Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date27 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 23,85,929 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply,delivery and stacking of Alumino-Ferric (ALUM) as per IS 299-2012, including cost of materials, conveyance, stacking at the location specified by the department and all taxes, duties and levies etc complete. (Dosage of Alum shall be based on the Jar Test)

5500

65175

11.85

... More
Labour charges for cleaning of sumps / GLBR including cleaning and removal of algae, calcinations, sludge, dirt deposition from side walls and bottion portion of the container by desinfection with bleaching powder with all necessary tools, plants labour charges and cost of disnfectant etc.

5319.2

10638

20

... More
Construction of pipelines for water supply with HDPE PE - 100 Grade pipes as per IS 4984 - 1995 specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding taxes Shifting of Gravity Main at Uppalamma temple : 315mm diaHDPE pipe line - 6Kg/cm2

200

734180

3670.9

... More
Construction of pipelines for water supply with HDPE PE - 100 Grade pipes as per IS 4984 - 1995 specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding taxes Shifting of Pumping Main at Uppalamma temple : 250mm dia HDPE pipe line - 6Kg/cm2

120

294228

2451.9

... More
Repairs and Renewals

-

-

-

... More
Manufacture, Supply, & Delivery of HDPE Pipes conforming to IS 4984 - 2016 including transportation to anywhere in A.P, excluding all taxes (Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) ( As per SOR & Monthly approved Resin Rates)

-

-

-

... More
Cost and supply of 250 mm dia HDPE 6Kg/Cm²

6

10544

1757.44

... More
Cost and supply of 280mm dia HDPE 6Kg/Cm²

12

33185

2765.47

... More
Manufacture, supply & Delivery of Unplasticised PVC Pipes for portable water supplies conforming to IS:4985/2000 (3rd revision) with bell ends(Socket) as per specification in light Grey/Natural Ivory Grey/Any other Colour (except white) inclusive of transportation to the sub -divisional stores anywhere in AP excluding all taxes As per SOR & Monthly approved resin rates)

-

-

-

... More
Cost and supply of 90 mm dia PVC 6Kg/Cm²

12

2210

184.22

... More
Cost and supply of 110 mm dia PVC 6Kg/Cm²

12

3206

267.24

... More
Cost and supply of 140 mm dia PVC 6Kg/Cm²

12

5267

438.98

... More
Cost and supply of 160 mm dia PVC 6Kg/Cm²

12

6808

567.35

... More
Cost and supply of 180 mm dia PVC 6Kg/Cm²

6

4384

730.82

... More
Cost and supply of 200 mm dia PVC 6Kg/Cm²

6

5343

890.62

... More
Cost and supply of 225 mm dia PVC 6Kg/Cm²

6

7146

1191.02

... More
Cost and supply of 280mm dia PVC 6Kg/Cm²

6

10986

1831.1

... More
Cost and supply of 315mm dia PVC 6Kg/Cm²

12

27850

2320.89

... More
Labour charges for leakages in PVC pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipeline, jointing & replacing using CID joint including CID joint inclusive of using all required machinery, labour, D.G Set, fuel, operator, CID joints, rubber rings, nuts bolts etc complete(but excluding cost of pipe)

-

-

-

... More
90 mm dia PVC pipeline

4

6016

1504

... More
110 mm dia PVC pipeline

3

6472

2157.4

... More
140 mm dia PVC pipeline

3

7529

2509.7

... More
160 mm dia PVC pipeline

3

10935

3645

... More
180 mm dia PVC pipeline

3

11211

3737

... More
200 mm dia PVC pipeline

3

12565

4188.4

... More
225 mm dia PVC pipeline

2

10740

5370.2

... More
280 mm dia PVC pipeline

2

14170

7085.3

... More
315 mm dia PVC pipeline

2

14170

7085.3

... More
Labour charges for leakage in HDPE pipe line of following diameter of different places including necessary excavation manually or by machinery, dewatering, removing of mud, cleaning of pipe and leakage portion, cutting the pipeline, jointing & replacing using CID joint including CID joint inclusive of using all required machinery, labour, D.G Set, fuel, operator, CID joints, rubber rings, nuts bolts etc complete(but excluding cost of pipe)

-

-

-

... More
250 mm dia HDPE pipeline

2

13051

6525.58

... More
315 mm dia HDPE pipeline

2

14133

7066.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.