Panchayat Raj Engineering Department Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Excavation
Opening Date15 Mar 2025
Closing Date29 Mar 2025
Tender Amount₹ 5,28,846
Costs
EMD
₹ 5,288Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
790763Tender No
08/ATO/ 2024-25, Dt: 06.03.2025 of the Executive Engineer,RWS&s Division,Bapatla.Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
C.C(1.4:8) mix with 40mm HBG metal including cost and conveyance of all materials and all labour charges
7.02
4211
29564
... More
Brick masonry in C.M (1:6) using flyash cement solid blocks of size 290x200x140mm including cost and conveyance of all materials and all labour charges etc.,complete
15.22
5861
89213
... More
Plastering in C.M (1:5) 12mm thick including cost and conveyance of all materials and all labour charges
57.21
4213
24106
... More
Flooring with CM(1:3) prop 20 mm thick over bed of 100 mm thick, CC (1:4:8) prop using 40mm HG metal including cost and conveyance of all materials and seignorage charges etc., complete.
39.6
7505
29723
... More
Painting with White cement two coats including cost and conveyance of all materials and labour charges etc., complete
57.21
474
2717
... More
Cost, supply and fixing of Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape.The sheets are provided with anti capillary grove.
43.89
986
43283
... More
Drilling of 165 mm dia Bore well clear in all strata including fixing of casing pipe, yield charges, crew charges, cost of consumables, conveyance etc., complete for Bore well source
-
-
-
... More
Bore well depth upto 90m
90
559
50324
... More
Cost and supply of 180 mm OD 6 kg/cm² PVC Pipe for bore well casing etc., complete
12
749
8998
... More
Cost and supply of the following 1.00 HP/15 stages single phase submersible Pump set and its accessories etc,complete
1
20621
20621
... More
Cost and supply of the following Control Panel Board with all accessories etc,complete
1
6186
6186
... More
Cost and supply of the 32 mm dia HDPE 10 Kg/cm2 pipes including cost and conveyance of all materials and labour charges etc., complete
165
4885
8060
... More
Cost and supply of the 3 core 2.5 Sqmm flat copper cable including cost and conveyance of all materials and labour charges etc., complete
80
154
12362
... More
Cost and supply of the 32 mm dia MS Clamp set, including cost and conveyance of all materials and labour charges etc., complete
2
208
416
... More
Cost and supply of the 180 mm dia PVC Bore cap, including cost and conveyance of all materials and labour charges etc., complete
1
375
376
... More
Cost and supply of the 7/16 alluminium service wire including cost and conveyance of all materials and labour charges etc., complete
90
32
2880
... More
Laying, jointing of PVC/HDPE pipes as per BIS No. 7634 part 111/75 for PVC and BIS No.7634 part-II/75 for HDPE pipes including trench excavation and refilling for 32 mm dia HDPE 10 Kg/cm2 pipes including cost and conveyance of all materials and labour charges etc., complete
90
55
5010
... More
Errection charges of 1.00 HP /15 Stages single Phase Submercible Pumpset using required accessories including all labour charges etc. complete.
1
4000
4000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements