Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Eprocure
Opening Date10 Jul 2018
Closing Date18 Jul 2018
Tender Amount₹ 10,53,51,414 
Notes
Download

Costs

Summary

Tender for Package No.AP2018P7 Consists of 5 works (One work in G.L.Puram (M), One work in Komarada (M), One work in Kurupam .

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

12583.39

851895

67.7

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

2781

445516

160.2

... More
Scarifying existing granular surface to a depth of 50 mm and spreading scarified material in uniform layers with Tractor grader and compacting with Vibratory Roller to achieve the desired density as per Technical Specification Clause 301.9 of MORD ,including contractors profit & Over head charges, but excluding GST etc., complete.

15592

332109

21.3

... More
Waterproofing on top of the sub Grade soil base with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge. including contractors profit & Over head charges, but excluding GST etc., complete

29250

324675

11.1

... More
Stabilized Sub base / Base for flexible payment : Providing, laying, Spreading and compacting in-situ 70% Soil of CBR 5% mixed with 30% of GSB Grade-II material as per mix design. Rip and loosen the soil with tractor operated ripper / rotavator and add the GSB as per mix design. Spread cement @ 3% of MDD of Mix (soil + GSB) in the soil and mix uniformly by rotavator. Apply 1.0 kg/cum of Nano technology silane and 1.0 kg/cum of nano acrylic Co-Polymer with OMC water (1000 ppm TDS) on loose soil-aggregate-cement mix. Mix throughly using the Ripper and Rotavator. Grade the soil with Motor grader.Compact the soil-aggregate surface with 8 to 10 tonne vibratory power roller to achieve the desired density.Rates including all materials, labour, hire Charges of machery etc. complete as per MORD specifications & direction of Engineer-in-Charge, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

3584.16

6551844

1828

... More
Providing , Laying, Spreading of Grit of size 13.2mm down, machine cut aggregate on the Stabilized soil surface to achieve 20mm compacted thickness; by spreading in uniform layers on a prepared base including watering and compacting with 8 to 10 tonne vibratory power roller such that the grit gets Partially embedded into the stabilized surface, and to achieve the desired density including all materials, labour, HOM of machery etc. complete as per specifications, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

341.34

821810

2407.6

... More
Construction of Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

2227.5

531036

238.4

... More
Waterproofing on top of Shoulder with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge, including contractors profit & Over head charges, but excluding GST etc., complete

14850

164835

11.1

... More
Prime Coat : Preparing and applying of water soluble silane nanotechnology (for bitumen emulsion application, IRC approved) with cationic bitumen emulsion CSS1 and water (1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen emulsion : 200 liter water . Take 1 kg of silane nanotechnology and add in 200 liter water while filling water in tanker/drum and then add 100 kg cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution at the rate of 1 liter per sqm on compacted stone base. Check quality of bitumen emulsion before bulk use, including contractors profit & Over head charges, but excluding GST etc., complete.

16092.4

333112

20.7

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.50 tonnes per hour using crushed aggregates of specified grading (Grading II using 9.50 mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finished item of work.

402.31

2990933

7434.4

... More
Road Furniture

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for Ordinary KM Stone

5

8992

1798.5

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 200M Stone

16

8344

521.5

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 0f MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

2

17609

8804.7

... More
Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete up to 0.9 sqm size board

10

19722

1972.2

... More
Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.8 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete with 600X 600 mm size MS sheet

30

45420

1514

... More
Providing and fixing of Maintenance information board as per MoRD specifications and drawings. The Board will be a composite unit consisting of 1 MS plate of 1.60mm thickness (16SWG) and size of 900 x 1500 mm welded over welded MS flat Iron plates 50 x 5 mm size on back and welded to 75 mm dia 3.65mm thick (B class) steel tube frame of height 3.05 m as per the drawing and painted with ready mixed synthetic enamel paint of superior quality in required shade and colour, lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications.The 75mm dia steel tubes welded with 50 x 50x 6 mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 450 x 450 x 750 mm, 600 mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit but excluding GST & Seigniorage charges etc., complete.

1

10019

10019.8

... More
Construction of RCC guide posts of 250 mm dia x 1200 mm size M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding cost of steel, GST and seigniorage etc., complete

501

186071

371.4

... More
Construction of 1V-1000 mm dia Pipe culverts - 8 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

297.36

25275

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

20.08

14168

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

45.36

164575

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10 mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

234.8

922646

3929.5

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes

60

424134

7068.9

... More
Construction of 1V-600 mm dia Pipe culverts - 9 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

215.46

18314

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

15.3

10795

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

34.83

126370

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10 mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

146.16

574335

3929.5

... More
Providing and Laying reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specification No. 1100 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts

67.5

193806

2871.2

... More
Construction of 1V- 6.0 mt span slab culverts - 1 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

322.6

27421

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

46.09

167223

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10 mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

169.51

666089

3929.5

... More
Plain cement concrete M 15 grade using 40,20 & 10 mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

197.04

818937

4156.2

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10 mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

4.26

23763

5578.4

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10 mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

24.48

148588

6069.8

... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10 mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

3.83

20321

5305.8

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

50

9800

196

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

7.2

6796

943.9

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

3

159069

53023.3

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

3

162981

54327.2

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Protection Work

48

82051

1709.4

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1206.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

396

233362

589.3

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1302.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

54

90358

1673.3

... More
Construction of Retaining walls ( 1 No )

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

1247.85

106067

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

147.9

536610

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10 mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

1138.63

4732374

4156.2

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

1140

223440

196

... More
Construction of RCC guide posts of 250 mm dia x 1200 mm size M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding cost of steel, GST and seigniorage etc., complete

265

98421

371.4

... More
Construction of CC drain ( 350 Mt )

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

236.26

20082

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

52.5

37044

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

78.76

285757

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10 mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

119.7

470361

3929.5

... More
Plain cement concrete M 15 grade using 40,20 & 10 mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

16.1

66914

4156.2

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10 mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

4.32

24098

5578.4

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.52

27476

52840.2

... More
2) O-Vikrampuram to Kancharapadu in Komarada Mandal Of Vizianagaram District.

-

-

-

... More
Road Portion

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc., complete.

19584

35251

1.8

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

24584

1664336

67.7

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

12497

2002019

160.2

... More
Construction of improved sub grade /Shoulders by mixing with stone dust and ploughing and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

1035

353763

341.8

... More
Stabilized Sub base / Base for flexible payment Providing, laying, Spreading and compacting in-situ 70% Soil of CBR 5% mixed with 30% of GSB Grade-II material as per mix design. Rip and loosen the soil with tractor operated ripper / rotavator and add the GSB as per mix design. Spread cement @ 3% of MDD of Mix (soil + GSB) in the soil and mix uniformly by rotavator. Apply 1.0 kg/cum of Nano technology silane and 1.0 kg/cum of nano acrylic Co-Polymer with OMC water (1000 ppm TDS) on loose soil-aggregate-cement mix. Mix throughly using the Ripper and Rotavator. Grade the soil with Motor grader.Compact the soil-aggregate surface with 8 to 10 tonne vibratory power roller to achieve the desired density.Rates including all materials, labour, hire Charges of machery etc. complete as per MORD specifications & direction of Engineer-in-Charge, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

6781.82

12235759

1804.2

... More
Stabilized Sub base / Base for rigid payment Providing, laying, Spreading and compacting in-situ 70% Soil of CBR 5% mixed with 30% of GSB Grade-II material as per mix design. Rip and loosen the soil with tractor operated ripper / rotavator and add the GSB as per mix design. Spread cement @ 3% of MDD of Mix (soil + GSB) in the soil and mix uniformly by rotavator. Apply 1.0 kg/cum of Nano technology silane and 1.0 kg/cum of nano acrylic Co-Polymer with OMC water (1000 ppm TDS) on loose soil-aggregate-cement mix. Mix throughly using the Ripper and Rotavator. Grade the soil with Motor grader.Compact the soil-aggregate surface with 8 to 10 tonne vibratory power roller to achieve the desired density.Rates including all materials, labour, hire Charges of machery etc. complete as per MORD specifications & direction of Engineer-in-Charge, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

191.25

345053

1804.2

... More
Providing , Laying, Spreading of Grit of size 13.2mm down, machine cut aggregate on the Stabilized soil surface to achieve 20mm compacted thickness; by spreading in uniform layers on a prepared base including watering and compacting with 8 to 10 tonne vibratory power roller such that the grit gets Partially embedded into the stabilized surface, and to achieve the desired density including all materials, labour, HOM of machery etc. complete as per specifications, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

645.89

1316840

2038.8

... More
Construction of improved sub grade /Shoulders by mixing with stone dust and ploughing and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

4455.16

1522773

341.8

... More
Waterproofing on top of Shoulder with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge, including contractors profit & Over head charges, but excluding GST etc., complete

31350

347985

11.1

... More
Prime Coat : Preparing and applying of water soluble silane nanotechnology (for bitumen emulsion application, IRC approved) with cationic bitumen emulsion CSS1 and water (1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen emulsion : 200 liter water . Take 1 kg of silane nanotechnology and add in 200 liter water while filling water in tanker/drum and then add 100 kg cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution at the rate of 1 liter per sqm on compacted stone base. Check quality of bitumen emulsion before bulk use, including contractors profit & Over head charges, but excluding GST etc., complete.

30319.25

627608

20.7

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading,(Grading II using 9.50 mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

757.98

5287971

6976.4

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

256

1299276

5075.3

... More
Road Furniture

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 5th KM Stone

1

2911

2911

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for Ordinary KM Stone

9

15160

1684.5

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 200M Stone

33

16539

501.2

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 0f MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

4

34792

8698.1

... More
Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete up to 0.9 sqm size board

14

26864

1918.9

... More
Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.8 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete with 600X 600 mm size MS sheet

48

70113

1460.7

... More
Providing and fixing of Maintenance information board as per MoRD specifications and drawings. The Board will be a composite unit consisting of 1 MS plate of 1.60mm thickness (16SWG) and size of 900 x 1500 mm welded over welded MS flat Iron plates 50 x 5 mm size on back and welded to 75 mm dia 3.65mm thick (B class) steel tube frame of height 3.05 m as per the drawing and painted with ready mixed synthetic enamel paint of superior quality in required shade and colour, lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications.The 75mm dia steel tubes welded with 50 x 50x 6 mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 450 x 450 x 750 mm, 600 mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit but excluding GST & Seigniorage charges etc., complete.

1

9791

9791.3

... More
Construction of RCC guide posts of 250 mm dia x 1200mm size M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding cost of steel, GST and seigniorage etc., complete

772

266494

345.2

... More
Construction of 1V-1000 mm dia Pipe culverts - 25 Nos.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

1098.75

93393

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

62.75

23230

370.2

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

119.25

381683

3200.7

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

638.5

2238772

3506.3

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes

187.5

1276668

6808.9

... More
Construction of 2V-1000 mm dia Pipe culverts -1 No

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

62.85

5342

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

2.51

929

370.2

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

7.47

23909

3200.7

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

37.58

131766

3506.3

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes

15

102133

6808.9

... More
Construction of 1V- 600 mm dia Pipe culvert - 1 No

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

23.94

2034

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

1.7

629

370.2

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

3.87

12386

3200.7

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

16.24

56942

3506.3

... More
Providing and Laying reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specification No. 1100 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts

7.5

20642

2752.3

... More
Construction of 1V - 3.00 mt slab culvert -1 No.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

128.48

10920

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

19.27

61677

3200.7

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

63.31

221983

3506.3

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

55.09

204306

3708.6

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

3.9

19921

5108.2

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

8.1

45009

5556.7

... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

2.03

9876

4865.5

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

30

5880

196

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

4.5

4247

943.9

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.5

26511

53023.3

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

1

54327

54327.2

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1302.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

21.6

28177

1304.5

... More
Construction of Retaining wall ( 1 No. )

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

2899.8

246483

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

600.75

1922820

3200.7

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

3400.55

12611279

3708.6

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

2170

425320

196

... More
Construction of CC drain ( 1 No )

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

90

7650

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

15

5553

370.2

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

22.5

72015

3200.7

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

41.4

145160

3506.3

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

2.3

7361

3200.7

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

6.89

35195

5108.2

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.83

43857

52840.2

... More
03) GSivada RandB to Pedantijola in Kurupam Mandal of Vizianagaram District.

-

-

-

... More
Road Portion

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc., complete.

4736

8524

1.8

... More
Scarifying existing granular surface to a depth of 50 mm and spreading scarified material in uniform layers with Tractor grader and compacting with Vibratory Roller to achieve the desired density as per Technical Specification Clause 301.9 of MORD ,including contractors profit & Over head charges, but excluding GST etc., complete.

6992

148929

21.3

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

4703.45

318423

67.7

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

1584.26

253798

160.2

... More
Waterproofing on top of the sub Grade soil base with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge. including contractors profit & Over head charges, but excluding GST etc., complete

13272

147319

11.1

... More
Stabilized Sub base / Base: Providing, laying, Spreading and compacting in-situ 70% Soil of CBR 5% mixed with 30% of GSB Grade-II material as per mix design. Rip and loosen the soil with tractor operated ripper / rotavator and add the GSB as per mix design. Spread cement @ 3% of MDD of Mix (soil + GSB) in the soil and mix uniformly by rotavator. Apply 1.0 kg/cum of Nano technology silane and 1.0 kg/cum of nano acrylic Co-Polymer with OMC water (1000 ppm TDS) on loose soil-aggregate-cement mix. Mix throughly using the Ripper and Rotavator. Grade the soil with Motor grader.Compact the soil-aggregate surface with 8 to 10 tonne vibratory power roller to achieve the desired density.Rates including all materials, labour, hire Charges of machery etc. complete as per MORD specifications & direction of Engineer-in-Charge, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

1342.74

2441504

1818.3

... More
Stabilized Sub base / Base: Providing, laying, Spreading and compacting in-situ 70% Soil of CBR 5% mixed with 30% of GSB Grade-II material as per mix design. Rip and loosen the soil with tractor operated ripper / rotavator and add the GSB as per mix design. Spread cement @ 3% of MDD of Mix (soil + GSB) in the soil and mix uniformly by rotavator. Apply 1.0 kg/cum of Nano technology silane and 1.0 kg/cum of nano acrylic Co-Polymer with OMC water (1000 ppm TDS) on loose soil-aggregate-cement mix. Mix throughly using the Ripper and Rotavator. Grade the soil with Motor grader.Compact the soil-aggregate surface with 8 to 10 tonne vibratory power roller to achieve the desired density.Rates including all materials, labour, hire Charges of machery etc. complete as per MORD specifications & direction of Engineer-in-Charge, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

118.88

216159

1818.3

... More
Providing , Laying, Spreading of Grit of size 13.2mm down, machine cut aggregate on the Stabilized soil surface to achieve 20mm compacted thickness; by spreading in uniform layers on a prepared base including watering and compacting with 8 to 10 tonne vibratory power roller such that the grit gets Partially embedded into the stabilized surface, and to achieve the desired density including all materials, labour, HOM of machery etc. complete as per specifications, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

127.88

307883

2407.6

... More
Construction of improved sub grade /Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

990.38

224717

226.9

... More
Waterproofing on top of Shoulder with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge, including contractors profit & Over head charges, but excluding GST etc., complete

6555

72760

11.1

... More
Prime Coat : Preparing and applying of water soluble silane nanotechnology (for bitumen emulsion application, IRC approved) with cationic bitumen emulsion CSS1 and water (1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen emulsion : 200 liter water . Take 1 kg of silane nanotechnology and add in 200 liter water while filling water in tanker/drum and then add 100 kg cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution at the rate of 1 liter per sqm on compacted stone base. Check quality of bitumen emulsion before bulk use, including contractors profit & Over head charges, but excluding GST etc., complete.

6057.5

125390

20.7

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.50 tonnes per hour using crushed aggregates of specified grading,(Grading II using 9.50 mm nominal size) premixed with bituminous binder @ 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

151.43

1125791

7434.4

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

118.32

652605

5515.6

... More
Road Furniture

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for Ordinary KM Stone

2

3597

1798.5

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 200M Stone

8

4172

521.5

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 0f MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

2

17609

8804.7

... More
Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete up to 0.9 sqm size board

6

11833

1972.2

... More
Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.8 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete with 600X 600 mm size MS sheet

12

18168

1514

... More
Providing and fixing of Maintenance information board as per MoRD specifications and drawings. The Board will be a composite unit consisting of 1 MS plate of 1.60mm thickness (16SWG) and size of 900 x 1500 mm welded over welded MS flat Iron plates 50 x 5 mm size on back and welded to 75 mm dia 3.65mm thick (B class) steel tube frame of height 3.05 m as per the drawing and painted with ready mixed synthetic enamel paint of superior quality in required shade and colour, lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications.The 75mm dia steel tubes welded with 50 x 50x 6 mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 450 x 450 x 750 mm, 600 mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit but excluding GST & Seigniorage charges etc., complete.

1

10019

10019.8

... More
Construction of 1V-1000 mm dia Pipe culverts - 3 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

131.85

11207

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

7.53

5313

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

14.31

51919

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

67.53

265359

3929.5

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes

22.5

159050

7068.9

... More
Construction of 1V-600 mm dia Pipe culverts - 5 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

119.7

10174

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

8.5

5997

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

19.35

70205

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

77.15

303160

3929.5

... More
Providing and Laying reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specification No. 1100 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts

37.5

107670

2871.2

... More
1V 6.0 Mt Slab Culvert

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

257.5

21887

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

41.18

149409

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

119.73

470479

3929.5

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

151.13

628126

4156.2

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

4.54

25325

5578.4

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

24.3

147496

6069.8

... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

7.59

40271

5305.8

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

120

23520

196

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

7.2

6796

943.9

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.5

26511

53023.3

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

3.5

190145

54327.2

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Protection Work

24

40970

1707.1

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1206.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

396

227898

575.5

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1302.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

51.48

86141

1673.3

... More
Reinforced Cement Concrete M 30 grade approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.4 MORD / 1500, 1600, 1700 & 2704 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

12.06

62598

5190.6

... More
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm as per Tech Specification 800 MORTH. including contractors profit & Over head charges, but excluding GST etc., complete.

200

9800

49

... More
1V 2.0 Mt Slab Culvert

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

119.84

10186

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

17.98

65235

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

57.43

225671

3929.5

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

36.68

152449

4156.2

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

3.54

19747

5578.4

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

4.68

28406

6069.8

... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

1.91

10134

5305.8

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

30

5880

196

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

3.6

3398

943.9

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.5

26511

53023.3

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

0.7

38029

54327.2

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1302.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

21.6

36143

1673.3

... More
Construction of CC drain ( 380 Mt )

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

99.75

8478

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

28.5

20109

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

21.38

77570

3628.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

37.95

149124

3929.5

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

5.7

23690

4156.2

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

3.44

19189

5578.4

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.3

15852

52840.2

... More
04) Kotha Adari to Jilleduvalasa in Parvathipuram Mandal of Vizianagaram Dist

-

-

-

... More
Road Portion

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc., complete.

4704

8467

1.8

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

5462

369777

67.7

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

1169

187273

160.2

... More
Waterproofing on top of the sub Grade soil base with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge. including contractors profit & Over head charges, but excluding GST etc., complete

16300.8

180938

11.1

... More
Cement Treated Soil Sub Base with Nano- Technology : Providing, laying and spreading soil on a prepared sub-grade, pulverising, adding 3% of cement by weight of Soil to the spread soil. Add 1 Kg/ Cum of Organo Silane Nano-Technology and 1 kg/Cum of Acrylic Co-Polymer to the OMC water. mix in place with rotavator, grade with motor grader and compact with the 80-100 tonns viberatory roller at OMC to achieve the desired unconfined compresssive strength and to form a layer of Sub Base as per Technical Specification Clause 404.

873.49

1166633

1335.6

... More
Stabilized Sub base / Base Providing, laying, Spreading and compacting in-situ 70% Soil of CBR 5% mixed with 30% of GSB Grade-II material as per mix design. Rip and loosen the soil with tractor operated ripper / rotavator and add the GSB as per mix design. Spread cement @ 3% of MDD of Mix (soil + GSB) in the soil and mix uniformly by rotavator. Apply 1.0 kg/cum of Nano technology silane and 1.0 kg/cum of nano acrylic Co-Polymer with OMC water (1000 ppm TDS) on loose soil-aggregate-cement mix. Mix throughly using the Ripper and Rotavator. Grade the soil with Motor grader.Compact the soil-aggregate surface with 8 to 10 tonne vibratory power roller to achieve the desired density.Rates including all materials, labour, hire Charges of machery etc. complete as per MORD specifications & direction of Engineer-in-Charge, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

820.08

1382244

1685.5

... More
Providing , Laying, Spreading of Grit of size 13.2mm down, machine cut aggregate on the Stabilized soil surface to achieve 20mm compacted thickness; by spreading in uniform layers on a prepared base including watering and compacting with 8 to 10 tonne vibratory power roller such that the grit gets Partially embedded into the stabilized surface, and to achieve the desired density including all materials, labour, HOM of machery etc. complete as per specifications, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

149.02

283242

1900.7

... More
Construction of improved sub grade /Shoulders by mixing with stone dust and ploughing and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

1215

303628

249.9

... More
Waterproofing on top of Shoulder with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge, including contractors profit & Over head charges, but excluding GST etc., complete

8100

89910

11.1

... More
Prime Coat : Preparing and applying of water soluble silane nanotechnology (for bitumen emulsion application, IRC approved) with cationic bitumen emulsion CSS1 and water (1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen emulsion : 200 liter water . Take 1 kg of silane nanotechnology and add in 200 liter water while filling water in tanker/drum and then add 100 kg cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution at the rate of 1 liter per sqm on compacted stone base. Check quality of bitumen emulsion before bulk use, including contractors profit & Over head charges, but excluding GST etc., complete.

7450.8

154231

20.7

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50 mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

186.27

1268014

6807.4

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

140

717360

5124

... More
Road Furniture

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 5th KM Stone

1

2939

2939.1

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for Ordinary KM Stone

3

5111

1703.8

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 200M Stone

9

4542

504.7

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 0f MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

4

34864

8716.1

... More
Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete up to 0.9 sqm size board

10

19280

1928

... More
Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.8 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete with 600X 600 mm size MS sheet

3

4409

1469.7

... More
Providing and fixing of Maintenance information board as per MoRD specifications and drawings. The Board will be a composite unit consisting of 1 MS plate of 1.60mm thickness (16SWG) and size of 900 x 1500 mm welded over welded MS flat Iron plates 50 x 5 mm size on back and welded to 75 mm dia 3.65mm thick (B class) steel tube frame of height 3.05 m as per the drawing and painted with ready mixed synthetic enamel paint of superior quality in required shade and colour, lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications.The 75mm dia steel tubes welded with 50 x 50x 6 mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 450 x 450 x 750 mm, 600 mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit but excluding GST & Seigniorage charges etc., complete.

