Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Opening Date2 Jul 2024
Closing Date16 Jul 2024
Tender Amount₹ 9,43,562 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete (1:4:8) prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete including Overheads & C.Profit @13.615% For Flooring

3.5

20361

5817.4

... More
Cement concrete (1:1.5:3)prop using 20 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete including Overheads & C.Profit @13.615% For columns

1.2

16225

13520.9

... More
M30 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For Plinth Beam

2.7

34517

12784.2

... More
Construction of brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete.

2.9

25061

8641.8

... More
VCC(1:2:4) using 20mm HBG metal including cost and conveyance of all the materials labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For Flooring

3.22

24816

7706.9

... More
Plastering with CM (1:5) 12mm thick including cost and conveyance of all material, labour charges etc., complete including Overheads & C.Profit @13.615%

18.87

7299

3867.8

... More
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard pecifications including Overheads and contractor profit @13.615 %

735

65378

88.95

... More
VRCC(1:1.5:3) using 20 mm HG metal from approved quary with required quantity of steel for 1cum of concrete including cost and conveyance, charges of all materials to site and all labour charges for centering, mixing, laying, finishing and curing etc., but excluding cost of steel and its fabirication charges etc., complete including contractor profit 13.615%, For columns

4.05

54760

13520.9

... More
Supply and fixing of GI Sheet of 26 Gauge GI Sheet including cost and conveyance of all materils to site and all labour charges etc complete for j bolts and nuts and purlines etc complete (4.42 Kg/1 sqm)0.50 mm- 150 GSM including contractor profit 13.615%

75

71237

949.82

... More
Cost and supply of MS pipes for top of the slab Calss C pipes including cost and conveyance of all materials to site and all labour charges etc complete including contractor profit 13.615%

1103.28

102782

93.16



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.