Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Opening Date23 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 10,91,376 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete (1:4:8) prop mix using 40 mm size HBG metal from approved quarry including cost &conveyance of all materials to site from approved quarry and labour charges for mixing concrete, laying, vibrating, finishing and curing etc using concret mixer etc complete including Overheads & C.Profit @13.615% For Flooring

5.71

5753

32853.06

... More
Reinforced Cement concrete M 20 Nominal Mix (1:1.5:3) prop using 20 mm size HBG metal from approved quarry with useing required quantity of steel for 1 cum of concrete including cost &conveyance of all materials to site from approved quarry and labour charges for centering, Mixing concrete, laying, vibrating, finishing, and curing etc complete using concret mixer etc complete, but excluding cot of steel and its fabication charges etc complete including Overheads & C. Profit @ 13.615% For flooring

4.35

8365

36388.92

... More
RCC M 20 Nominal Mix (1:1.5:3) grade concrete using 20 mm size HBG metal from approved quarry with useing required quantity of steel for 1 cum of concrete including cost &conveyance of all materials to site from approved quarry and labour charges for centering, Mixing concrete, laying, vibrating, finishing, and curing etc complete using concret mixer etc complete, but excluding cot of steel and its fabication charges etc complete including Overheads & C. Profit @ 13.615% For Plinth Beam

1.64

13278

21777.33

... More
RCC M 20 Nominal Mix (1:1.5:3) grade concrete using 20 mm size HBG metal from approved quarry with useing required quantity of steel for 1 cum of concrete including cost &conveyance of all materials to site from approved quarry and labour charges for centering, Mixing concrete, laying, vibrating, finishing, and curing etc complete using concret mixer etc complete, but excluding cot of steel and its fabication charges etc complete including Overheads & C. Profit @ 13.615% For Coloumns

1.37

13676

18737.08

... More
Brick masonary with (1:6) using 2nd class bricks including cost and conveyance of all materials to site from approved quary and labour charges and watering and curing etc. complete. For Basement

2.92

8354

24396.02

... More
Brick masonary with (1:6) using 2nd class bricks including cost and conveyance of all materials to site from approved quary and labour charges and watering and curing etc. complete. For Superstructure

6.96

8354

58149.41

... More
Plastering with CM (1:5) 12mm thick including cost and conveyance of all material to site from approved quary and labour charges watering and curing etc., complete for finished item of work including Overheads & C.Profit @13.615%

174.96

3918

68554.58

... More
Cost and supply of steel FE 500 and its fabrication charges including cutting, bending, tying grills and palcing in postion including cost of binding wire and all sunderies etc., complete as per standard pecifications including Overheads and contractor profit @13.615 %

700

89

62548.5

... More
White washing with white cement paint two coats including cost and conveyance of all materials to sie and all labour charges etc complet as per standard specifications including Overheads and contractor profit @13.615 %

151.35

556

8416.57

... More
Roofing: - Roofing will be provided with 0.5 mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove. including contractor profit 13.615%

36.85

986

36340.73

... More
Cost and supply of 50 mm dia Class B GI Pipe including cost and conveyance of all materials to site and all labour charges and all sunderies etc completed as per standard pecifications including Overheads and contractor profit @13.615 %

16.5

450

7425

... More
Cost and supply of 40 mm dia Class B GI Pipe including cost and conveyance of all materials to site and all labour charges and all sunderies etc completed as per standard pecifications including Overheads and contractor profit @13.615 %

33.5

346

11591

... More
Labour charges for Fixing opf GI Pipe & Sheet with necessary specials including cost and conveyance of all materials etc completed as per standard pecifications including Overheads and contractor profit @13.615 % FOR CARPENTER

4

1106

4426.44

... More
Labour charges for Fixing opf GI Pipe & Sheet with necessary specials including cost and conveyance of all materials etc completed as per standard pecifications including Overheads and contractor profit @13.615 % FOR MAN MAZDOOR

5

811

4056.05

... More
cost & Supply of RCC jalis of 25 mm thick including cost and conveyance of all materials etc completed as per standard pecifications including Overheads and contractor profit @13.615 %

5.4

256

1386.56

... More
Cost and supplyHDPE pipe PE 100 PN 6 DN 90, 90 mm dia from approved firm to work spot and all labour charges etc complete including Overheads and contractor profit @13.615 %

350

249

87290

... More
Earth work excavation of pipe line trench including Lowering, Laying, Jointing and Testing of HDPE Pipe lines for water supply with HDPE PE-100 grade pipes as per IS specifications, with its amendments and revisions thereon with buttfushion welding with pipes, necessary specials such as bends, Tees, etc. lowering pipes in ready made trench true to alignment and gradient and laying and jointing with necessary specials such as bends, Tees, etc,.. the trench excavation for pipelines using 2/3rd Machinery + 1/3rd Manual in all tye of soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete. The rates are inclusive of cost and conveyance of all materialsto site and all labour charges for finished item of pipeline work, excluding cost of pipe, including cost of necessary specials, but excluding GST and including Over Heads and Contractors profit @ 13.615% for DN 110 PN-6 HDPE Pipe Line (trench size 0.70X1.00M)

350

234

81935



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.