Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Civil Works Others
Opening Date18 Nov 2024
Closing Date26 Nov 2024
Tender Amount₹ 16,66,877
Costs
EMD
₹ 16,669Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
766121Tender No
26/2024-25 Dt.12.09.2024 of the EE RWSS NELLORETender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Repairs and Renewals :
-
-
-
... More
Labour charges for Leakage in the existing 300mm dia MS Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.
6
2639
15839
... More
Labour charges for Leakage in the existing 250mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.
12
5771
69258
... More
Labour charges for Leakage in the existing 200mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.
9
4136
37231
... More
Labour charges for Leakage in the existing 160mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.
10
3613
36134
... More
Labour charges for Leakage in the existing 140mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.
9
2475
22284
... More
Labour charges for Leakage in the existing 110mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.
8
2135
17087
... More
Labour charges for Leakage in the existing 90mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.
7
1487
10412
... More
Labour charges for Leakage in the existing 75mm dia 6Kg/cm2 PVC Pipe lines of different places including necessary trench excavation by manual in all soils, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipe line & removing piece of pipe from trench with inclusive of mechanical deviced JCB, Hydralic Crane if necessary & labours required with providing material such Turened CID joints with Nut bolt, Ribber rings, lowering, laying and jointuing of pipeline to allgnment and gradient, refilling trench with excavated earth as per specification, watering and tampering and removing surpules earth from site of work, filling of water in the pipe line as per specification etc.complete. The rates are incluslve of cost & conveyence of all materiels and all labour charges etc.complete (excluding cost of Pipe) for finished item of work.
9
1471
13243
... More
Rewinding of Three phase Monoblock Pumpset with Cu wire including all necessary material and of the same characteristics as original with required size of super enameled wire 'E' class insulation material and testing etc.complete for finished item of work - At Intake Well 7.50 HP.
2
3900
7800
... More
Supply & Delivery of Tamper Proof DI Flanged Single Chamber Air Release Valves with body & cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS:1865, IS:3896-2 with Food Grade Epoxy Powder Coating (EP-P) (Min:250 Micron) inside and outside of Color Blue RAL 5005. All internal parts such as Float, shell, Cover Bolts etc. made of Austenitic alloy steel of SS AISI 304/316 and DN 50 float of other compon ents with ABS/PTFE/ EPDM/NBR and generally confirming to DIN/BIS/AWWA Standards (or) combination Flange drilling as per IS-1538 excluding all taxes, duties and including transportation charges and fixing labour charges etc.complete - 80mm dia DI Air Valve - on 300mm dia Pipeline.
4
28631
114524
... More
Labour charges for cleaning of sumps/GLBR including cleaning and removal of algae, calcinations, sludge, dirt, deposition from side walls and bottom portion of the container by disfenction with bleaching powder with all necessary tools, plants labour charges and cost of disinfectant etc., As per Approved Data (Annexure - VIII) shall not exceed 4 times - at 300 KL Sump at Cherlosangam 4.00 MLD RSF Head works.
734.85
82
6025.8
... More
Providing for Capacitors as per Approved Data
42
425
17875
... More
(15 - Items) -------- Total : Rs.
-
-
1666876.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements