Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Civil And Construction
Civil Works Others
Opening Date16 Sep 2022
Closing Date1 Oct 2022
Tender Amount₹ 5,42,88,366 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

31680

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

369

-

161511

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

692

-

343163

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

102

-

58834

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber

3

-

109110

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (125mm dia on 125mm HDPE pipe) with valve chamber

1

-

62367

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

127899

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

50

-

11419

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

50

-

22326

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

50

-

60000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

50

-

72500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110 mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

33400

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

30

-

48960

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

33

-

53064

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

30

-

47520

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

307

-

134374

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

194

-

96205

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

55

-

31724

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

10

-

9780

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

72740

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48195

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 140mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

61737

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85266

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

20

-

4567

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

15

-

6698

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

20

-

24000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

15

-

21750

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

270

-

128817

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

270

-

128817

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

300

-

160740

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

94

-

58045

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125 mm dia line) with valve chamber 0.9x0.75x1.05m

1

-

43554

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

3

-

3600

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

60

-

97920

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe / 175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burried channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebullied pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, clamps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per ISI specification used for rotary tube well. The 116 pebbled gravel packing should be carried out in such a way that the theoritical quantity consumed completely. The entire work to be carried out as per I.S. 2800 Part - I & II of 1979 and including cost of all materials and all labour charges and cp excluding all taxes etc.,

18.3

-

26916.74

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cost and supply of 175mm dia Blue casinfg pipe

18.3

-

22870.61

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Slotting charges for 175mm dia blue casing pipe

6

-

2385.9

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and fixing of 180mm Bore cap

1

-

340.85

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Geological survey charges

1

-

1363.38

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and Transportation of 3HP 5-10Stages???..,5star rated submersible motor pumpset, confirming to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump shall be suitable for various delivery head and discharge with stainless steel shaft.Motor suitable for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 6" Bore well. Makes : As per list of recommended brands as category I. including cp@13.615%

1

-

37492.95

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Fabrication ,transportationand and supply of wall mounted control panel board of size 600x600x250mm made of 18 SWG CRCA sheet steel enclosure, 14 SWG mounting plate for cable entry fabricated , painted with two coats of Red oxide primer and two coats of Grey paint, lock and key arrangements two side lovures with weld mesh inside etc., complete consisting of the following equipment with all internal wiring using L&T / Finolex copper FRLS cables of suitable size and capacity and cable clamp etc complete for 3 phase motor pump sets. Makes : As per list of recommended brands . Voltmeter ; 0-500 V 96x96mm size. 0 to 20 Amps / 0 50 Amps Ammeter (96x96mm size)-1No. Single phase preventor of suitable range - 1No. 32 A TP, 10KA MCB. - 1No Indication lamps (R-Y-B) with switch control - 1set Voltmeter & Ammeter selector switch - 2 Nos Supply and fixing of ISI Mark suitable capacitor 220 MAT-03713 Upto 7.5HP including cp@13.615%

1

-

10997.93

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cost and Supply of 75mm dia HDPE 10Kg/Cm^2

23

-

6244.04

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

650

-

310115

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

750

-

401850

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

500

-

308750

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

1100

-

837760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125 mm dia line) with valve chamber 0.9x0.75x1.05m

2

-

87212

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

70

-

84000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

100

-

163200

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

971

-

425007

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

667

-

330765

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

312

-

179962

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

321

-

230831

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

292

-

285576

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 160mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

330

-

410619

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia Gate Valve on 110mm dia Pipe Line)

1

-

22954

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber 0.9x0.75x1.05m

1

-

36297

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.90x0.90x 1.40m

1

-

62273

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125 mm dia line) with valve chamber 0.9x0.75x1.05m

1

-

42560

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

25050

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

24480

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

24120

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

23760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

410

-

179457

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

55

-

27275

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

407

-

234758

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

164

-

160392

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 160mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

25

-

31108

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36290

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

72898

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48299

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62471

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85424

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

20

-

4567

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

20

-

8930

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

20

-

24000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

20

-

29000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

2.08

-

7302

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

2.08

-

15893

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

25

-

41750

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

30

-

48960

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

41

-

65928

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

23760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

50

-

21885

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

30

-

14877

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36449

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85424

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

1.26

-

4423

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

1.26

-

9628

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

32640

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

25

-

40200

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

27

-

42768

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

370

-

213416

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

47

-

33798

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

72898

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62471

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85424

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

1.41

-

4950

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

1.41

-

10774

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

25050

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

32640

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

32160

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

31680

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

468

-

204844

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

506

-

250925

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

467

-

269366

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

201

-

144539

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

72468

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

96046

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

127491

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

0.88

-

3089

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

0.88

-

6555

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

23760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

17

-

27336

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

24480

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

220

-

96294

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

36

-

17852

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

212

-

122282

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

57

-

40989

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36572

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48455

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85670

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

1.61

-

5652

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

1.61

-

12476

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

17

-

28390

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

23

-

37536

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75 mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

23

-

36984

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

23

-

36432

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

248

-

108550

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

36

-

17852

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

212

-

122282

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

57

-

40989

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36572

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

96910

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62627

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85670

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

0.99

-

3476

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

0.99

-

7672

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

18

-

29376

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75 mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

32160

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

23760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

331

-

144879

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

187

-

92733

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia Gate Valve on75mm Pipe Line) with valve chamber size 0.9x0.90x1.40m

1

-

36178

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia Gate Valve on90mm Pipe Line) with valve chamber size 0.9x0.90x1.40m

1

-

36337

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48152

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe)with valve chamber size 0.9x0.75x1.05m

2

-

85200

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

0.69

-

2422

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

0.69

-

5202

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

7

-

11424

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

24120

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

23760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

171

-

74847

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

344

-

170590

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia Gate Valve on 90mm Pipe Line) with valve chamber size 0.9x0.90x1.40m

1

-

36337

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48152

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62324

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85200

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

32160

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

12

-

19008

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

251

-

109863

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

403

-

199848

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

110

-

63448

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36553

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62600

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

128448

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

5

-

2233

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

5

-

7250

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

16700

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

16320

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

16080

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

9

-

14256

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

459

-

200904

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

746

-

369941

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

138

-

79598

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

223

-

160359

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 160mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

104

-

129407

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe )with valve chamber size 0.9x0.75x1.05m

4

-

144828

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

95976

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia Gate Valve on 160mm Pipe Line) with valve chamber size 0.9x0.90x1.40m

1

-

62160

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

5

-

212350

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

50

-

11419

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

50

-

22326

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

50

-

60000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

50

-

72500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

2.87

-

10076

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

2.87

-

21310

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

25

-

41750

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

43

-

70176

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

45

-

72360

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

40

-

63360

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

4

-

6432

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

3

-

4752

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

294

-

128684

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

33

-

16365

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

72674

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

127800

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

20

-

4567

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

15

-

6698

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

20

-

24000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

15

-

21750

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

6

-

9792

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

367

-

160636

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36553

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

42816

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

5

-

2233

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

5

-

7250

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

6

-

9792

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

3

-

4824

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

3

-

4752

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

147

-

64342

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

93

-

46119

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

900

-

647190

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Tamper Proof DI Flanged Single Chamber Air Release Valve with Body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005 and subsequent revisions The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615% with valve chamber 40mm dia Air Valve on 110mm pipe Line

3

-

140973

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 75mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36394

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

46428

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85632

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

5

-

2233

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

5

-

7250

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

100

-

43770

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

424

-

210262

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

375

-

216300

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

252

-

181213

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 75mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36211

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36370

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48195

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

127899

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

1.54

-

5406

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

1.54

-

11656

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

23760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

16700

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

30

-

48960

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

27

-

43416

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

354

-

154946

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

117

-

58020

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

369

-

212839

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

193

-

138786

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

927

-

906606

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615% (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36449

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615% (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62471

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615% (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85424

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

1.41

-

4950

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

1.41

-

10774

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

25050

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

32640

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

25

-

40200

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

23760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

222

-

97169

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

101

-

50086

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

324

-

186883

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

929

-

668044

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Tamper Proof DI Flanged Single Chamber Air Release Valve with Body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005 and subsequent revisions The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615% with valve chamber 40mm dia Air Valve on 110mm pipe Line

1

-

46862

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Tamper Proof DI Flanged Single Chamber Air Release Valve with Body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005 and subsequent revisions The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615% with valve chamber 50mm dia Air Valve on 140mm Pipe Line

1

-

58197

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia Gate Valve on 90mm Pipe Line) with valve chamber size 0.9x0.90x1.40m

1

-

36449

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48299

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia Gate Valve on 160mm Pipe Line )with valve chamber size 0.9x0.90x1.40m

1

-

62471

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85424

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

0.66

-

2317

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

0.66

-

5043

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

16320

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

16080

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

23760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

31

-

13569

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

450

-

223155

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

350

-

201880

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

20

-

14382

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 125mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

71

-

59668

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

524

-

512472

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36406

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62613

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia Scour Valve on 90-125mm Pipe Line) with valve chamber size 0.9x0.75x1.05m

1

-

42828

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

2.81

-

9865

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

2.81

-

21742

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

35

-

55440

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

35

-

56280

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

35

-

57120

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

35

-

58450

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 125mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

17140

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

1146

-

501604

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

158

-

78352

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

752

-

433754

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

64

-

46022

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 125mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

259

-

217664

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

162

-

158436

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 160mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

117

-

145583

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 200mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

82

-

142688

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 250mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

30

-

76524

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%.(80mm dia on 75mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36290

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36449

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48299

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (200mm dia on 200mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

79981

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85424

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

0.88

-

3089

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

0.88

-

6724

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

16700

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

15

-

24480

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

12

-

19296

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

10

-

15840

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

137

-

59965

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

703

-

348618

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

144

-

83059

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

275

-

197753

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

442

-

432276

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 160mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

503

-

625883

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

72740

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 180mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

63501

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85266

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

5.25

-

18431

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

5.25

-

39738

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 140mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

40

-

70680

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

60

-

100200

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

60

-

97920

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

60

-

96480

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

60

-

95040

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

226

-

98920

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

128

-

63475

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

207

-

119398

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

68

-

48899

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

1131

-

1106118

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Tamper Proof DI Flanged Single Chamber Air Release Valve with Body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005 and subsequent revisions 50 on 140 Pipeline including valve chamber. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

2

-

116394

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 75mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

108870

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

72898

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

48299

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

124942

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

128136

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

10

-

14500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

2.44

-

8566

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

2.44

-

18644

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

25

-

41750

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

25

-

40800

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

45

-

72360

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

35

-

55440

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63visions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

245

-

107237

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

445

-

220676

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

317

-

182846

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

91

-

65438

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

707

-

691446

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Air Valves (Air Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (40mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

46790

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Air Valves (Air Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (50mm dia on 140mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

58125

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

3

-

144681

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 140mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

61769

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe)(100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85314

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

19.4

-

23280

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

59

-

93456

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

58

-

93264

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

1104

-

547474

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

655

-

377804

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

795

-

571685

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Air Valves (Air Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (40mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

93632

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

96506

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

42678

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

288

-

456192

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

148

-

64780

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

614

-

354155

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 125mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

2100

-

1764840

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Air Valves (Air Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (50mm dia on 125mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

3

-

164628

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

36631

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

42894

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

87

-

137808

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

346

-

151444

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

364

-

180508

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

659

-

380111

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Air Valves (Air Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (40mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.79x1.40m

1

-

38179

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

36455

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63-125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85436

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

20

-

24000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

64

-

101376

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

412

-

204311

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

361

-

208225

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

109767

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63 to 125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85704

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

9.95

-

11940

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

75

-

120600

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

227

-

99358

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

248

-

122983

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

1479

-

853087

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Air Valve on equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (40mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

38281

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valve on equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

3

-

109671

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63 to 125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

42820

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

150

-

237600

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

716

-

355064

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

48

-

27686

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valve on equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

1

-

36598

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve on equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85722

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

20

-

24000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

29

-

46632

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

2708

-

1342897

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

1418

-

817902

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

15

-

14670

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

96112

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63 to 125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85044

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75 mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

503

-

808824

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

332

-

145316

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

424

-

210262

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

379

-

272539

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

96764

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63 to 125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

4

-

171120

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

20

-

4567

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

4465

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

20

-

24000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

140

-

221760

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

25

-

40200

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

953

-

417128

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

1430

-

709137

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

543

-

313202

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

558

-

401258

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

2850

-

2787300

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Tamper Proof DI Flanged Single Chamber Air Release Valve with Body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005 and subsequent revisions The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615% with valve chamber 40mm dia Air Valve on 110mm pipe Line

5

-

291340

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

73020

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

96740

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62542

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63 to 125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

85546

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

10

-

2284

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

125

-

201000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

125

-

198000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and transportation of 5HP(80x80mm) threee phase ISI self priming Monoblock IP44 Motor pumpset category I including contractor profit @13.615%

1

-

31894

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

10

-

12000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 63mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

820

-

358914

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

2076

-

1029488

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 90mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

512

-

295322

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 110mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

393

-

282606

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 140mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

227

-

222006

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of pipelines for water supply with 160mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, toal trench excavation manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and contractor's profit @ 13.615%

598

-

744091

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 90mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

2

-

72414

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (100mm dia on 110mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

2

-

95976

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (150mm dia on 160mm HDPE pipe) with valve chamber size 0.9x0.90x1.40m

1

-

62160

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Supply and delivery of "Resilient Seated Soft Sealing" Scour Valve with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS:1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The valves should be Vacuum tight and 100% leak proof with face to face dimensions as per BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS:1538, construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc., complete for finished item of work. The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of work, but excluding GST and Seigniorge charges as specified in Technical specifications including overheads and Contractor's profit @ 13.615%. (80mm dia on 63 to 125mm HDPE pipe) with valve chamber size 0.9x0.75x1.05m

3

-

127410

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 150mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

50

-

11419

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Manufacure, supply & delivery of 300mm dia R.C.C plain end pipes confirming to BIS 458/2003 including overheads and Contractor's profit @ 13.615% etc., complete.

50

-

22326

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary including labour michanary and incidential charges etc., complete (upto 150mm dia)

50

-

60000

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Provision for Horzontal Bore drilling for road crossing by manual/michanary inclyuding labour michanary and incidential charges etc., complete (upto 300mm dia)

50

-

72500

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Cutting road surface including stacking of excavated materials for pipe line trench work, Cut opening of Cement Concrete road surface with concrete saw cutter and removal with breaker etc., including all charges compete, including overheads and contractor's profit @ 13.615% but excluding GST and seignourage charges

1.5

-

5266

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;RCC M-20 Nominal mix (Cement:Fine aggregae:Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm sixe graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like Cement, fine aggregate (Sand) corse aggregate, water etc., to site and including Seigniorage chares. Sales & other taxes on all materials including all opertional, incidental and labour chares such as machine mixing, laying concrete, curing etc., complete but excluding cost of stel and its fabrication charges for finsihded item of work, but excluding contering, shutting for road way cover slabs rate

1.5

-

11138

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 110 mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

33400

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 90mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

32640

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 75mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

32160

... More
Constituency wise packaging of works for Providing FHTCs by utilizing existing infrastructure retrof;Construction of Function Hold Tap Connections (FHTC) with supply & fixing of PP Clamp Saddle manufactured by injection moulding (virgin resin of PE-80/PE-100 having blue /black colour using food grade compound raw material with quality assurance cerificate for usage in drinking water system and having working pressure of 10 bar for 63mm dia main with 1/2" service connection) and supply and fixing of required materials such as Non-return cum flow control valve (with all three parts made by using solid steel bars of 316, wth CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.50 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle as per CPHEO manual), compression fittings (ISO:17885-2015, PN 16 rating and manufactured from virgin resin of PE-80/PE100 having blue colour. Raw material must be as per BS:6920 for effect on water quality, should have moulded in SS 304/Nickel plated brass female threded outlet inserted to connection necessary fitting with threaded dimension conforming to IS 554/1507 which are Compression male/female threaded adaptor (with SS insert D20 mmx 1/2"), Compression male/female threaded elbow (with SS insert D20 mmx 1/2")), including supply, delivery and fixing of 15mm dia B class GI pipe as per IS1239 with necessay GI fittings including 20mm dia HDPE pipe 16.0 Kg/cm2 pipes, earth work of trench excavation up to 0.50m depth), and 12.7mm dia Brass Bib cock long body Indian make heavy duty excluding GST and Seigniorge charges, including contractor' profit & overheads @ 13.615%.

20

-

31680



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.