Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Opening Date23 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 9,17,666
Costs
EMD
₹ 9,177Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
776073Tender No
114/TO/2024-25, Dt:19-12-2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement concrete (1:4:8) prop mix using 40 mm size HBG metal from approved quarry including cost &conveyance of all materials to site from approved quarry and labour charges for mixing concrete, laying, vibrating, finishing and curing etc using concret mixer etc complete including Overheads & C.Profit @13.615% For Flooring
5.71
6092
34785.89
... More
Reinforced Cement concrete M 20 Nominal Mix (1:1.5:3) prop using 20 mm size HBG metal from approved quarry with useing required quantity of steel for 1 cum of concrete including cost &conveyance of all materials to site from approved quarry and labour charges for centering, Mixing concrete, laying, vibrating, finishing, and curing etc complete using concret mixer etc complete, but excluding cot of steel and its fabication charges etc complete including Overheads & C. Profit @ 13.615% For flooring
4.35
8540
37149.61
... More
RCC M 20 Nominal Mix (1:1.5:3) grade concrete using 20 mm size HBG metal from approved quarry with useing required quantity of steel for 1 cum of concrete including cost &conveyance of all materials to site from approved quarry and labour charges for centering, Mixing concrete, laying, vibrating, finishing, and curing etc complete using concret mixer etc complete, but excluding cot of steel and its fabication charges etc complete including Overheads & C. Profit @ 13.615% For Plinth Beam
1.64
13124
21524.49
... More
RCC M 20 Nominal Mix (1:1.5:3) grade concrete using 20 mm size HBG metal from approved quarry with useing required quantity of steel for 1 cum of concrete including cost &conveyance of all materials to site from approved quarry and labour charges for centering, Mixing concrete, laying, vibrating, finishing, and curing etc complete using concret mixer etc complete, but excluding cot of steel and its fabication charges etc complete including Overheads & C. Profit @ 13.615% For Coloumns
1.37
13399
18356.92
... More
Brick masonary with (1:6) using 2nd class bricks including cost and conveyance of all materials to site from approved quary and labour charges and watering and curing etc. complete. For Basement
2.92
8465
24718.38
... More
Brick masonary with (1:6) using 2nd class bricks including cost and conveyance of all materials to site from approved quary and labour charges and watering and curing etc. complete. For Superstructure
6.96
8465
58917.79
... More
Plastering with CM (1:5) 12mm thick including cost and conveyance of all material to site from approved quary and labour charges watering and curing etc., complete for finished item of work including Overheads & C.Profit @13.615%
174.96
3526
61699.64
... More
Cost and supply of steel FE 500 and its fabrication charges including cutting, bending, tying grills and palcing in postion including cost of binding wire and all sunderies etc., complete as per standard pecifications including Overheads and contractor profit @13.615 %
700
86
60536
... More
White washing with white cement paint two coats including cost and conveyance of all materials to sie and all labour charges etc complet as per standard specifications including Overheads and contractor profit @13.615 %
151.35
474
7187.61
... More
Roofing: - Roofing will be provided with 0.5 mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove. including contractor profit 13.615%
36.85
986
36340.73
... More
Cost and supply of 50 mm dia Class B GI Pipe including cost and conveyance of all materials to site and all labour charges and all sunderies etc completed as per standard pecifications including Overheads and contractor profit @13.615 %
16.5
450
7425
... More
Cost and supply of 40 mm dia Class B GI Pipe including cost and conveyance of all materials to site and all labour charges and all sunderies etc completed as per standard pecifications including Overheads and contractor profit @13.615 %
33.5
346
11591
... More
Labour charges for Fixing opf GI Pipe & Sheet with necessary specials including cost and conveyance of all materials etc completed as per standard pecifications including Overheads and contractor profit @13.615 % FOR CARPENTER
4
903
3612.96
... More
Labour charges for Fixing opf GI Pipe & Sheet with necessary specials including cost and conveyance of all materials etc completed as per standard pecifications including Overheads and contractor profit @13.615 % FOR MAN MAZDOOR
5
676
3380.05
... More
cost & Supply of RCC jalis of 25 mm thick including cost and conveyance of all materials etc completed as per standard pecifications including Overheads and contractor profit @13.615 %
5.4
256
1386.56