Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Jan 2023
Closing Date10 Feb 2023
Tender Amount₹ 6,96,67,559 
Notes
Download

Costs

Summary

Package No.5a4/aprrp/ Pred/vzm/road/001, Consists Of 3 Road Works In Komarada Mandal In Vizianagaram Dist. (1st Call)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying existing granular surface to a depth of 50 mm and reuse the material at site as per Technical Specification Clause 305.4.3 MoRTH including 13.615% over head charges & contractors profit but excluding VAT and seigniorage Charges.

6900

-

19.85

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

2700

-

75.95

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,and Seigneorage etc. complete.

1530

-

178.97

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

804.38

-

313.05

... More
Construction of granular sub-base by providing well graded HBG M/C material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, including overhead charges & Contractors profit but excluding GST and Seignorage charges etc., complete for finished item of work.

821.89

-

2349.1

... More
Providing, laying, spreading and compacting HBG graded machine crushed stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

752.05

-

3103.56

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

3613.5

-

32.87

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

3613.5

-

9.29

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using HBG crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

90.34

-

8199.03

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick , including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, primer, sealant, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.25 mts joint spacing)

420.98

-

6573.03

... More
Construction of 1000 mm dia RCC Pipe culverts with 3 mts height of body wall - 4 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

193.96

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

48.92

-

4750.77

... More
Providing concrete for plain concrete M15 (Normal mix) in Head walls using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Head walls

97.32

-

5065.84

... More
Providing and laying 1000 mm dia NP3 Reinforced Cement Concrete Socket and spigot pipes confirming to BIS 458/2003 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work.

30

-

7664.76

... More
Construction of 2.00 mts span RCC slab culvert - 1 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

148.6

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

22.29

-

4750.77

... More
Providing concrete for plain concrete M15 (Normal mix) in Abutments using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Abutments

74.45

-

5065.84

... More
Providing plain concrete M 20 grade (Design Mix) in Substructure using 40, 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST and seigniorage charges and cost of Steel etc complete for finished item of work.

69.26

-

6445.67

... More
Providing concrete for reinforced concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm HBG Machine crushed (SS5) Graded stone aggregate, mechanically mixed, and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST and seignorage charges and cost of Steel etc. complete for finished item of work for bed blocks & Backing walls

3.99

-

6837.63

... More
VRCC concrete M-25 grade (Design mix) for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 including over head charges & contractors profit excluding GST and seignorage charges for finished item of work for Deck slab

4.68

-

7459.25

... More
Providing and laying cement concrete wearing course M 30 grade design mix with HBG M/C metal including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH including cost, all labour charges for all operations etc complete but excluding steel and its fabrication charges, GST, Seignorage Charges etc complete for finished item of work

1.46

-

6493.42

... More
Cost, supply and fixing of Bituminous Mastic pad 25.40 mm thick including cost and conveyance of all material and all labour charges including contractors profit & over heads, but excluding GST etc complete for finished item of work.

3.6

-

953.23

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost, all labour charges for all operations excluding GST etc complete for finished item of work for Superstructure

0.85

-

54529.29

... More
Providing weep holes in plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe 6kg/cm2 extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 1206.6 MORD including cost of materials, conveyance, royalty, OH & CP, taxes, labour, T&P etc ,including overhead charges & Contractors profit, excluding GST etc., complete as per the direction of Engineer-in-charge

52

-

192.87

... More
Construction of Retaining wall

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

78

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

15.6

-

4750.77

... More
Providing concrete for plain concrete M15 (Normal mix) in Retaining wall body walls using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Retaining wall body walls

67.2

-

5358.11

... More
Providing weep holes in plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe 6kg/cm2 extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 1206.6 MORD including cost of materials, conveyance, royalty, OH & CP, taxes, labour, T&P etc ,including overhead charges & Contractors profit, excluding GST etc., complete as per the direction of Engineer-in-charge

50

-

192.87

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

3

-

2352.09

... More
Providing and fixing of Hectometre stones precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

7

-

635.03

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work 600 mm Circular sign boards

10

-

2040.82

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work 600 mm Equilateral triangle sign boards

21

-

1947.21

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work Rectangular board of size 800 x 600 mm

4

-

2227.71

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3460.77

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

3.24

-

1733.31

... More
2.Construction of Road from Kemiseela to Gajulaguda in Komarada Mandal of Vizianagaram District

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

1746

-

2

... More
Scarifying existing granular surface to a depth of 50 mm and reuse the material at site as per Technical Specification Clause 305.4.3 MoRTH including 13.615% over head charges & contractors profit but excluding VAT and seigniorage Charges.

