To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Civil Works Others
Opening Date29 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 26,91,516
Costs
EMD
₹ 26,920Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
746173Bid Award Id
ViewTender No
No.16/2024-25, Dt.03-07-2024Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supply and delivery of Ferric Alum including transportation charges. The rate is excluding of GST @ 18%.
20
237000
11850
Cost and supply of 315 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
13925
2320.89
Cost and supply of 280 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
10986
1831.1
Cost and supply of 250 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
12
17428
1452.37
Cost and supply of 225 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
7146
1191.02
Cost and supply of 200 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
12
10687
890.62
Cost and supply of 160 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
3404
567.35
Cost and supply of 140 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
12
5267
438.98
Cost and supply of 110 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
1603
267.24
Cost and supply of 90 mm dia PVC Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
1105
184.22
Cost and supply of 355 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
20118
3353.06
Cost and supply of 315 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
12
33185
2765.47
Cost and supply of 280 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
12
26326
2193.86
Cost and supply of 225 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
8544
1424.1
Cost and supply of 200 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
6763
1127.2
Cost and supply of 160 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
3
2169
723.19
Cost and supply of 140 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
6
3308
551.48
Cost and supply of 125 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
2
883
441.88
Cost and supply of 110 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
4
1381
345.42
Cost and supply of 90 mm dia HDPE Pipes 6 Kg/cm2 excluding all taxes and conveyance charges etc complete.
4
909
227.28
Repair to 315 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
1
8621
8621.7
Repair to 280 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
1
6568
6568
Repair to 250 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
4
23102
5775.5
Repair to 225 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
2
10647
5323.5
Repair to 200 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
4
16566
4141.7
Repair to 160 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
2
7226
3613.4
Repair to 140 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
6
14868
2478
Repair to 110 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
2
4275
2137.7
Repair to 90 mm dia PVC pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
2
2977
1488.5
Repair to 355 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
1
8713
8713.08
Repair to 315 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
4
27647
6911.86
Repair to 280 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
4
27647
6911.86
Repair to 225 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
1
5814
5814.92
Repair to 200 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
2
9598
4799.14
Repair to 160 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
1
4178
4178.48
Repair to 140 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
3
9306
3102.1
Repair to 125 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
1
2541
2541.52
Repair to 110 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
2
5083
2541.52
Repair to 90 mm dia HDPE pipe lines including joints, specials as per requirement, trench excavation by manual in all soils except rock requiring blasting, lowering, laying and jointuing of pipe line to alignment and gradient refilling trench with excavated earth as per specification, watering, tampering and removing surpules earth from site work, filling pipe line as per specification etc. complete. The rates are inclusive of cost, conveyence of all materiels and all labour charges etc. complete finished item of work (excluding cost of pipe.)
2
3651
1825.68
Rewinding charges of 25 HP Submersible electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications
3
89478
29826
Rewinding charges of 30 HP Submersible electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications
3
107373
35791.2
Rewinding charges of 20 HP Monoblock electircal motor and pump set, including cost of copper wire, cost of spares, cost of all required accessories, rewinding charges, foundry charges and re errection etc complete as per standard specifications
5
104067
20813.58
Provision for Clearing away light jungle, including clearing away, stacking and burning into ashes etc. complete.
20000
56000
2.8
(Rupees Twenty Six Lakhs Ninety One thousand five hundred fifteen and Paise Ninety Four only)
-
2691515
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements