Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Road Construction
Opening Date25 Jul 2024
Closing Date8 Aug 2024
Tender Amount₹ 3,23,975
Costs
EMD
₹ 5,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
743925Tender No
Tender Notices.Nit.No.58/ATO/2024-25, dt:18.07.2024 of the Executive Engineer, PIU Division, EluruTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD/305 MORTH including overhead charges & Contractor profit, but excluding GSTand Seignorage charges etc., complete for finished item of work..
54
12510
231.67
Providing and applying primer coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work..
337.5
14313
42.41
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.
337.5
4839
14.34
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using HBG crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work.
8.44
89814
10641.48
Construction of Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST and seigniorage charges etc, complete for finished item of work.
27
15847
586.96