1

9830

9830

... More
Construction of 1V-1000 mm dia Pipe culverts - 2 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

87.9

7471

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

5.02

3542

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

9.54

30986

3248.1

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

51.08

182764

3578

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes

15

102160

6810.7

... More
Construction of 1V-600 mm dia Pipe culverts - 7 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

167.58

14244

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

11.9

8396

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

27.09

87991

3248.1

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

114.73

410503

3578

... More
Providing and Laying reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specification No. 1100 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts

52.5

144543

2753.2

... More
Construction of 1V-600 mm dia Pipe culvert ( 5 pipes) - 1 No

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

28.71

2440

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

3.28

2314

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

3.87

12570

3248.1

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

16.39

58643

3578

... More
Providing and Laying reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specification No. 1100 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts

12.5

34415

2753.2

... More
Construction of 1V- 2.0 mt slab culvert - 1 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

66.66

5666

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

14.81

48104

3248.1

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

17.9

64046

3578

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

59.58

225480

3784.5

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

3.54

18267

5160.3

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

6.48

36376

5613.6

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

50

9800

196

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

3.6

3398

943.9

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.5

26511

53023.3

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

0.7

38029

54327.2

... More
Construction of Retaining wall ( 1 No )

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

399

33915

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

79.8

259198

3248.1

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

483

1827913

3784.5

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

140

27440

196

... More
Construction of side drain ( 1 No )

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

105

8925

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

30

21168

705.6

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

45

146164

3248.1

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

82.8

296258

3578

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

6.89

35554

5160.3

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.83

43857

52840.2

... More
05) O-Tekulova Road at2/8 km to Bitratonki in Parvathipuram Mandal of Vizianagaram Dist.

-

-

-

... More
Road Portion

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc., complete.

3648

6566

1.8

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

2979

201678

67.7

... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

6371

1020634

160.2

... More
Construction of improved sub grade /Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

608

137955

226.9

... More
Waterproofing on top of the sub Grade soil base with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge. including contractors profit & Over head charges, but excluding GST etc., complete

11400

126540

11.1

... More
Cement Treated Soil Sub Base with Nano- Technology : Providing, laying and spreading soil on a prepared sub-grade, pulverising, adding 3% of cement by weight of Soil to the spread soil. Add 1 Kg/ Cum of Organo Silane Nano-Technology and 1 kg/Cum of Acrylic Co-Polymer to the OMC water. mix in place with rotavator, grade with motor grader and compact with the 80-100 tonns viberatory roller at OMC to achieve the desired unconfined compresssive strength and to form a layer of Sub Base as per Technical Specification Clause 404.

629

834368

1326.5

... More
Stabilized Sub base / Base for flexible pavement : Providing, laying, Spreading and compacting in-situ 70% Soil of CBR 5% mixed with 30% of GSB Grade-II material as per mix design. Rip and loosen the soil with tractor operated ripper / rotavator and add the GSB as per mix design. Spread cement @ 3% of MDD of Mix (soil + GSB) in the soil and mix uniformly by rotavator. Apply 1.0 kg/cum of Nano technology silane and 1.0 kg/cum of nano acrylic Co-Polymer with OMC water (1000 ppm TDS) on loose soil-aggregate-cement mix. Mix throughly using the Ripper and Rotavator. Grade the soil with Motor grader.Compact the soil-aggregate surface with 8 to 10 tonne vibratory power roller to achieve the desired density.Rates including all materials, labour, hire Charges of machery etc. complete as per MORD specifications & direction of Engineer-in-Charge, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

591

974972

1649.7

... More
Providing , Laying, Spreading of Grit of size 13.2mm down, machine cut aggregate on the Stabilized soil surface to achieve 20mm compacted thickness; by spreading in uniform layers on a prepared base including watering and compacting with 8 to 10 tonne vibratory power roller such that the grit gets Partially embedded into the stabilized surface, and to achieve the desired density including all materials, labour, HOM of machery etc. complete as per specifications, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

118.2

218149

1845.6

... More
Construction of improved sub grade /Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

855

193999

226.9

... More
Waterproofing on top of Shoulder with Nano technology based Organo silane &nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1:1:200 @ 3ltrs/sqm as per direction of the Engineer-in-charge, including contractors profit & Over head charges, but excluding GST etc., complete

5700

63270

11.1

... More
Prime Coat : Preparing and applying of water soluble silane nanotechnology (for bitumen emulsion application, IRC approved) with cationic bitumen emulsion CSS1 and water (1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen emulsion : 200 liter water . Take 1 kg of silane nanotechnology and add in 200 liter water while filling water in tanker/drum and then add 100 kg cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution at the rate of 1 liter per sqm on compacted stone base. Check quality of bitumen emulsion before bulk use, including contractors profit & Over head charges, but excluding GST etc., complete.

5916

122461

20.7

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading (Grading II using 9.50 mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

147.9

996831

6739.9

... More
Road Furniture

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for Ordinary KM Stone

2

3376

1688.4

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 200M Stone

7

3513

501.9

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 0f MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

2

17403

8701.7

... More
Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete up to 0.9 sqm size board

3

5762

1920.7

... More
Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.8 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete with 600X 600 mm size MS sheet

12

17550

1462.5

... More
Providing and fixing of Maintenance information board as per MoRD specifications and drawings. The Board will be a composite unit consisting of 1 MS plate of 1.60mm thickness (16SWG) and size of 900 x 1500 mm welded over welded MS flat Iron plates 50 x 5 mm size on back and welded to 75 mm dia 3.65mm thick (B class) steel tube frame of height 3.05 m as per the drawing and painted with ready mixed synthetic enamel paint of superior quality in required shade and colour, lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications.The 75mm dia steel tubes welded with 50 x 50x 6 mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 450 x 450 x 750 mm, 600 mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit but excluding GST & Seigniorage charges etc., complete.

1

9799

9799

... More
Construction of 1V-1000 mm dia Pipe culverts - 2Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

87.9

7471

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

5.02

3349

667.2

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

9.54

30426

3189.4

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

48.02

169059

3520.6

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes

15

102325

6821.7

... More
Construction of 1V-1000 mm dia Pipe culverts - 2 Nos.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

43.95

3735

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

2.51

1674

667.2

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

4.77

15213

3189.4

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

38.82

136669

3520.6

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes

7.5

51162

6821.7

... More
Construction of 1V-600 mm dia Pipe culverts - 1 No.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

119.7

10174

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

8.5

5671

667.2

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

19.35

61714

3189.4

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

81.2

285872

3520.6

... More
Providing and Laying reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specification No. 1100 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts

37.5

103432

2758.2

... More
Construction of 1V-600 mm dia Pipe culverts - 1 No.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

23.94

2034

85

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

1.7

1134

667.2

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

3.87

12342

3189.4

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet

29.64

104350

3520.6

... More
Providing and Laying reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specification No. 1100 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts

7.5

20686

2758.2

... More
1V 6.0 Mt Slab Culvert

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

486.64

41364

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

73

232826

3189.4

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

267.79

942781

3520.6

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

317.93

1183907

3723.8

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

4.26

21707

5095.7

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

22.95

127216

5543.2

... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

3.83

18590

4853.9

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

72

14112

196

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

11.26

10628

943.9

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

3

159069

53023.3

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

3

162981

54327.2

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Protection Work

24

29728

1238.7

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1206.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

396

227898

575.5

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1302.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

36

40006

1111.3

... More
1V 3.0 Mt Slab Culvert

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

229.9

19541

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

36.3

115775

3189.4

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

133.6

470352

3520.6

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

151.35

563597

3723.8

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

3.9

19873

5095.7

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

8.1

44899

5543.2

... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

2.03

9853

4853.9

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

33.1

6487

196

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

4.5

4247

943.9

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.3

15906

53023.3

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

0.5

27163

54327.2

... More
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm as per Tech Specification 800 MORTH. including contractors profit & Over head charges, but excluding GST etc., complete.

19.14

937

49

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1302.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

36

40006

1111.3

... More
Retaining wall 40 mt

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

91.2

7752

85

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

22.8

72718

3189.4

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

138

513884

3723.8

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

48

9408

196



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.