Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Opening Date23 Sep 2024
Closing Date15 Oct 2024
Tender Amount₹ 65,76,260 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cost of 200mm dia 15mm thick MS Flanges including cost of Bolts, Nuts, Rubber Packing etc., complete (MAT-06414/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

6

15456

2576

... More
Cost of 150mm dia 15mm thick MS Flanges including cost of Bolts, Nuts, Rubber Packing etc., complete (MAT-06413/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

3

6168

2056

... More
Towards cost of welding charges of 200mm dia MS pipes and specials incluling all labour charges etc complete. incl. C/C of all materials and labour charges etc. Complete

10

2500

250

... More
Towards chire charges of welding machine including transportation etc complete (Dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

2

6000

3000

... More
Centrifugally cast 150mm dia (Spun) Ductile Iron pressure pipes for water, gas and sewage with Socket Spigot ends conforming to IS. 8329/ 2000 in standard working lengths of 5.5 meter for classification K7 suitable for push-on-joint (rubber gasket d jointing) with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, excluding transportation and all taxes. (MAT-07764/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

16.5

25922

1571

... More
Supply and delivery of 150mm dia Rubber Gaskets suitable for C.I/ D.I S/S pipes anywhere in A.P. F.O.R Destination departmental stores including cost of material, loading incidental handling with companies standard packing, transportation, unloading & stacking but excluding all taxes (MAT-07968 /SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

4

408

102

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps. (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

30

1920

64

... More
Towards cost of JCB hire charges for earthwok excation including all labour charges etc complete (dept approved rate) incl. C/C of all materials and labour charges etc. Complete

8

8000

1000

... More
Centrifugally cast 250mm dia (Spun) Ductile Iron pressure pipes for water, gas and sewage with Socket Spigot ends conforming to IS.: 8329/ 2000 in standard working lengths of 5.5 meter for classification K7 suitable for push-on-joint (rubber gasket d jointing) with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, excluding transportation and all taxes. (MAT-07766/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

16.5

46794

2836

... More
Supply and delivery of 250mm dia Rubber Gaskets suitable for C.I/ D.I S/S pipes anywhere in A.P. F.O.R Destination departmental stores including cost of material, loading incidental handling with companies standard packing, transportation, unloading & stacking but excluding all taxes (MAT-07970 /SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

6

828

138

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps. (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

75

4800

64

... More
Towards cost of JCB hire charges for earthwok excation including all labour charges etc complete (dept approved rate) incl. C/C of all materials and labour charges etc. Complete

12

12000

1000

... More
Manufacture, Supply & delivery of 350mmdia CI Mechanical joints. (rate of 300 mm dia CI Dismantling jonts) (26409 + 5% conveyance charges) (PH items/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

15

415942

27729.45

... More
Supply and delivery of 350mm dia Rubber Gaskets suitable for C.I/ D.I S/S pipes any where in A.P including cost of material loading incidental handling with companies standard packing, transportation, unloading & stacking but excluding all taxes (MAT-07972 /SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

30

7980

266

... More
Towards cost of JCB hire charges for earthwok excation incluidng all labour charges etc complete. (dept approved rate) incl. C/C of all materials and labour charges etc. Complete

36

36000

1000

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

240

15360

64

... More
Manufacture, Supply of 200mm dia A.C.Cl15 Pressure pipes (Mazza process) as per BIS No: 1592/2003 as amended from time to time duly marked with BIS mark, including cost of material incidental handling loading and packing charges but exclusive of transportation, unloading, stacking at departmental stores, and excluding all taxes. The pipes shall be tested at factory premises confirming to IS Code 1592/ 2003 (MAT-05917/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

30

12240

408

... More
Supply & delivery of 125mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24). incl. C/C of all materials and labour charges etc. Complete

10

5104

510.4

... More
Towards cost of JCB hire charges for earthwok excation incluidng all labour charges etc complete. (dept approved rate) incl. C/C of all materials and labour charges etc. Complete

20

20000

1000

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

80

5120

64

... More
Manufacture, Supply of 200mm dia A.C.Cl15 Pressure pipes (Mazza process) as per BIS No: 1592/2003 as amended from time to time duly marked with BIS mark, including cost of material incidental handling loading and packing charges but exclusive of transportation, unloading, stacking at departmental stores, and excluding all taxes. The pipes shall be tested at factory premises confirming to IS Code 1592/2003.(MAT-05919/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

30

28590

953

... More
Supply & delivery of 200mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24). incl. C/C of all materials and labour charges etc. Complete

10

8712

871.22

... More
Towards cost of JCB hire charges for earthwok excation incluidng all labour charges etc complete. (dept approved rate) incl. C/C of all materials and labour charges etc. Complete

20

20000

1000

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

80

5120

64

... More
Manufacture, Supply of 350mm dia A.C.Cl15 Pressure pipes (Mazza process) as per BIS No: 1592/2003 as amended from time to time duly marked with BIS mark, including cost of material incidental handling loading and packing charges but exclusive of transportation, unloading, stacking at departmental stores, and excluding all taxes. The pipes shall be tested at factory premises confirming to IS Code 1592/ 2003 (MAT-05922/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

48

99024

2063

... More
Supply & delivery of 350mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24). incl. C/C of all materials and labour charges etc. Complete

16

36903

2306.46

... More
Towards cost of JCB hire charges for earthwok excation incluidng all labour charges etc complete (dept approved rate) incl. C/C of all materials and labour charges etc. Complete

32

32000

1000

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps(given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

200

12800

64

... More
Manufacture, supply & delivery of Unplasticised of 63mm dia PVC 6kgf/cm2 forpotable water supplies inclusive of transportation excluding taxes etc complete (MAT-07649/ 2023-24) incl. C/C of all materials and labour charges etc. Complete

30

2940

98

... More
Supply & delivery of 63mmdia PVC 6kg/cm2 couplers (rate as per price list dt: 01.10.2010) incl. C/C of all materials and labour charges etc. Complete

10

936

93.64

... More
Towards cost of JCB hire charges (dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

15

15000

1000

... More
Manufacture, supply & delivery of Unplasticised of 75mm dia PVC 6kgf/cm2 forpotable water supplies inclusive of transportation excluding taxes etc complete (MAT-07650/ 2023-24) incl. C/C of all materials and labour charges etc. Complete

90

12060

134

... More
Supply & delivery of 75mmdia PVC 6kg/cm2 couplers (rate as per price list dt: 01.10.2010) incl. C/C of all materials and labour charges etc. Complete

30

2809

93.64

... More
Towards cost of JCB hire charges(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

45

45000

1000

... More
Supply & delivery of Unplasticised PVCs pipes of 90 mm dia 6kgf/cm2 forpotable water supplies inclusive of transportation excluding taxes etc complete (MAT07651/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

60

11580

193

... More
Towards cost of 80mm dia GI B class pipe (MAT-00038/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

60

64583

1076.39

... More
Towards cost of 80mm dia GI 0.30mtr nipples rate as per SE/RWS/Knl dt: 26.03.2009) incl. C/C of all materials and labour charges etc. Complete

10

3000

300

... More
Towards cost of 80mm dia GI bends (rate as per SE/RWS/Knl dt: 26.03.2009) incl. C/C of all materials and labour charges etc. Complete

10

2400

240

... More
Cost of 80mm dia MS Flanges including cost of Bolts, Nuts, Rubber Packing etc., complete (MAT-06410/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

9360

936

... More
Towards cost of welding charges for 80mm dia GI pipes and specials including all labour charges etc complete. (local rate) incl. C/C of all materials and labour charges etc. Complete

20

6000

300

... More
Towards hire charges of welding machine including transportation etc complete. (Dept, appr rate) incl. C/C of all materials and labour charges etc. Complete

