Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date29 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 36,82,402 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cost and supply of 315 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.

8

12650

1581.35

... More
Cost and supply of 250 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.

12

11544

962.07

... More
Cost and supply of 200 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.

8

4957

619.74

... More
Cost and supply of 180 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.

8

4091

511.4

... More
Cost and supply of 160 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.

12

4807

400.61

... More
Cost and supply of 140 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.

16

4872

304.56

... More
Cost and supply of 110 mm dia PVC Pipes 4 Kg/cm2 excluding all taxes and conveyance charges etc complete.

12

2235

186.25

... More
Repair to 315 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

4

34487

8621.9

... More
Repair to 250 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

6

34653

5775.5

... More
Repair to 180 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

4

14821

3705.4

... More
Repair to 160 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

6

21680

3613.4

... More
Repair to 140 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

8

19824

2478

... More
Repair to 110 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)

6

12826

2137.7

... More
Rewinding charges of 20 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications

2

41627

20813.58

... More
Rewinding charges of 15 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications

2

34689

17344.65

... More
Rewinding charges of 7.50 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications

2

15032

7516.02

... More
Cleaning of OHBR,Sump, V-Notch and micro filter etc at Head Work site including all charges etc., complete

2130

17466

82

... More
Labour charges for Scrapping of Old Clotted sand in SS Filters for 2 Filters of each size 20.00 x 15.00 Mts

240

44268

184.45

... More
Labour charges for Washing and refilling of Old fine sand into the Filters for 2 Filters of each size 20.00 x 15.00 Mts

150

234507

1563.38

... More
Rupees Thirty Six Lakhs Eighty Two Thousand Four Hundred Two And Paise Zero Three Only

-

3682402

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.