To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date8 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 17,55,153 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz..enclosed with no volt coil and overload protection with necessary materials, etc., complete suitable for…..5 to 7.5HP. Makes : As per list of recommended brands.

3

2873

8619.96

... More
Supply, Delivery of D.I Double Flanged Swing Check type Reflux valves (Non Return Valves) of following dia. conforming to IS- 5312 (Pts-1&2) (with amendments up to date, if any) having Body, Cover, Door, Bearing holder with D.I; Hinge pin, Door pin, Door suspension pin with Stainless Steel (IS 6603); Body seat ring , Door face ring, Bearing bushes, Plugs for hinge pin with Leaded Tin Bronze ( IS 318 ); Bolts, Nuts with Carbon steel; Gaskets with Rubber; Hinges with Cast steel; excluding transportation and all taxes complete.50 mm dia PN 1.60

3

15309

45928.86

... More
Conveyance of valves and accessories including loading at factory and unloading, stacking at site of work.

3

765

2296.44

... More
Earthwork excavation in all types of soils with initial llead and lift etc

33.41

246

8222.2

... More
Filling the Foundation with sand including cost,conveyance,watering and ramming etc complete

13.26

1763

23377.38

... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete including Overheads & C.Profit @13.615% Under Foundation,Deduct center wall, steps for flooring

4.05

5863

23748.8

... More
VRCC(1:1.5:3) M20 grade Nominal mix using 20 mm gauge HBG metal including cost and conveyance of all materials and labour charges etc., complete excluding steel and ts fabrication charges including Overheads and contractor profit @13.615 %- For Columns

1.17

13158

15395.45

... More
VRCC M20 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For footings

3.04

10498

31914.53

... More
VRCC M20 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For beams

2.5

12589

31473.75

... More
VRCC M20 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For slab

3.6

13355

48079.08

... More
Brick Masonary with CM(1:6) using bricks(290x225x140)including cost and conveyance of all the materials ect complete

4.88

8295

40483.99

... More
Cement Plastering with CM (1:5) 12mm thick including cost and conveyance of all material, labour charges etc., complete including Overheads & C.Profit @13.615%

36.87

3555

13109.5

... More
Supply and placing of the HYSD bars,fabrication including cost and conveyance of all the materials etc omplete

578.19

86481

50002.74

... More
Construction of Pipelines for water supply of HDPE PE-100 grade pipes as per IS specifications, with its amendments and revisions thereon including supplying of pipes, necessary specials such as Bends, Tees etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for pipelines in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, lamping and removing surpulus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifictions (Part-B, Volume-1) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of Pipe Line work but exculding GST , the rare includes Overheads and Contractors profit @13.615% for 110mm dia HDPE 6Kg/Cm2, using manual labor Excavation )

300

708

212427

... More
Construction of Pipelines for water supply of HDPE PE-100 grade pipes as per IS specifications, with its amendments and revisions thereon including supplying of pipes, necessary specials such as Bends, Tees etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for pipelines in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, lamping and removing surpulus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifictions (Part-B, Volume-1) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of Pipe Line work but exculding GST , the rare includes Overheads and Contractors profit @13.615% for 110mm dia HDPE 6Kg/Cm2, (using 2/3 Machinery and 1/3 manual labor Excavation )

350

581

203493.5

... More
Earthwork excavation in all types of soils with initial llead and lift etc

84.86

246

20884.05

... More
Filling the Foundation with sand including cost,conveyance,watering and ramming etc complete

7.13

1763

12570.19

... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete including Overheads & C.Profit @13.615% Under Foundation,Deduct center wall, steps for flooring

4.75

5863

27853.52

... More
VRCC(1:1.5:3) M30 grade Nominal mix using 20 mm gauge HBG metal including cost and conveyance of all materials and labour charges etc., complete excluding steel and ts fabrication charges including Overheads and contractor profit @13.615 %- For bottom raft

4.75

11033

52411.03

... More
VRCC M30 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For sidewalls

6.49

24988

162174.07

... More
VRCC M30 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For Tap slab with 0.12 thickness

21.25

15466

32865.68

... More
Snowcem Painting including cost and conveyance of all the materials ncluding Overheads & C.Profit @13.615% For Tap slab with 0.12 thickness etc complete

7.7

1395

1074.23

... More
Cement Plastering with CM (1:3) 12mm thick including cost and conveyance of all material, labour charges etc., complete including Overheads & C.Profit @13.615%

7.7

3693

2844.15

... More
Accoproof Plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ncluding Overheads & C.Profit @13.615% For Tap slab with 0.12 thickness etc complete

72.58

3845

27909.91

... More
Supply and placing of the HYSD bars,fabrication including cost and conveyance of all the materials etc omplete

0.9

86481

77833.35



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.