3

9000

3000

... More
Manufacture, supply & delivery of Unplasticised of 110mm dia PVC 6kgf/cm2 forpotable water supplies inclusive of transportation excluding taxes etc complete (MAT-07652/ 2023-24) incl. C/C of all materials and labour charges etc. Complete

30

8400

280

... More
Supply & delivery of 110mmdia PVC 6kg/cm2 couplers (rate as per price list dt: 01.10.2010) incl. C/C of all materials and labour charges etc. Complete

12

2788

232.36

... More
Towards cost of JCB hire charges(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

24

24000

1000

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 125mm dia 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etc complete. (MAT-07653/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

24

8640

360

... More
Supply & delivery of 125mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

12

6125

510.4

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

16

16000

1000

... More
Supply & delivery of 125mm dia PVC 6kg/cm2 coupler (rate as per price list dt: 1.10.2021) incl. C/C of all materials and labour charges etc. Complete

8

1859

232.36

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 160mm dia 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etc complete. (MAT-07655/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

24

14256

594

... More
Supply & delivery of 150mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

6484

648.42

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

16

16000

1000

... More
Supply & delivery of 160mm dia PVC 6kg/cm2 coupler (rate as per price list dt: 1.10.2021) incl. C/C of all materials and labour charges etc. Complete

8

4974

621.78

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 200mm dia 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etc complete. (MAT-07657/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

24

22416

934

... More
Supply & delivery of 200mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

9130

913.02

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

16

16000

1000

... More
Supply & delivery of 200mm dia PVC 6kg/cm2 coupler (rate as per price list dt: 1.10.2021) incl. C/C of all materials and labour charges etc. Complete

8

10517

1314.65

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 250mm dia 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etc complete. (MAT-07659/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

30

45930

1531

... More
Supply & delivery of 250mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

11846

1184.56

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

20

20000

1000

... More
Supply & delivery of 250mm dia PVC 6kg/cm2 coupler (rate as per price list dt: 1.10.2021) incl. C/C of all materials and labour charges etc. Complete

6

7888

1314.65

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 315mm dia 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etc complete. (MAT-07661/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

30

73500

2450

... More
Supply & delivery of 300mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

14284

1428.36

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

20

20000

1000

... More
Supply & delivery of 315mm dia PVC 6kg/cm2 coupler (rate as per price list dt: 1.10.2021) incl. C/C of all materials and labour charges etc. Complete

10

13147

1314.65

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 160mm dia HDPE 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etccomplete.(MAT-07268/23-24) incl. C/C of all materials and labour charges etc. Complete

30

22590

753

... More
Supply & delivery of 160mmdia HDPE 6kg/cm2 Collars MAT-07478/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

6380

638

... More
Supply &delivery of 160mmdia MS flanges including bolts, nuts &rubber rings etc complete (MAT-07496/ SSR 23-24). incl. C/C of all materials and labour charges etc. Complete

10

4020

402

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps. (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

125

8000

64

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

20

20000

1000

... More
Towards hirecharges of 30KVA diesel generator including fuel charges and crew charges etc complete (HIR-00023/2023-24) incl. C/C of all materials and labour charges etc. Complete

25

33900

1356

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 200mm dia HDPE 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etc complete.(MAT07274/23-24) incl. C/C of all materials and labour charges etc. Complete

30

35190

1173

... More
Supply & delivery of 200mmdia HDPE 6kg/cm2 Collars (MAT-07480/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

12490

1249

... More
Supply &delivery of 200mmdia MS flanges including bolts, nuts &rubber rings etc complete (MAT-07498/ SSR 23-24). incl. C/C of all materials and labour charges etc. Complete

10

7340

734

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

20

20000

1000

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps. (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

125

8000

64

... More
Towards hire charges of 30KVA diesel generator including fuel charges and crew charges etc complete (HIR-00023/2023-24) incl. C/C of all materials and labour charges etc. Complete

25

33900

1356

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 280mm dia HDPE 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etc complete(MAT-07273/23-24) incl. C/C of all materials and labour charges etc. Complete

