitrified tiles 600x600 of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, but excluding the cost of conveyance of all materials. etc complete

157.25

1009

158723.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.