3880

-

19.85

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,and Seigneorage etc. complete.

2816.25

-

178.97

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

545.63

-

274.54

... More
Construction of granular sub-base by providing well graded HBG M/C material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, including overhead charges & Contractors profit but excluding GST and Seignorage charges etc., complete for finished item of work.

544.76

-

2212.63

... More
Providing, laying, spreading and compacting HBG graded machine crushed stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

504.09

-

2952.3

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

2818.75

-

32.97

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

2818.75

-

9.33

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using HBG crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

70.49

-

8045.9

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick , including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, primer, sealant, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.25 mts joint spacing)

263.5

-

6437.96

... More
Construction of 600 mm dia RCC Pipe culverts with 3 pipes - 1 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

47.88

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

15.72

-

4619.57

... More
Providing concrete for plain concrete M15 (Normal mix) in Head walls using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Head walls

32.48

-

4939.24

... More
Providing and laying 600 mm dia NP3 Reinforced Cement Concrete Socket and spigot pipes confirming to BIS 458/2003 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work.

15

-

3424.76

... More
Construction of 1000 mm dia RCC Pipe culverts with 5 mts height of body wall -

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

48.49

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

12.23

-

4619.57

... More
Providing concrete for plain concrete M15 (Normal mix) in Head walls using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Head walls

24.33

-

4939.24

... More
Providing and laying 1000 mm dia NP3 Reinforced Cement Concrete Socket and spigot pipes confirming to BIS 458/2003 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work.

7.5

-

7926.05

... More
Construction of 6.00 mts span TWO VENT RCC slab culvert - 1 No

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

835.37

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

80.25

-

4619.57

... More
Providing concrete for plain concrete M15 (Normal mix) in Abutments using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Abutments

369.18

-

4939.24

... More
Providing and laying reinforced cement concrete M20 grade (Design Mix) using 40,20 & 10mm metal (HBG) nominal sized graded had stone aggregate mechanically mixed placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 and 1203 MORD and 1500, 1700 and 2100 MORTH including form work, overhead charges & Contractors profit, excluding GST and seigniorage charges etc., complete for finished item of work

399.08

-

6301.35

... More
Providing concrete for reinforced concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm HBG Machine crushed (SS5) Graded stone aggregate, mechanically mixed, and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST and seignorage charges and cost of Steel etc. complete for finished item of work for bed blocks & Backing walls

9.17

-

6693.33

... More
VRCC concrete M-25 grade (Design mix) for Super Structure with 20 mm(SS5) HBG M/c graded metal with a cube strength of 25 N/mm2 at 28 days work test on 150 X 150 X 150 mm cubes and cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per MoRT&H spcn. No. 1500, 1600 & 1700 including over head charges & contractors profit excluding GST and seignorage charges for finished item of work for Deck slab

50.4

-

7301.81

... More
Providing and laying cement concrete wearing course M 30 grade design mix with HBG M/C metal including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH including cost, all labour charges for all operations etc complete but excluding steel and its fabrication charges, GST, Seignorage Charges etc complete for finished item of work

8.21

-

6358.29

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH including overhead charges & Contractors profit but excluding cost of steel, GST and Seignorage charges etc. complete.

13.4

-

4844.25

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick , including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, primer, sealant, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.25 mts joint spacing) FOR APPROACH SLAB

20.1

-

6437.96

... More
Cost, supply and fixing of Bituminous Mastic pad 25.40 mm thick including cost and conveyance of all material and all labour charges including contractors profit & over heads, but excluding GST etc complete for finished item of work.

10.8

-

953.23

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost, all labour charges for all operations excluding GST etc complete for finished item of work for Sub structure

1.3

-

53078.43

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost, all labour charges for all operations excluding GST etc complete for finished item of work for Superstructure

6

-

54529.29

... More
Providing weep holes in plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe 6kg/cm2 extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 1206.6 MORD including cost of materials, conveyance, royalty, OH & CP, taxes, labour, T&P etc ,including overhead charges & Contractors profit, excluding GST etc., complete as per the direction of Engineer-in-charge

99

-

192.87

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC78 including cost of materials, conveyance, royalty, taxes, labour, T&P etc complete as per the direction of Engineer-in-charge (RBR-SBST-11)

60.48

-

976.28

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of kilometre stones precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

3

-

2315.35

... More
Providing and fixing of Hectometre stones precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

4

-

628.5

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work 600 mm Circular sign boards

8

-

2024.87

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work 600 mm Equilateral triangle sign boards

14

-

1931.26

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work Rectangular board of size 800 x 600 mm

2

-

2211.75

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3425.31

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

2.16

-

1715.59

... More
3.Construction of road from Kurupam-Kimiseela R&B Road to Ravikona via Palem, Kumbhikota of Komarada mandal

-

-

-

... More
ROAD PORTION

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (in area of non thorny /light jungle) as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding GST and Seignorage charges etc., complete for finished item of work.

