Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Opening Date2 Jul 2024
Closing Date16 Jul 2024
Tender Amount₹ 9,43,562
Costs
EMD
₹ 9,436Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
740990Tender No
7/TO/2024-25, Dt:20-06-2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cement concrete (1:4:8) prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete including Overheads & C.Profit @13.615% For Flooring
3.5
20361
5817.4
Cement concrete (1:1.5:3)prop using 20 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete including Overheads & C.Profit @13.615% For columns
1.2
16225
13520.9
M30 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For Plinth Beam
2.7
34517
12784.2
Construction of brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete.
2.9
25061
8641.8
VCC(1:2:4) using 20mm HBG metal including cost and conveyance of all the materials labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For Flooring
3.22
24816
7706.9
Plastering with CM (1:5) 12mm thick including cost and conveyance of all material, labour charges etc., complete including Overheads & C.Profit @13.615%
18.87
7299
3867.8
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard pecifications including Overheads and contractor profit @13.615 %
735
65378
88.95
VRCC(1:1.5:3) using 20 mm HG metal from approved quary with required quantity of steel for 1cum of concrete including cost and conveyance, charges of all materials to site and all labour charges for centering, mixing, laying, finishing and curing etc., but excluding cost of steel and its fabirication charges etc., complete including contractor profit 13.615%, For columns
4.05
54760
13520.9
Supply and fixing of GI Sheet of 26 Gauge GI Sheet including cost and conveyance of all materils to site and all labour charges etc complete for j bolts and nuts and purlines etc complete (4.42 Kg/1 sqm)0.50 mm- 150 GSM including contractor profit 13.615%
75
71237
949.82
Cost and supply of MS pipes for top of the slab Calss C pipes including cost and conveyance of all materials to site and all labour charges etc complete including contractor profit 13.615%
1103.28
102782
93.16
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements