Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Water Storage And Supply
Opening Date8 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 17,55,153
Costs
EMD
₹ 17,552Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
763847Tender No
52/ATO/2024-25, Dt:22.10.2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz..enclosed with no volt coil and overload protection with necessary materials, etc., complete suitable for…..5 to 7.5HP.
Makes : As per list of recommended brands.
3
2873
8619.96
... More
Supply, Delivery of D.I Double Flanged Swing Check type Reflux valves (Non Return Valves) of following dia. conforming to IS- 5312 (Pts-1&2) (with amendments up to date, if any) having Body, Cover, Door, Bearing holder with D.I; Hinge pin, Door pin, Door suspension pin with Stainless Steel (IS 6603); Body seat ring , Door face ring, Bearing bushes, Plugs for hinge pin with Leaded Tin Bronze ( IS 318 ); Bolts, Nuts with Carbon steel; Gaskets with Rubber; Hinges with Cast steel; excluding transportation and all taxes complete.50 mm dia PN 1.60
3
15309
45928.86
... More
Conveyance of valves and accessories including loading at factory and unloading, stacking at site of work.
3
765
2296.44
... More
Earthwork excavation in all types of soils with initial llead and lift etc
33.41
246
8222.2
... More
Filling the Foundation with sand including cost,conveyance,watering and ramming etc complete
13.26
1763
23377.38
... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete including Overheads & C.Profit @13.615% Under Foundation,Deduct center wall, steps for flooring
4.05
5863
23748.8
... More
VRCC(1:1.5:3) M20 grade Nominal mix using 20 mm gauge HBG metal including cost and conveyance of all materials and labour charges etc., complete excluding steel and ts fabrication charges including Overheads and contractor profit @13.615 %- For Columns
1.17
13158
15395.45
... More
VRCC M20 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For footings
3.04
10498
31914.53
... More
VRCC M20 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For beams
2.5
12589
31473.75
... More
VRCC M20 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For slab
3.6
13355
48079.08
... More
Brick Masonary with CM(1:6) using bricks(290x225x140)including cost and conveyance of all the materials ect complete
4.88
8295
40483.99
... More
Cement Plastering with CM (1:5) 12mm thick including cost and conveyance of all material, labour charges etc., complete including Overheads & C.Profit @13.615%
36.87
3555
13109.5
... More
Supply and placing of the HYSD bars,fabrication including cost and conveyance of all the materials etc omplete
578.19
86481
50002.74
... More
Construction of Pipelines for water supply of HDPE PE-100 grade pipes as per IS specifications, with its amendments and revisions thereon including supplying of pipes, necessary specials such as Bends, Tees etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for pipelines in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, lamping and removing surpulus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifictions (Part-B, Volume-1) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of Pipe Line work but exculding GST , the rare includes Overheads and Contractors profit @13.615% for 110mm dia HDPE 6Kg/Cm2, using manual labor Excavation )
300
708
212427
... More
Construction of Pipelines for water supply of HDPE PE-100 grade pipes as per IS specifications, with its amendments and revisions thereon including supplying of pipes, necessary specials such as Bends, Tees etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation for pipelines in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, lamping and removing surpulus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifictions (Part-B, Volume-1) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of Pipe Line work but exculding GST , the rare includes Overheads and Contractors profit @13.615% for 110mm dia HDPE 6Kg/Cm2, (using 2/3 Machinery and 1/3 manual labor Excavation )
350
581
203493.5
... More
Earthwork excavation in all types of soils with initial llead and lift etc
84.86
246
20884.05
... More
Filling the Foundation with sand including cost,conveyance,watering and ramming etc complete
7.13
1763
12570.19
... More
Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete including Overheads & C.Profit @13.615% Under Foundation,Deduct center wall, steps for flooring
4.75
5863
27853.52
... More
VRCC(1:1.5:3) M30 grade Nominal mix using 20 mm gauge HBG metal including cost and conveyance of all materials and labour charges etc., complete excluding steel and ts fabrication charges including Overheads and contractor profit @13.615 %- For bottom raft
4.75
11033
52411.03
... More
VRCC M30 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For sidewalls
6.49
24988
162174.07
... More
VRCC M30 grade concrete using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges including Overheads & C.Profit @13.615% For Tap slab with 0.12 thickness
21.25
15466
32865.68
... More
Snowcem Painting including cost and conveyance of all the materials ncluding Overheads & C.Profit @13.615% For Tap slab with 0.12 thickness etc complete
7.7
1395
1074.23
... More
Cement Plastering with CM (1:3) 12mm thick including cost and conveyance of all material, labour charges etc., complete including Overheads & C.Profit @13.615%
7.7
3693
2844.15
... More
Accoproof Plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ncluding Overheads & C.Profit @13.615% For Tap slab with 0.12 thickness etc complete
72.58
3845
27909.91
... More
Supply and placing of the HYSD bars,fabrication including cost and conveyance of all the materials etc omplete
0.9
86481
77833.35
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements