Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date27 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 27,15,781 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick Masonry in cm (1;6) mix with using 2 nd class country bricks cost and conveyance of all Materials all labour charges etc complete. for side walls .

13.63

8300

113137.18

... More
Plastering with CM (1:5) 12mm thick including cost and conveyance of all material, labour charges etc., complete

315.14

3516

110803.22

... More
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification

4750

86386

410333.5

... More
Painting with emulsion paint 2 coat over a primary coat of white emulusion paint including cost and conveyance of all materials and all labour charges etc complete

447.62

2015

90208.86

... More
Cost and supply of 50 mm x50 mm Box type and welding rads and including fabrication charges etc Complete.

1687.5

82977

140024.7

... More
Cost and supply of hot dipped Galvanised iron chain mesh 8 gauge-(4.00mm as per IS ;2721-1979;3'x3'(75 mm x75)-8 Gauge and including fabrication charges etc Complete.

198

646

128001.06

... More
Labour charges for fixing of hot dipped Galvanised iron chain mesh 8 gauge-(4.00mm as per IS ;2721-1979;3'x3'(75 mm x75)-8 Gauge and including fabrication charges etc complete Welders

10

732

7328.2

... More
Labour charges for fixing of hot dipped Galvanised iron chain mesh 8 gauge-(4.00mm as per IS ;2721-1979;3'x3'(75 mm x75)-8 Gauge and including fabrication charges etc complete Helpers

10

676

6760.1

... More
Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc.,complete with initial lead upto 1 km and all lifts.

123.12

131

16240.76

... More
Filling of Gravel in foundation and basement including cost and cony. of sand from approved source and all labour charges etc.complete -- 1 cum

82.08

1217

99932.4

... More
Construction of Pipe line of various diameter, classes for distribution and pumping mains of water supply including earth work excavation, cost and supply of pipe, laying and jointing of pipe line etc. complete item of work for 1.00 Rmt. (Electrical poles ,Trees , existing pipe line and Telphone Cable etc. (100% manual labour ) DN 90 PN-6 HDPE PIPE LINE

600

607

364260

... More
Construction of Pipe line of various diameter, classes for distribution and pumping mains of water supply including earth work excavation, cost and supply of pipe, laying and jointing of pipe line etc. complete item of work for 1.00 Rmt. (Electrical poles ,Trees , existing pipe line and Telphone Cable etc. (100% manual labour ) DN 110 PN-6 HDPE PIPE LINE

650

747

486070

... More
(Rupees Twenty seven Lakhs Fifteen thousand Seven hundred eighty and Sixty seven Paisa only)

-

-

2715780.67



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.