30

68460

2282

... More
Supply & delivery of 280mmdia HDPE 6kg/cm2 Collars (MAT-07483/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

18780

1878

... More
Supply &delivery of 280mmdia MS flanges including bolts, nuts &rubber rings etc complete (MAT-07501/ SSR 23-24). incl. C/C of all materials and labour charges etc. Complete

10

12310

1231

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

20

20000

1000

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps. (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

125

8000

64

... More
Towards hire charges of 30KVA diesel generator including fuel charges and crew charges etc complete (HIR-00023/2023-24) incl. C/C of all materials and labour charges etc. Complete

25

33900

1356

... More
Manufacture, supply & delivery of Unplasticised PVCs pipes of 315mm dia HDPE 6kgf/cm2 for potable water supplies inclusive of transportation excluding taxes etc complete(MAT07274/23-24) incl. C/C of all materials and labour charges etc. Complete

30

86310

2877

... More
Supply & delivery of 315mmdia PVC 6kg/cm2 couplers (rate as per price list dt: 01.10.2010) incl. C/C of all materials and labour charges etc. Complete

10

5000

500

... More
Supply & delivery of 300mmdia Cl15 CID joints including bolts, nuts & rubber rings etc complete (SSR 2023-24). incl. C/C of all materials and labour charges etc. Complete

8

11427

1428.36

... More
Towards cost of JCB hire charges.(dept, approved rate) incl. C/C of all materials and labour charges etc. Complete

20

20000

1000

... More
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps. (given rate in SSR 2018-19) incl. C/C of all materials and labour charges etc. Complete

125

8000

64

... More
Towards hire charges of 30KVA diesel generator including fuel charges and crew charges etc complete (HIR-00023/2023-24) incl. C/C of all materials and labour charges etc. Complete

25

33900

1356

... More
Removal charges of 10HP pumpset etc complete (appr.by As per SE/RWS /Knl dated: 07.10.2009) incl. C/C of all materials and labour charges etc. Complete

2

6200

3100

... More
Being the Loading,Transportation & Unloading of 10HP pumpset from site to Kurnool . incl. C/C of all materials and labour charges etc. Complete

2

1000

500

... More
Rewinding of 10 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required (ELEC-5.9.14 (d)/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

2

10500

5250

... More
Towards cost of Pump bushes. incl. C/C of all materials and labour charges etc. Complete

2

200

100

... More
Towards cost of Pump service charges. incl. C/C of all materials and labour charges etc. Complete

2

600

300

... More
Being the Loading,Transportation & Unloading of 10HP pumpset from Kurnool to site. . incl. C/C of all materials and labour charges etc. Complete

2

1000

500

... More
Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. enclosed with no volt coil and overload protection with necessary materials, etc., complete suitable for 10 HP motor Makes: Siemens / Crompton / L&T (MK2 DOL) (ELEC-5.4.19/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

2

5082

2541

... More
Labour charges for erection of 10 HP three phase submerssible pumpset(Open well) including pipe connection for suction and delivery and all labour charges etc., complete., incl. C/C of all materials and labour charges etc. Complete

2

9375

4687.5

... More
Removal charges of 10HP pumpset etc complete (appr.by As per SE/RWS /Knl dated: 07.10.2009) incl. C/C of all materials and labour charges etc. Complete

1

3100

3100

... More
Being the Loading,Transportation & Unloading of 10HP pumpset from site to Kurnool . incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Rewinding of 10 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc as required (ELEC-5.9.14 (d)/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5250

5250

... More
Towards cost of Pump bushes. incl. C/C of all materials and labour charges etc. Complete

1

100

100

... More
Towards cost of Pump service charges. incl. C/C of all materials and labour charges etc. Complete

1

300

300

... More
Being the Loading,Transportation & Unloading of 10HP pumpset from Kurnool to site. . incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Labour charges for erection of 10 HP three phase submerssible pumpset(Open well) including pipe connection for suction and delivery and all labour charges etc., complete., incl. C/C of all materials and labour charges etc. Complete

1

4688

4687.5

... More
Removal charges of 10HP pumpset etc complete (appr.by As per SE/RWS /Knl dated: 07.10.2009) incl. C/C of all materials and labour charges etc. Complete

1

3100

3100

... More
Being the Loading,Transportation & Unloading of 10HP pumpset from site to Kurnool . incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Rewinding of 10 HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc as required (ELEC-5.9.14 (d)/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5250

5250

... More
Towards cost of Pump bushes. incl. C/C of all materials and labour charges etc. Complete

1

100

100

... More
Towards cost of Pump service charges. incl. C/C of all materials and labour charges etc. Complete

1

300

300

... More
Being the Loading,Transportation & Unloading of 10HP pumpset from Kurnool to site. . incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. enclosed with no volt coil and overload protection with necessary materials,etccomplete suitable for 10 HP motor Makes: Siemens / Crompton / L&T (MK2 DOL) (ELEC-5.4.19/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

2541

2541

... More
Labour charges for erection of 10 HP three phase submerssible pumpset(Open well) including pipe connection for suction and delivery and all labour charges etc., complete., incl. C/C of all materials and labour charges etc. Complete

1

4688

4687.5

... More
Removal charges of 10 HP pumpset etc complete (appr.by As per SE/RWS /Knl dated: 07.10.2009) incl. C/C of all materials and labour charges etc. Complete

1

3100

3100

... More
Towards cost of transportation charges of 10HP centrifugal pumpset from site to work shop at Kurnool. incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Rewinding of three phase motor of 1400 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required (ELEC-5.9.14/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5250

5250

... More
Towards Cost of Pump servicing charges. (dept appr.rate) incl. C/C of all materials and labour charges etc. Complete

1

300

300

... More
Towards cost of transportation charges of 10HP centrifugal pumpset from shop at Kurnool to site. incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Labour charges for erection of 10 HP three phase Monoblock centrifugal pumpset including pipe connection for suction and delivery and all labour charges etc. complete. incl. C/C of all materials and labour charges etc. Complete

1

3125

3125

... More
Removal charges of 30 HP pumpset etc complete (appr.by As per SE/RWS /Knl dated: 07.10.2009) incl. C/C of all materials and labour charges etc. Complete

2

6200

3100

... More
Towards cost of transportation charges of 30HP centrifugal pumpset from site to work shop at Kurnool. incl. C/C of all materials and labour charges etc. Complete

2

1000

500

... More
Rewinding of 30 HP Three Phase Monoblock pumpset up to 1400 RPM of all types and makes with copper wire, over hauling with minor repairs, testing for the original speed and no load consumption. incl. C/C of all materials and labour charges etc. Complete

2

44337

22168.51

... More
Supply & fixing of Pump side bearings 6307 (appr.rate by dept.) incl. C/C of all materials and labour charges etc. Complete

2

1900

950

... More
Supply & fixing of motor bearing 6308 SKF (appr.rate by dept.) incl. C/C of all materials and labour charges etc. Complete

2

2400

1200

... More
Towards Cost of Pump Impellers. incl. C/C of all materials and labour charges etc. Complete

2

750

375

... More
Towards Cost of Pump servicing charges. (dept appr.rate) incl. C/C of all materials and labour charges etc. Complete

2

600

300

... More
Towards cost of transportation charges of 30HP centrifugal pumpset from shop at Kurnool to site. incl. C/C of all materials and labour charges etc. Complete

2

1000

500

... More
Labour charges for erection of 30 HP three phase Monoblock centrifugal pumpset including pipe connection for suction and delivery and all labour charges etc. complete. incl. C/C of all materials and labour charges etc. Complete

2

13005

6502.5

... More
Removal charges of 10HP pumpset etc complete (appr.by As per SE/RWS /Knl dated: 07.10.2009) incl. C/C of all materials and labour charges etc. Complete

1

3100

3100

... More
Being the Loading,Transportation & Unloading of 10HP pumpset from site to Kurnool . incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Rewinding of 10HP three phase motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required (ELEC-5.9.14 (d)/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5250

5250

... More
Towards cost of Pump bushes. incl. C/C of all materials and labour charges etc. Complete

1

100

100

... More
Towards cost of Pump service charges. incl. C/C of all materials and labour charges etc. Complete

1

300

300

... More
Being the Loading,Transportation & Unloading of 10HP pumpset from Kurnool to site. . incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Labour charges for erection of 10 HP three phase submerssible pumpset(Open well) including pipe connection for suction and delivery and all labour charges etc., complete., incl. C/C of all materials and labour charges etc. Complete

1

4688

4687.5

... More
Removal charges of 20 HP pumpset etc complete (appr.by As per SE/RWS /Knl dated: 07.10.2009) incl. C/C of all materials and labour charges etc. Complete

1

3100

3100

... More
Towards cost of transportation charges of 20HP centrifugal pumpset from site to work shop at Kurnool. incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Rewinding of 20 HP Three Phase Monoblock pumpset up to 1400 RPM of all types and makes with copper wire, over hauling with minor repairs, testing for the original speed and no load consumption. incl. C/C of all materials and labour charges etc. Complete

1

18474

18473.76

... More
Towards Cost of Pump Impellers. incl. C/C of all materials and labour charges etc. Complete

1

375

375

... More
Towards Cost of Pump servicing charges. (dept appr.rate) incl. C/C of all materials and labour charges etc. Complete

1

300

300

... More
Towards cost of transportation charges of 20HP centrifugal pumpset from shop at Kurnool to site. incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Labour charges for erection of 20 HP three phase Monoblock centrifugal pumpset including pipe connection for suction and delivery and all labour charges etc. complete. incl. C/C of all materials and labour charges etc. Complete

1

18474

5595

... More
Removal charges of 46 HP pumpset etc complete (appr.by As per SE/RWS /Knl dated: 07.10.2009) incl. C/C of all materials and labour charges etc. Complete

1

3100

3100

... More
Being the Loading,Transportation & Unloading of 46HP pumpset from site to Kurnool . incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Rewinding of 46HP Polder submerssible pumpsest up to 1400 RPM of all types and makes with copper wire, over hauling with minor repairs, testing for the original speed and no load consumption . incl. C/C of all materials and labour charges etc. Complete

1

24632

24631.68

... More
Towards cost of Pump bushes. incl. C/C of all materials and labour charges etc. Complete

1

150

150

... More
Being the Loading,Transportation & Unloading of 46HP pumpset from Kurnool to site. . incl. C/C of all materials and labour charges etc. Complete

1

500

500

... More
Labour charges for erection of 46 HP Polder puompset submerssible pumpset including pipe connection for suction and delivery and all labour charges etc., complete., incl. C/C of all materials and labour charges etc. Complete

1

6653

6652.5

... More
Towards cost of 100HP pumpset removing, lifting and errection charges (rate appr.by EE/RWS/ Knl dt: 22.12.2011) incl. C/C of all materials and labour charges etc. Complete

1

8000

8000

... More
Being the Loading, Transportation & Unloading of 150HP pumpset from work site to Kurnool and vice versa etc, complete (rate appr.by EE/RWS /Knl dt:03.02.2015)(rate of100HP HSC pumpset) incl. C/C of all materials and labour charges etc. Complete

1

4500

4500

... More
Rewinding of 150HP Three Phase HSC pumpsest of all types and makes with copper wire, over hauling with minor repairs, testing for the original speed and no load consumption . incl. C/C of all materials and labour charges etc. Complete

1

92369

92368.8

... More
Towards cost of pump service charges. incl. C/C of all materials and labour charges etc. Complete

1

300

300

... More
Supply & delivery of Cooling gland (rate appr.by EE/ RWS/Knl dt: 22.12.2011) incl. C/C of all materials and labour charges etc. Complete

