Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Water Storage And Supply
Opening Date29 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 34,52,192
Costs
EMD
₹ 34,530Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
746187Bid Award Id
ViewTender No
No.30/2024-25, Dt.03-07-2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cost and supply of 315 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
24
37952
1581.35
Cost and supply of 250 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
36
34634
962.07
Cost and supply of 200 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
12
7436
619.74
Cost and supply of 160 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
12
4807
400.61
Cost and supply of 140 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
1827
304.56
Cost and supply of 110 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
1117
186.25
Cost and supply of 90 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
772
128.74
Repair to 315 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
12
103462
8621.9
Repair to 250 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
22
127061
5775.5
Repair to 200 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
6
24850
4141.7
Repair to 160 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
5
18067
3613.4
Repair to 140 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
3
7434
2478
Repair to 110 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
4
8550
2137.7
Repair to 90 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
4
5954
1488.5
Hiring of shovel 0.5 cum 75 HP capacity including cost of crew charges and oil charges and all labour charges etc. complete for finished item of work
90
199914
2221.27
(Rupees Thirty Four Lakhs Fifty Two Thousand One Hundred Ninety One and Paise Ninety Six only)
-
3452191
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements