Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Solid Waste Management
Opening Date20 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 7,04,895 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete (1:4:8)mix.using 40mm.size HB(OTG) metalincluding cost and conveyance of all materials from approvedquarry to work spot and all labour charges,wateringetc.complete, the rate is including contractor's profit & overheads but excluding seigniorage & GST charges. for foundation of platform.

4.2

24182

5757.5

... More
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges,excluding centering, shuttering and including contractor's profit & overheads but excluding seigniorage & GST charges for finished item of work, for columns of platform.

0.97

12493

12879.2

... More
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges,excluding centering, shuttering and including contractor's profit & overheads but excluding seigniorage & GST charges for finished item of work, Plinth beam of platform.

2.18

27068

12416.4

... More
Brick work in CM(1:6)mix.using well burnt country bricks includingcost and conveyance of all materials from approved source towork spot and all labour charges, watering etc., complete for platform.The rate is including contractor's profit & overheads but excluding seigniorage & GST charges.

3.49

28729

8231.8

... More
Flooring with Cement Concrete 1:4:8, using 40mm metal 100mm thick and plastered over with 20 mm thick in CM(1:3) mix including cost and conveyance of all materials and all charges including fixing of standard verticle posts etc. The rate is including contractor's profit & overheads but excluding seigniorage & GST charges.

26.25

24968

9511.5

... More
Plastering with C.M (1:5) 12 mm thick including cost and conveyance of all materials and all labour charges including curing with all water leads etc., complete. The rate is including contractor's profit & overheads but excluding seigniorage & GST charges.

43.73

14678

3356.4

... More
Cost and Supply of FE-500 STEEL as per I.S 1786/1966 and432/part/1966 as amended up to date and fabrication charges ofsteel including cutting rods, tying grills, placing inposition,including cost of binding wire and all labour charges etc.,comple te.The rate is including contractor's profit & overheads but excluding GST charges..

510

44008

86290.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.