2

1200

600

... More
Cost of Heavy ball bearings suitable for 150 HP motor bearings No. NDE 6319-C3. (rate appr.by EE/RWS /Knl dt: 03.02.2015) incl. C/C of all materials and labour charges etc. Complete

2

11200

5600

... More
Labour charges for errection of 3 phase 150 HP HSC pumpset including pipe connection for suction and delivery and all labour charges etc complete incl. C/C of all materials and labour charges etc. Complete

1

8468

8467.5

... More
Towards cost of 177HP pumpset removing, lifting and errection charges (rate appr.by EE/RWS/Knl dt: 22.12.2011) incl. C/C of all materials and labour charges etc. Complete

1

8000

8000

... More
Being the Loading, Transportation & Unloading of 177 HP pumpset from work site to Kurnool and vice versa etc, complete (rate appr.by EE/RWS /Knl dt:03.02.2015)(rate of100HP HSC pumpset) incl. C/C of all materials and labour charges etc. Complete

1

4500

4500

... More
Rewinding of 177HP Three Phase HSC pumpsest of all types and makes with copper wire, over hauling with minor repairs, testing for the original speed and no load consumption . incl. C/C of all materials and labour charges etc. Complete

1

107764

107763.6

... More
Towards cost of pump service charges. incl. C/C of all materials and labour charges etc. Complete

1

300

300

... More
Supply & delivery of Cooling gland (rate appr.by EE/ RWS/Knl dt: 22.12.2011) incl. C/C of all materials and labour charges etc. Complete

2

1200

600

... More
Cost of Heavy ball bearings suitable for 150 HP motor bearings No. NDE 6319-C3. (rate appr.by EE/RWS /Knl dt: 03.02.2015) incl. C/C of all materials and labour charges etc. Complete

2

11200

5600

... More
Labour charges for errection of 3 phase 177 HP HSC pumpset including pipe connection for suction and delivery and all labour charges etc complete incl. C/C of all materials and labour charges etc. Complete

1

8468

8467.5

... More
Towards the cost of Loading and Unloading of Transformer from site to Workshop at Kurnool (MAT-04085/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5346

5346

... More
Replacing the HT/LT burntout winding coils of transformer including rewidning, varnishing, vacuming etc, for copper coils. (MAT-04072/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

45

32085

713

... More
Insulating HT / LT copper coils for Transformer (MAT-04074/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

25

9675

387

... More
Replacing HT bushing for transformer by new one. (MAT-04077/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

12

4992

416

... More
Replacing HT bushing with metal parts for transformer by new one (MAT-04078/ SSR23-24) incl. C/C of all materials and labour charges etc. Complete

12

5700

475

... More
Drying of repaied transformer with appropriate heaet / air. (MAT-04083/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5227

5227

... More
Transformer oil tested as per IS 335 1972. (ELEC-6.4.14 /SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

102

14586

143

... More
Towards the cost of Loading and Unloading of Transformer from Workshop at Kurnool to site (MAT-04085/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5346

5346

... More
Towards the cost of Loading and Unloading of Transformer from site to Workshop at Kurnool (MAT-04085/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5346

5346

... More
Replacing the HT/LT burntout winding coils of transformer including rewidning, varnishing, vacuming etc, for copper coils. (MAT-04072/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

45

32085

713

... More
Insulating HT / LT copper coils for Transformer (MAT-04074/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

21

8127

387

... More
Replacing HT bushing for transformer by new one. (MAT-04077/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

10

4160

416

... More
Replacing HT bushing with metal parts for transformer by new one (MAT-04078/ SSR23-24) incl. C/C of all materials and labour charges etc. Complete

10

4750

475

... More
Drying of repaied transformer with appropriate heaet / air. (MAT-04083/SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5227

5227

... More
Transformer oil tested as per IS 335 1972. (ELEC-6.4.14 /SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

102

14586

143

... More
Towards the cost of Loading and Unloading of Transformer from Workshop at Kurnool to site (MAT-04085/ SSR 2023-24) incl. C/C of all materials and labour charges etc. Complete

1

5346

5346



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.