8928

-

2

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

24800

-

19.85

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seignorage charges etc., complete for finished item of work.

15249.29

-

75.95

... More
Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with all lifts and lead beyond 100 m & upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH including over head charges&contractors profit but excluding GST and Seignorage Charges.

3429.34

-

153.88

... More
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.

3487.5

-

300.22

... More
Construction of granular sub-base by providing well graded HBG M/C material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, including overhead charges & Contractors profit but excluding GST and Seignorage charges etc., complete for finished item of work.

3775.96

-

2200.22

... More
Providing, laying, spreading and compacting HBG graded machine crushed stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

3555.46

-

2938.55

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

21153

-

32.93

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

21153

-

9.31

... More
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using HBG crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.

528.84

-

8025.57

... More
Construction of un-reinforced, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick , including levelling the formwork as per drawing) spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction joints @3.25 m spacing , construction joints, primer, sealant, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and including overhead charges & Contractor profit, but excluding GST and Seignorage Charges etc., complete for finished item of work. (3.25 mts joint spacing)

573.76

-

6403.6

... More
Construction of 1000 mm dia RCC Pipe culverts-2 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

87.9

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

23.06

-

4586.24

... More
Providing concrete for plain concrete M15 (Normal mix) in Head walls using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Head walls

42.02

-

4903.98

... More
Providing and laying 1000 mm dia NP3 Reinforced Cement Concrete Socket and spigot pipes confirming to BIS 458/2003 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work.

15

-

7898.22

... More
Construction of 600 mm dia RCC Pipe culverts-22 Nos

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

526.68

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

172.92

-

4586.24

... More
Providing concrete for plain concrete M15 (Normal mix) in Head walls using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Head walls

357.28

-

4903.98

... More
Providing and laying 600 mm dia NP3 Reinforced Cement Concrete Socket and spigot pipes confirming to BIS 458/2003 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding GST and seigniorage charges for finished item of work.

165

-

3410.66

... More
Construction of Retaining wall

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

1519.2

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

303.84

-

4586.24

... More
Providing concrete for plain concrete M15 (Normal mix) in Retaining wall body walls using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Retaining wall body walls

1670.7

-

4903.98

... More
Providing weep holes in plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe 6kg/cm2 extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 1206.6 MORD including cost of materials, conveyance, royalty, OH & CP, taxes, labour, T&P etc ,including overhead charges & Contractors profit, excluding GST etc., complete as per the direction of Engineer-in-charge

526

-

192.87

... More
Protective works to existing piped causeway

-

-

-

... More
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including all incidental charges i.e bailing out water etc including overhead charges & Contractors profit but excluding GST and Seignorage Charges

108

-

94.97

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size HBG M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

88.2

-

4586.24

... More
Providing concrete for plain concrete M15 (Normal mix) in Retaining wall body walls using 40, 20 & 10mm size HBG machine crushed (SS5) graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Retaining wall body walls

81.42

-

4903.98

... More
Providing concrete for Plain concrete M 20 grade (Design Mix) in Substructure using 20 & 10 mm HBG Machine crushed (SS5) Graded stone aggregate, mechanically mixed, and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST and seignorage charges etc. complete for finished item of work for bed appron

72

-

5992.41

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & over head charges, cost of steel and its fabrication charges, but excluding GST and seigniorage charges etc complete for finished item of work.

135

-

1867.92

... More
ROAD SAFETY INTERVENTIONS

-

-

-

... More
Providing and fixing of 5 th kilometre stones precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

1

-

3867.07

... More
Providing and fixing of kilometre stones precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

6

-

2306.02

... More
Providing and fixing of Hectometre stones precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

25

-

626.84

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work 600 mm Circular sign boards

18

-

2020.43

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work 600 mm Equilateral triangle sign boards

43

-

1926.82

... More
Providing and erecting direction and place identification of semi reflective sign boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two nos. of47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-15grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work for main information board of size 1500 x 1200 mm

1.8

-

3415.44

... More
Providing and erecting direction and place identification of semi reflective Village boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work of village boards of size 900 x 600 mm

3.24

-

1710.66

... More
Providing, laying, spreading and compacting HBG graded machine crushed stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work for speed breaker

6.47

-

2938.55



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.